| Date |
Text |
| 2015-08-13 16:46:08 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15080178 |
| | 8/13/15 |
| | |
| | 1) REFERENCE SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION AND PROVIDE COMPLIANCE SUBMITTALS- |
| | CALCULATION OF HEATING AND COOLING LOADS: |
| | DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| | PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| | ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| | COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| | WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| | MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| | SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| | APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| | COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| | REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| | SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| | WITH THE ASHRAE HVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| | ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| | APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| | DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| | 2) PLEASE NOTE THAT THE CITY OF WEST PALM BEACH |
| | CONSTRUCTION SERVICES DIVISION REQUIRES SEPARATE |
| | PERMITS FOR REFRIGERATION SYSTEMS, AND KTICHEN HOOD AND |
| | EXHAUST SYSTEMS. |
| | 3) PROVIDE DUCT SEALING AND ATTACHMENT DETAILS IN |
| | COMPLIANCE WITH TABLE C403.2.7.2 FBC-14 ENERGY |
| | CONSERVATION, AND DUCT SUPPORT DETAILS IN COMPLIANCE |
| | WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS- 2005. |
| | 4) SHEET M1.1: REFERENCE SECTION 301.15 FBC-14 |
| | MECHANICAL AND PROVIDE THE DESIGN WIND PRESSURES FOR |
| | THE ROOF TOP EQUIPMENT INSTALLATIONS. THE DETAILS SHOWN |
| | ON THE PLAN ARE FOR THE RTU AND FLEXPACK INSTALLATIONS- |
| | PLEASE ALSO PROVIDE DETAILS FOR THE FLEXPACK GRAVITY |
| | VENTILATOR. |
| | 5) M1.1: SUBMIT TWO COPIES OF A CURRENT FLORIDA PRODUCT |
| | APPROVAL OR MIAMI-DADE NOA FOR THE CONDENSER ROOF STAND |
| | REVIEWED AND APPROVED BY THE ENGINEER OF RECORD. THE |
| | ENGINEER SHALL CIRCLE, HIGHLIGHT, OR OTHERWISE MARK ALL |
| | DETAILS, NOTES, ANCHOR AND FASTENER SCHEDULES |
| | APPLICABLE TO THE PROPOSED INSTALLATION. |
| | 6) PROVIDE A CONDENSATE DISPOSAL PLAN FOR THE RTU'S AND |
| | FLEXPACK UNIT: SHOW THE TYPE AND SIZE OF CONDENSATE |
| | PIPES, PIPE RUNS, PIPE SUPPORTS, PIPE PROTECTION, AND |
| | CONDENSATE DISCHARGE LOCATION. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |