| 2015-09-14 11:35:42 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15090106 |
| | 9/14/15 |
| | |
| | 1) A NEW DX SPLIT AC SYSTEM IS SHOWN ON THE PLANS- |
| | PLEASE REVISE NEW WORK NOTE #1 ON SHEET M2 INDICATING |
| | REBALANCING AN EXISTING RTU. |
| | 2) REFER TO SECTION C403.2.1 FBC-14 ENERGY CONSERVATION |
| | AND PROVIDE AC COOLING AND HEATING CALCULATIONS: |
| | CALCULATION OF HEATING AND COOLING LOADS. |
| | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| | SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| | WITH THE ASHRAEHVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| | 3) PROVIDE AN EQUIPMENT SCHEDULE FOR THE HWB-1 HOT |
| | WATER BOILER. |
| | 4) PLEASE SHOW THE LOCATION OF THE RFM-1 MANIFOLD AS |
| | SHOWN IN THE RADIANT SCHEDULE. |
| | 5) PROVIDE PRIMARY AND SECONDARY CONDENSATE DISPOSAL |
| | PLANS FOR THE NEW AHU- REFER TO SECTION 307 FBC-14 |
| | MECHANICAL. |
| | 6) PROVIDE PIPE PROTECTION DETAILS FOR THE HOT WATER |
| | PIPING. INDICATE THE TYPE AND THICKNESS OF CONDUIT AND |
| | SLEEVING TO BE USED FOR THE UNDERGROUND/UNDERSLAB |
| | INSTALLATION- REFER TO SECTIONS 305.1.1 FBC-14 |
| | PLUMBING. |
| | 7) PROVIDE THE BURIAL DEPTH AND DEPTH OF BACKFILL FOR |
| | THE HOT WATER PIPING- REFER TO SECTION 306.3 FBC-14 |
| | PLUMBING. |
| | 8) SUBMIT PRODUCT DATA (CUT) SHEETS FOR THE PEX PIPING, |
| | AND FOAM INSULATION. |
| | 9) SUBMIT TWO COPIES OF FLORIDA PRODUCT APPROVALS OR |
| | MIAMI-DADE NOA'S FOR THE LOUVERS- SEE FLORIDA |
| | DEPARTMENT DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3. |
| | 10) REFER TO SECTION C403.2.4.4 FBC-14 ENERGY |
| | CONSERVATION AND SHOW COMPLIANCE: SHUTOFF DAMPER |
| | CONTROLS. |
| | BOTH OUTDOOR AIR SUPPLY AND EXHAUST DUCTS SHALL BE |
| | EQUIPPED WITH MOTORIZED DAMPERS THAT WILL AUTOMATICALLY |
| | SHUT WHEN THE SYSTEMS OR SPACES SERVED ARE NOT IN USE. |
| | EXCEPTIONS: |
| | 1. GRAVITY DAMPERS SHALL BE PERMITTED IN BUILDINGS LESS |
| | THAN THREE STORIES IN HEIGHT. |
| | 2. GRAVITY DAMPERS SHALL BE PERMITTED FOR BUILDINGS OF |
| | ANY HEIGHT LOCATED IN CLIMATE ZONES 1, 2 AND 3. |
| | 3. GRAVITY DAMPERS SHALL BE PERMITTED FOR OUTSIDE AIR |
| | INTAKE OR EXHAUST AIRFLOWS OF 300 CFM (0.14 M3/S) OR |
| | LESS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |