2015-11-12 17:39:272ND REVIEW: FBC 2014 MECHANICAL
 PERMIT #15081109
 11/12/15
  
 1) REFER TO SECTION C403.2.2 FBC-14 ENERGY
 CONSERVATION: THE OUTPUT CAPACITIES OF THE AC SYSTEMS
 IN THE EQUIPMENT SCHEDULE ON SHEET M1 ARE EXCEEDING THE
 CALCULATED LOADS SHOWN IN THE CALCULATION SUBMITTAL
 FROM K.O. ENERGY DESIGN. A) SYSTEM 1 CALCULATIONS
 INDICATE 12.82 TONS COOLING , SYSTEM 1 SCHEDULE
 INDICATES 21.5 TONS. B) SYSTEM 2 CALCS- 7.97 TONS,
 SCHEDULE- 12.5 TONS. C) SYSTEM 3 CALCS- 10.78,
 SCHEDULE- 19.5 TONS. TOTAL COOLING CALCULATION- 31.56
 TONS, TOTAL COOLING SHOWN ON SCHEDULE- 53.5 TONS.
 PLEASE NOTE THAT THE CALCS SHOW 0 BTUH FOR HEATING
 REQUIRED, HOWEVER HEATING IS REQUIRED PER SECTION 309.1
 FBC-14 MECHANICAL.
 2) SHEET M1 & M2: REFER TO TABLE 404.4 FBC-14
 MECHANICAL- THE OUTSIDE AIR CALCULATIONS MUST BE
 REVISED TO INCLUDE THE GALLERY AREAS AT 7.5 CFM PER
 PERSON AND THE THEATER AREA AT 10 CFM PER PERSON.
 FURTHER REVISION MAY BE REQUIRED PENDING OCCUPANCY
 CLASSIFICATION CHANGES.
 3) M1: THE FIRST FLOOR STUDIO BATHS INDICATES A SHOWER
 WHICH REQUIRES 50 CFM EXHAUST IN ADDITION TO THE 50 CFM
 FOR THE TOILET- TABLE 403.3.
 4) M1: INDICATE HOW THE RETURN AIR SYSTEM IS
 FUNCTIONING FOR AHU #7.
 5) M1: PROVIDE ADDITIONAL DETAILS TO CLARIFY HOW
 OUTSIDE AIR IS BEING SUPPLIED FOR AHU'S 3, 4, 5, 6, 7,
 14, AND 15. PROVIDE THE SIZES OF THE W.P. WALL JACKS,
 SHOW THE REQUIRED MOTORIZED DAMPERS FOR THE INTAKES,
 AND INDICATE THE AMOUNT OF O/A BEING SUPPLIED. REFER TO
 SECTION 401.4 AND 401.5 FOR AIR INTAKE COMPLIANCES-
 PLEASE NOTE THAT THE OPENINGS SHALL BE LOCATED A
 MINIMUM OF 10'
 HORIZONTALLY FROM ALLEYS UNLESS THEY ARE 25' ABOVE
 GRADE.
 6) M1: REFER TO SECTION 3006.2 FBC-14 BUILDING AND
 CLARIFY IF THE ELEVATOR ROOM CONTAINS SOLID STATE
 EQUIPMENT WHICH REQUIRES AN INDEPENDENT AC SYSTEM. SEE
 ALSO SECTION 3006.4 FOR FIRE BARRIER ENCLOSURE- NOTE:
 FIRE DAMPERS MAY BE REQUIRED FOR THE DUCTS PENETRATING
 THE ELEVATOR ROOM CEILING.
 7) M1: PROVIDE A DETAIL FOR FIRE DAMPERS IN THE
 STAIRWELL CEILINGS- SEE SECTION 717.6.2: A SHAFT
 ENCLOSURES OR CEILING RADIATION DAMPERS ARE REQUIRED.
 REFER TO SECTION 1022.5 & 1022.6 FBC-14 BUILDING:
 INDEPENDENT VENTILATION SYSTEMS FOR INTERIOR EXIT
 STAIRWAYS ARE REQUIRED- THE SUPPLY DUCTS PENETRATING
 INTO THE STAIRWELLS ARE NOT PERMITTED.
 8) M1 & M2: SHOW THE LOCATIONS OF THE REQUIRED DUCT
 SMOKE DETECTORS IN THE AHU RETURN AIR SYSTEMS- SECTION
 606.2.1.
 9) M2: INDICATE HOW THE RETURN AIR SYSTEM IS
 FUNCTIONING FOR AHU-13. NO ACCESS FOR RETURN AIR INTO
 THE MECHANICAL ROOM IS SHOWN ON THE PLAN.
 10) THE LOCATION OF THE HOOD EXHAUST TERNINATION IS
 REQUIRED TO BE 10' ABOVE GRADE AND 10' FROM THE
 PROPERTY LINE- SECTION 501.3.1 FBC-14 MECHANICAL: THE
 PLAN DOES NOT CLEARLY INDICATE COMPLIANCE. SUBMIT
 MANUFACTURER'S SPECS FOR THE GAS GRILL IN THE KITCHEN.
 PLEASE NOTE A GREASE HOOD AND FIRE SUPPRESSION MAY BE
 REQUIRED.
 11) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW PROVIDE
 AN AIR BALANCE CALCULATION ON THE PLAN.
 12) AS PREVIOUSLY NOTED IN THE 1ST REVIEW, DEMAND
 CONTROLLED VENTILATION IS REQUIRED FOR THE PROPOSED
 OCCUPANCY PER SECTION C403.2/.5.1 FBC-14 ENERGY
 CONSERVATION- SEE SECTION 202 DEFINITIONS AND PROVIDE A
 SYSTEM CAPABILITY ON THE PLANS. NOTE: TYPICALLY THIS IS
 ACCOMPLISHED THROUGH THE USE OF SENSORS AND PROGRAMMING
 OF THE SYSTEMS
 13) DEFERRED SUBMITTALS: FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL. SUBMITTALS SHALL
 INCLUDE THE FIRE DAMPERS, DUCT SMOKE DETECTORS, AIR
 INTAKE AND EXHAUST LOUVERS, WALL AND ROOF JACKS, DCV
 SENSORS, AND AC SYSTEMS.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING.
 A) PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved