| 2015-09-11 08:43:21 | 1ST REVIEW: FBC 2014 MECHANICAL, EXISTING BUILDING |
| | PERMIT #15080670 |
| | 9/11/15 |
| | |
| | 1) REFER TO SECTION 809 FBC EXISTING BUILDING AND |
| | PROVIDE MECHANICAL PLANS, DETAILS, AND SPECIFICATIONS |
| | INCLUDING: |
| | A) MINIMUM VENTILATION CALCULATIONS FOR THE RENOVATED |
| | UNITS IN COMPLIANCE WITH TABLE 403.3 FBC-14 MECHANICAL. |
| | B) AC EQUIPMENT SCHEDULES. |
| | C) AC COOLING AND HEATING CALCULATIONS- SEE SECTION |
| | 403.6.1 FBC-14 ENERGY CONSERVATION. |
| | D) ENERGY COMPLIANCE CALCULATIONS- SEE SECTION R101.4.3 |
| | & TABLE R101.5.1 FBC-14 ENERGY CONSERVATION. |
| | E) AHRI CERTIFICATES. |
| | F) AC DUCT LAYOUT PLANS FOR EACH UNIT INDICATING THE |
| | TYPE AND SIZE OF DUCTS, SUPPLY CFM'S AT EACH DIFFUSER, |
| | MEANS OF RETURN AIR INCLUDING DIMENSIONS OF RETURN AIR |
| | GRILLS. |
| | G) AIR DISTRIBUTION SCHEDULE INDICATING THE TYPES AND |
| | SIZES OF DIFFUSERS AND GRILLS. |
| | H) CONDENSATE DISPOSAL PLANS- PRIMARY AND SECONDARY FOR |
| | EACH NEW AIR HANDLER- SEE SECTION 307 FBC-14 |
| | MECHANICAL. |
| | I) WIND LOAD TIE DOWN ENGINEERING FOR MOUNTING THE AC |
| | CONDENSERS TO THE NEW PADS- SEE SECTION 301.15 FBC-14 |
| | MECHANICAL. |
| | 2) INDICATE ON THE PLANS HOW OUTSIDE AIR WILL BE |
| | PROVIDED TO EACH OF THE NEW AIR HANDLERS.- SEE SECTION |
| | R403.5.2 FBC ENERGY CONSERVATION. |
| | 3) REFER TO SECTION 602 FBC-14 MECHANICAL AND SHOW |
| | COMPLIANCE FOR MATERIALS USED INSIDE THE AIR HANDLER |
| | CLOSETS INCLUDING THE TYPES OF CLOSET DOORS TO BE |
| | INSTALLED. |
| | 4) REFER TO SECTION 603.1.1 AND PROVIDE A DIMENSIONED |
| | SECTION VIEW TO VERIFY ADEQUATE SPACE WILL BE PROVIDED |
| | IN THE AIR HANDLER CLOSETS. |
| | 5) PROVIDE BATHROOM EXHAUST DETAILS: EXHAUST FAN |
| | EQUIPMENT SCHEDULES, EXHAUST DUCT RUNS AND TERMINATION |
| | LOCATIONS. |
| | 6) PROVIDE DRYER EXHAUST AND MAKEUP AIR PLANS PER |
| | SECTION 504: SHOW THE TYPE AND SIZE OF EXHAUST DUCT, |
| | EXHAUST DUCT RUN AND TERMINATION LOCATION, AND INDICATE |
| | HOW MAKEUP AIR WILL BE SUPPLIED TO EACH DRYER. |
| | 7) REFER TO SECTION 505 FBC-14 MECHANICAL AND PROVIDE |
| | KITCHEN EXHAUST VENTILATION PLANS. |
| | 8) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE AC |
| | SYSTEMS AND THE DRYERS. |
| | PLEASE NOTE ADDITIONAL COMMENTS MAY FOLLOW SUBMITTAL OF |
| | REVISED PLANS AND RESPONSES TO ALL BUILDING DEPARTMENT |
| | COMMENTS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |