Plan Review Notes
Plan Review Notes For Permit 15081109
Permit Number 15081109
Review Stop G
Sequence Number 1
Notes
Date Text
2015-11-12 09:34:511) SHT. P-3 - SUBMIT 2 COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR ALL GAS APPLIANCES/EQUIPMENT.
 APPLIANCES/EQUIPMENT SHALL BE LISTED AND LABELED PER
 2014 FBC-GAS CODE, SEC.301.3.
 2) THE GAS GENERATOR SHALL COMPLY WITH NFPA 37 AND
 COMPLY WITH UL 2200. 2010 FGC SEC.616.1. SUBMIT
 DOCUMENTATION THAT SHOWS COMPLIANCE.
 3) SHT. P-3 - THE GAS RISER INDICATES GALVANIZED PIPE
 UNDERGROUND. GALVANIZED PIPING IS NOT PERMITTED
 UNDERGROUND UNLESS FACTORY APPLIED COATINGS OR
 WRAPPINGS ARE INSTALLED ON THE PIPING. ZINC COATINGS
 ARE NOT DEEMED ADEQUATE PROTECTION FOR GAS PIPING
 UNDERGROUND. 2014 FBC-FUEL GAS SEC.404.11, 404.11.1,
 404.11.2.
 4) INDICATE ON THE PLANS THE NUMBER OF THE SPECIFIC GAS
 TABLE(S) THAT IS /ARE BEING USED IN THE SIZING OF THE
 GAS SYSTEM. 2014 FGC SEC.402.3, 402.4.
 5) INDICATE ON THE PLAN THE DISTANCE FROM THE METER TO
 THE MOST REMOTE OUTLET AND FROM EACH STEP DOWN
 REGULATOR TO THE MOST REMOTE OUTLET ON THAT PIPE
 SECTION. 2014 FGC SEC.402.4.1.
 6) SHOW THE BTU LOAD OF THE GENERATOR ON THE GAS
 DRAWING. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 7) SHOW THE LOCATION OF ALL STEP DOWN REGULATORS ON THE
 PLANS. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 8) SHOW THE PSI OF THE GAS DOWNSTREAM FROM THE METER
 AND FROM THE STEP DOWN REGULATORS.
 9) THE GAS RISER SHOWS AN EHD OF 13 ON SOME SECTIONS OF
 THE CSST ON THE GAS RISER. THIS IS EQUIVALENT TO 3/8"
 TUBING. IS THIS CORRECT? CLARIFY.
 10) PLEASE EXPLAIN HOW YOU ARRIVED AT THE AMOUNT OF
 REQUIRED COMBUSTION AIR. I AM NOT VERY FAMILIAR WITH
 THE EQUATION FROM SEC.304.9 OF THE FUEL GAS CODE.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  