| Date |
Text |
| 2015-12-04 17:40:12 | CONTRACTOR SENT LETTER STATING THAT THE OWNER DOES NOT | | | WANT TO HAVE THE OPAQUE DOOR WHICH WAS RESUBMITTED | | | INSTALLED. OWNER CURRENTLY HAS A 90 MINUTE DOOR WITH | | | GLASS. THE DOOR INITIALLY PROPOSED HAS A DP LIMITATION | | | OF -53 BUT THE BUILDING HAS A DP REQUIREMENT OF +-65. | | | | | | SPOKE WITH ROBERT BROWN; ADVISED CONTRACTOR THAT A NON | | | IMPACT DOOR WOULD BE ACCEPTABLE (GLAZING LIMITED TO 100 | | | SI) | | | | | | PROPOSED PRODUCT SUBMITTED COMPLIES WITH CODE BUT | | | PULLED FROM REVIEW BY CONTRACTOR. | | | |
|