| Plan Review Notes For Permit 15080178 |
| Permit Number |
15080178 |
|
| Review Stop |
M |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2015-11-12 08:39:55 | 3RD REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15080178 | | | 11/12/15 | | | | | | 1) THE RE-SUBMITTED ENERGY CALCULATION FORM 506-2014 | | | MUST BE SIGNED BY THE " BUILDING'S OWNER, THE | | | ARCHITECT, OR OTHER AUTHORIZED AGENT LEGALLY DESIGNATED | | | BY THE BUILDING'S OWNER".- SEE PAGE 3 OF THE DOCUMENT | | | AND SECTION C103.1.1.2 FBC-14 ENERGY CONSERVATION. | | | 2) FORM 506-2014: SEE PAGE 1 "CHECKLIST" ITEM #4 ON THE | | | LIST AND COMPLETE THE "MANDATORY REQUIREMENTS" | | | CHECKLIST BEGINNING ON PAGE 8. | | | 3) REFER TO 3RD REVIEW BUILDING COMMENT #7 REGARDING | | | DESIGN PROFESSIONAL APPROVAL FOR PRODUCT APPROVALS AND | | | NOA'S ( INCLUDING THE RTU CURB AND THE ROOF STAND). | | | 4) PLEASE PLACE A NOTE INDICATING ALL REFRIGERATION | | | SYSTEMS INCLUDING THE WALK IN COOLER AND FREEZER, AND | | | THE FLEX PACKWILL BE DONE UNDER SEPARATE PERMIT. PLEASE | | | CLARIFY IF THE MOUNTING DETAILS FOR THE RTU'S SHOWN ON | | | SHEET M1.1, AND THE THYBAR CURB ARE ALSO ALSO | | | APPLICABLE TO THE ROOF VENTILATOR AND THE FLEX PACK | | | INSTALLATION. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|