| 2015-09-04 09:36:23 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | REVISION TRACKING #15080680 |
| | MASTER #13060638 |
| | |
| | 1) THE SUBMITTED REVISION NARRATIVE FROM ROBERT IBARRA |
| | ARCHITECT DOES NOT LIST AND CLARIFY MANY OF THE |
| | MECHANICAL CHANGES THAT ARE SHOWN ON THE REVISED PLANS. |
| | PLEASE INCLUDE THE FOLLOWING PLAN REVISIONS IN THE |
| | NARRATIVE AND CLARIFY WHY THE CHANGES WERE MADE. |
| | SHEET M0.1- A) A NEW SUPPLY REGISTER HAS BEEN ADDED |
| | (AD-6) TO THE AIR DISTRIBUTION SCHEDULE. B) AHU-4 HAS A |
| | REVISION CLOUD AROUND IT IN THE SCHEDULE, BUT IT IS THE |
| | SAME UNIT THAT WAS SHOWN IN THE MASTER PLANS. C) THE |
| | F-2 HAS BEEN CHANGED TO A LARGER SIZE CAPACITY AND |
| | MODEL. |
| | M1.1 & M1.2: THE AD-2 SUPPLY DIFFUSERS HAVE BEEN |
| | CHANGED TO A DIFFERENT MODEL AND TYPE- THE AIR |
| | DISTRUBUTION SCHEDULE ON M0.1 DOES NOT SHOW THIS |
| | CHANGE. |
| | M1.2: THE PREP 2 ROOM HAS BEEN REDUCED IN WIDTH- |
| | CLARIFY WHY THE ROOM SIZE WAS CHANGED, WHAT EQUIPMENT |
| | WAS REMOVED OR RELOCATED, AND WHAT AIR DISTRIBUTION |
| | (DUCTWORK) ALTERATIONS HAVE BEEN MADE. |
| | M1.3: THE RESTROOMS HAVE ENLARGED IN SIZE AND AN |
| | ELECTRICAL ROOM HAS BEEN EITHER REMOVED OR BEEN |
| | RELOCATED- ALONG WITH OTHER FLOOR PLAN CHANGES. |
| | ADDITIONALLY THE RTU-1 HAS BEEN RELOCATED AND |
| | ALTERATIONS TO THE AIR DISTRIBUTION SYSTEM HAVE BEEN |
| | MADE. |
| | M1.4: A NEW EQUIPMENT PLATFORM FOR SUPPORT OF THE AC |
| | CONDENSERS IS SHOWN ON THE PLAN WITH A NOTE REFERENCING |
| | THE ARCHITECTURAL DRAWINGS. REVIEW OF THE |
| | ARCHITECTRURAL DRAWINGS INDICATES THAT FURTHER DETAILS |
| | ARE REQUIRED. PLEASE PROVIDE: A) SHOP DRAWINGS WITH |
| | REVIEW AND APPROVAL STAMPS BY THE ENGINEER OF RECORD. |
| | B) REVISED STRUCTURAL DRAWINGS INCLUDING DESIGN |
| | CRITERIA AND CALCULATIONS, ASSEMBLY AND ATTACHMENT |
| | DETAILS, TIE DOWN ENGINEERING FOR MOUNTING THE |
| | CONDENSERS TO THE PLATFORM, A PERMANENT MEANS OF ACCESS |
| | FOR SERVICE OF THE EQUIPMENT, AND DRAWINGS AND DETAILS |
| | FOR GUARDS (REFER TO SECTION 304.11 FBC-10 MECHANICAL). |
| | M1.5: INDICATE THE TYPE AND THICKNESS OF REFRIGERANT |
| | PIPING INSULATION AND HOW THE INSULATION AND PIPING |
| | WILL BE PROTECTED FROM WEATHERING AND UV DEGRADATION. |
| | 2) PLEASE NOTE THAT REVISIONS TO THE KITCHEN HOOD |
| | SYSTEMS, AND THE WALK-IN COOLER AND FREEZER BOXES ARE |
| | TO BE SUBMITTED UNDER A SEPARATE PERMIT AS REQUIRED BY |
| | THE CITY OF WPB BUILDING DEPARTMENT. REVIEWS ON THOSE |
| | PLAN REVISIONS ARE ON HOLD UNTIL THOSE APPLICATIONS AND |
| | PLAN REVISIONS HAVE BEEN RECEIVED. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |