| Plan Review Notes For Permit 15090051 |
| Permit Number |
15090051 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-09-09 17:08:43 | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | 561-805-6711 | | | [email protected] | | | | | | | | | PLUMBING COMMENTS: | | | | | | 1.LAUNDRY SHALL TIE INTO BUILDING DRAIN DOWN STREAM OF | | | BATHROOM GROUP. | | | PER FBC RES. PLUMB. SEC. P3108.1 | | | | | | | | | 2. IN PLUMBING NOTES P3 INDICATES EXISTING WASHING | | | MACHINE BEING RELOCATED TO NEW LOCATION NEED TO SHOW | | | NEW LOCATION OR INDICATE NO EXISTING . | | | PER WPB AMEND. 107.2.1 | | | | | | 3. PROVIDE SPECS FOR TANKLESS WATER HEATER | | | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECTS THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE FBC, | | | FUEL GAS, SEC.301.3. | | | |
|