| 2015-10-15 15:03:15 | 2ND REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15080942 |
| | 10/15/15 |
| | |
| | 1 ) 2ND REQUEST FOR AC LOAD CALCULATIONS. REFER TO |
| | COMMENT #1 FROM 1ST REVIEW: SECTION C403.2.1 FBC-14 |
| | ENERGY CONSERVATION: CALCULATION OF HEATING AND COOLING |
| | LOADS. |
| | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| | SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| | WITH THE ASHRAEHVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| | 2) 2ND REQUEST FOR CONDENSER TIE-DOWN ENGINEERING. |
| | PROVIDE STRUCTURAL DETAILS FOR THE INSTALLATION OF THE |
| | CONDENSER PAD, AND WIND LOAD-TIE DOWN ENGINEERING FOR |
| | MOUNTING THE CONDENSER TO THE PAD- SECTION 301.15 |
| | FBC-14 MECHANICAL. |
| | |