| Plan Review Notes For Permit 15080078 |
| Permit Number |
15080078 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2015-09-26 07:40:30 | 1) I AM CHALLENGING THE VALUE OF THE PROJECT. THE COST | | | OF THE WASHERS AND DRYERS SHALL BE INCLUDED IN THE | | | VALUATION ALONG WITH ALL OTHER NEW EQUIPMENT AND LABOR. | | | WPB AMEND. TO FBC SEC. 109.3.SUBMIT A DETAILED, | | | QUANTITY ESTIMATE AND/OR BONA FIDE SIGNED CONTRACT FOR | | | THE TOTAL COSTOF THIS PROJECT FOR REVIEW. 2ND REQUEST. | | | 2) CLEARLY IDENTIFY AND SHOW THE LOCATION OF ALL | | | STEP-DOWN GAS REGULATORS FOR THE GAS SYSTEM. SINCE THIS | | | IS BEING DESIGNED AS A 2 PSI GAS SYSTEM THE GAS PIPING | | | SHALL EITHER HAVE STEP-DOWN REGULATORS LOCATED AT EACH | | | APPLIANCE OR THE REGULATORS SHALL BE LOCATED TO MEET | | | THE GAS CODE FOR PIPE SIZING. THE ONE REGULATOR | | | DOWNSTREAM OF THE GAS METER IS NOT SUFFICIENT.THE | | | SYMBOLS ON EACH GAS SUPPLY UPSTREAM OF THE GAS COCK ARE | | | NOT IDENTIFIED SO IT IS DIFFICULT TO ESTABLISH | | | COMPLIANCE WITH THE GAS CODE.2ND REQUEST. | | | 3) THE WALL AROUND THE DRYERS IN THE SOUTH AREA IS NOT | | | AN EXISTING WALL. I SAW IT MYSELF AND IT WAS | | | CONSTRUCTED OF NEW METAL STUDS AND DRYWALL. THIS SHALL | | | BE INCLUDED IN THE SCOPE OF WORK AND VALUE FOR THIS | | | PROJECT. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|