| 2015-10-19 09:07:28 | 3RD REVIEW: FBC 2014 5TH ED. |
| | |
| | A PLAN AND PARTIALLY COMPLETED ENERGY FORM HAS BEEN |
| | SUPPLIED. THE IS NOT ACCEPTABLE AS THE DUCT MATERIAL |
| | AND DIMENSIONS OF VARIOUS PORTIONS OF THE DUCT SYSTEM |
| | ARE NOT IDENTIFIED. THE ENERGY SUBMITTAL IS NOT FILLED |
| | OUT, THERE IS NO EQUIPMENT SIZING CALCULATION PROVIDED. |
| | |
| | FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN |
| | UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE |
| | OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE |
| | AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT |
| | IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND |
| | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS |
| | DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND |
| | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM |
| | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, |
| | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE |
| | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, |
| | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE |
| | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS |
| | EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC |
| | INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS |
| | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE |
| | OF THE PERSON RESPONSIBLE FOR THE DESIGN |
| | |
| | FBC-ER403.6.1 PROVIDE A SIZING CALCULATION. |
| | |
| | STEVEN KENNEDY, CBO |
| | CHIEF PLANS EXAMINER |
| | (561) 805-6710 |
| | [email protected] |
| | |