| 2015-08-06 10:02:13 | 1) SHT. A-1 - THE APPLICABLE CODES FOR THIS PROJECT ARE |
| | THE 5TH EDITION OF THE FLORIDA BUILDING CODE (2014). |
| | REVISE THE NOTE ON THE PLAN. |
| | 2) SUBMIT THE MANUFACTURER'S SPECIFICATION SHEETS FOR |
| | THE GAS DRYERS AND A COPY OF THE INSTALLATION |
| | MANUAL.THE DRYERS SHALL BE LISTED AND LABELED PER THE |
| | FBC 5TH ED.FUEL GAS CODE SEC. 301.3. |
| | 3) THE PLANS SHALL BE SIGNED AND SEALED BY THE SESIGN |
| | PROFESSIONAL OF RECORD PER THE FL. ADMIN. CODE |
| | 61G15-23.002. |
| | 4) INDICATE THE LEVEL OF ALTERATION OF THIS PROJECT ON |
| | THE PLANS IN ACCORDANCE WITH THE 2014 FBC EXISTING |
| | BUILDING CODE SEC. 301.1, 501.5. |
| | 5) INDICATE THE DISTANCE ABOVE THE ROOF OF THE DRYER |
| | EXHAUST. THE EXHAUST SHALL COMPLY WITH 2014 FBC-FUEL |
| | GAS SEC.503.7.3. THE DRYER VENTS APPEAR TO BE SINGLE |
| | WALL VENTS. |
| | 6) THE PENETRATION OF THE PIPE PASSING THROUGH THE ROOF |
| | SHALL COMPLY WITH THE 2014 FBC FUEL GAS SEC.503.7.5. IF |
| | THE EXISTING INSTALLATION IN NOT COMPLIANT IT SHALL BE |
| | CORRECTED. IF THE ROOF IS CONSTRUCTED OF COMBUSTIBLE |
| | MATERIAL A NON- COMBUSTIBLE, NON-VENTILATING THIMBLE |
| | SHALL BE USED. |
| | 7) CLEARANCES OF SINGLE WALL METAL PIPE TO COMBUSTIBLE |
| | MATERIAL SHALL COMPLY WITH 2014 FBC-FUEL GAS |
| | SEC.503.7.8 & TABLE 503.10.5. |
| | 8) WHERE TWO OR MORE APPLIANCES ARE CONNECTED TO A |
| | COMMON VENT, THE VENT SHALL BE SIZED IN ACCORDANCE WITH |
| | THE FGC SEC. 504. |
| | 9) SEDIMENT TRAPS ARE REQD. ON THE GAS PIPING |
| | CONNECTIONS TO THE DRYERS PER THE 2014 FGC SEC.408.4. |
| | 10) SHT. M-1 - IDENTIFY THE PIECE OF EQUIPMENT AND ITS |
| | FUNCTION THAT IS LABELED HCN080KYFX. SUBMIT MANUF. |
| | SPECIFICATIONS/INSTALL MANUAL. WPB AMEND. TO FBC SEC. |
| | 107.2.1. |
| | 11) WASHING MACHINES AND CLOTHES DRYERS SHALL COMPLY |
| | WITH THE 2014 FBC-ACCESSIBILITY SECS.309 & 611. SUBMIT |
| | AN ELEVATION DETAIL SHOWING COMPLIANCE. |
| | 12) THE ARCHITECTURAL AND PLUMBING PLANS SHOW 12 |
| | WASHING MACHINES BUT THERE ARE 14 DRAIN OUTLETS SHOWN |
| | ON THE PLUMBING RISER.CLARIFY. |
| | 13) SHT. P-2 - THE PLAN REFERS TO THE 2009 |
| | INTERNATIONAL FUEL GAS CODE. THE CODE IN EFFECT IS THE |
| | 5TH EDITION (2014) OF THE FBC. REVISE THE NOTE. |
| | 14) THE GAS TABLE REFERENCED ON SHT. P-2 IS INCORRECT. |
| | REVISE THE NOTE TO READ THE CORRECT TABLE IN THE 2014 |
| | FUEL GAS CODE. |
| | 15) THE GAS SYSTEM IS UNDERSIZED FOR A SYSTEM THAT IS 2 |
