| 2016-04-05 17:47:42 | ELECTRICAL REVIEW COMMENTS |
| | REVIEWED FOR COMPLIANCE WITH: |
| | 5TH EDITION OF THE FBC 2014 & NFPA 70 (NEC) 2011 |
| | EDITION |
| | |
| | CORRECTIONS REQUIRED: |
| | 1. THE RISER DIAGRAM SHOWS THE SERVICE AS 277/480 3 |
| | PHASE GOING INTO A STEP DOWN TRANSFORMER TO 120/208 BUT |
| | THE SERVICE REQUIREMENT AS PER THE PANEL SCHEDULE IS |
| | 120/240 3 PHASE GOING INTO A 3 PHASE DISC. OF WHICH TWO |
| | PHASES ARE BEING USED. |
| | 2. THE PANEL SCHEDULE ON THE PRIMARY PERMIT HAS A |
| | DEMAND LOAD OF 54.8 AMP AND THE PANEL SCHEDULE ON THE |
| | NEW PLANS HAVE A CONNECTED DEMAND LOAD OF 73.6 AMP. |
| | SUBMIT SPECS |
| | 3. THE RISER DOES NOT INDICATE THE CONDUCTOR INSULATION |
| | RATING THEREFORE ASSUMING IT IS 60 DEGREE, THE MAXIMUM |
| | DISTANCE BETWEEN THE MAIN DISC AND THE TRAILERS DISC IS |
| | ONLY 136'. |
| | 4. PHYSICAL PROTECTION AS REQUIRED IN NEC 110.27(B) |
| | SHALL BE PROVIDED AND INDICATED ON PLANS. |
| | |
| | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| | GREATLY APPRECIATED. |
| | |
| | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| | CONTACT ME DIRECTLY. |
| | |
| | THANK YOU, |
| | MIKE ALBARRAN |
| | ELECTRICAL PLANS EXAMINER |
| | PH: 561-805-6746 |
| | EMAIL: [email protected] |
| | |