| | PSI WITH A 1.0 PSI DROP. THE GAS MAIN SHALL BE 1 1/2 |
| | INCHES FROM THE OUTLET OF THE GAS METER UP TO THE |
| | BOILER BRANCH AND CAN REDUCE DOWN TO 1 1/4 INCHES AFTER |
| | PICKING UP THE BOILER. |
| | 16) SHOW THE LOCATION OF ALL STEP-DOWN REGULATORS FOR |
| | THE EQUIPMENT ON THE GAS RISER. |
| | 17) THE COMBUSTION AIR CALCULATIONS ON SHT. M-1 |
| | INDICATE THREE EXISTING COMBUSTION AIR DUCTS SIZED 28 X |
| | 38, 40 X 40 & 28 X 28 BUT THE PLANS ONLY SHOW ONE DUCT |
| | SIZED 72 X 30. IS THE 72 X 30 MAKE UP AIR FOR THE |
| | VENTILATION SYSTEM OR IS IT FOR COMBUSTION AIR FOR THE |
| | DRYERS. CLARIFY. |
| | 18) THE COMBUSTION AIR CALCULATION YOU ARE USING TO |
| | DETERMINE THE REQUIRED AMOUNT OF COMBUSTION AIR FOR THE |
| | DRYER AREA NORTH IS BASED ON THE USE OF HORIZONTAL |
| | DUCTS ONLY TO THE OUTDOORS. THE ONLY DUCT SHOWN IS |
| | PARTIALLY HORIZONTAL AND PARTIALLY VERTICAL. HOW DID |
| | YOU ARRIVE AT THE USE OF THIS CALCULATION? SHOW THE |
| | LOCATION OF THE EXISTING COMBUSTION AIR DUCTS AND |
| | CLEARLY SHOW HOW COMBUSTION AIR IS BEING INTRODUCED |
| | INTO THE STRUCTURE . WPB AMEND. TO FBC SEC. 107.2.1. |
| | 19) SHT. M-1 - SUBMIT MANUF. SPECS FOR THE FLUE FOR THE |
| | BOILER. WPB AMEND. TO FBC SEC. 107.3.5.1.5. |
| | 20) SHT. M-1 - THE NOTE AT THE INTAKE AIR HOOD REFERS |
| | TO RECT.INTAKE HOOD DETAIL. THERE IS NO SUCH DETAIL ON |
| | THE PLANS. CLARIFY. |
| | 21) SHT. M-1 - IDENTIFY THE DASHED LINE BOXES ON THE |
| | PLANS. ARE THESE THE MAKE UP AIR DUCTS? IF SO, INDICATE |
| | WHAT THEY ARE & THE DIMENSIONS OF EACH. |
| | 22) SHT. P-2 - SUBMIT A LEGEND FOR THE KEYNOTES #7, #8, |
| | #9 & #10 ON THE GAS DRAWING. WPB AMEND. TO FBC SEC. |
| | 107.3.5.1.5. |
| | 23) THERE WAS AN EXISTING STOREFRONT DOOR ON THE SOUTH |
| | SIDE OF THIS UNIT THAT WAS REMOVED WITHOUT A PERMIT AND |
| | A STOREFRONT GLASS PANEL WAS INSTALLED IN ITS PLACE |
| | ALSO WITHOUT A PERMIT. THIS WORK SHALL BE INCLUDED IN |
| | THIS PERMIT. SUBMIT ALL REQUIRED INFORMATION AND |
| | DOCUMENTS FOR THIS WORK. |
| | 24) AN NEW INTERIOR WALL WAS CONSTRUCTED AROUND THE |
| | DRYERS IN THE SOUTH AREA. SUBMIT COMPLETE PLANS FOR THE |
| | INTERIOR PARTITION. |
| | 25) I AM CHALLENGING THE VALUE OF THE PROJECT. THE COST |
| | OF THE WASHERS AND DRYERS SHALL BE INCLUDED IN THE |
| | VALUATION AND ALL OTHER NEW EQUIPMENT AND LABOR. WPB |
| | AMEND. TO FBC SEC. 109.3. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |
| | |
| | |