Plan Review Notes
Plan Review Notes For Permit 15080078
Permit Number 15080078
Review Stop P
Sequence Number 1
Notes
Date Text
2015-08-06 10:02:131) SHT. A-1 - THE APPLICABLE CODES FOR THIS PROJECT ARE
 THE 5TH EDITION OF THE FLORIDA BUILDING CODE (2014).
 REVISE THE NOTE ON THE PLAN.
 2) SUBMIT THE MANUFACTURER'S SPECIFICATION SHEETS FOR
 THE GAS DRYERS AND A COPY OF THE INSTALLATION
 MANUAL.THE DRYERS SHALL BE LISTED AND LABELED PER THE
 FBC 5TH ED.FUEL GAS CODE SEC. 301.3.
 3) THE PLANS SHALL BE SIGNED AND SEALED BY THE SESIGN
 PROFESSIONAL OF RECORD PER THE FL. ADMIN. CODE
 61G15-23.002.
 4) INDICATE THE LEVEL OF ALTERATION OF THIS PROJECT ON
 THE PLANS IN ACCORDANCE WITH THE 2014 FBC EXISTING
 BUILDING CODE SEC. 301.1, 501.5.
 5) INDICATE THE DISTANCE ABOVE THE ROOF OF THE DRYER
 EXHAUST. THE EXHAUST SHALL COMPLY WITH 2014 FBC-FUEL
 GAS SEC.503.7.3. THE DRYER VENTS APPEAR TO BE SINGLE
 WALL VENTS.
 6) THE PENETRATION OF THE PIPE PASSING THROUGH THE ROOF
 SHALL COMPLY WITH THE 2014 FBC FUEL GAS SEC.503.7.5. IF
 THE EXISTING INSTALLATION IN NOT COMPLIANT IT SHALL BE
 CORRECTED. IF THE ROOF IS CONSTRUCTED OF COMBUSTIBLE
 MATERIAL A NON- COMBUSTIBLE, NON-VENTILATING THIMBLE
 SHALL BE USED.
 7) CLEARANCES OF SINGLE WALL METAL PIPE TO COMBUSTIBLE
 MATERIAL SHALL COMPLY WITH 2014 FBC-FUEL GAS
 SEC.503.7.8 & TABLE 503.10.5.
 8) WHERE TWO OR MORE APPLIANCES ARE CONNECTED TO A
 COMMON VENT, THE VENT SHALL BE SIZED IN ACCORDANCE WITH
 THE FGC SEC. 504.
 9) SEDIMENT TRAPS ARE REQD. ON THE GAS PIPING
 CONNECTIONS TO THE DRYERS PER THE 2014 FGC SEC.408.4.
 10) SHT. M-1 - IDENTIFY THE PIECE OF EQUIPMENT AND ITS
 FUNCTION THAT IS LABELED HCN080KYFX. SUBMIT MANUF.
 SPECIFICATIONS/INSTALL MANUAL. WPB AMEND. TO FBC SEC.
 107.2.1.
 11) WASHING MACHINES AND CLOTHES DRYERS SHALL COMPLY
 WITH THE 2014 FBC-ACCESSIBILITY SECS.309 & 611. SUBMIT
 AN ELEVATION DETAIL SHOWING COMPLIANCE.
 12) THE ARCHITECTURAL AND PLUMBING PLANS SHOW 12
 WASHING MACHINES BUT THERE ARE 14 DRAIN OUTLETS SHOWN
 ON THE PLUMBING RISER.CLARIFY.
 13) SHT. P-2 - THE PLAN REFERS TO THE 2009
 INTERNATIONAL FUEL GAS CODE. THE CODE IN EFFECT IS THE
 5TH EDITION (2014) OF THE FBC. REVISE THE NOTE.
 14) THE GAS TABLE REFERENCED ON SHT. P-2 IS INCORRECT.
 REVISE THE NOTE TO READ THE CORRECT TABLE IN THE 2014
 FUEL GAS CODE.
 15) THE GAS SYSTEM IS UNDERSIZED FOR A SYSTEM THAT IS 2
 PSI WITH A 1.0 PSI DROP. THE GAS MAIN SHALL BE 1 1/2
 INCHES FROM THE OUTLET OF THE GAS METER UP TO THE
 BOILER BRANCH AND CAN REDUCE DOWN TO 1 1/4 INCHES AFTER
 PICKING UP THE BOILER.
 16) SHOW THE LOCATION OF ALL STEP-DOWN REGULATORS FOR
 THE EQUIPMENT ON THE GAS RISER.
 17) THE COMBUSTION AIR CALCULATIONS ON SHT. M-1
 INDICATE THREE EXISTING COMBUSTION AIR DUCTS SIZED 28 X
 38, 40 X 40 & 28 X 28 BUT THE PLANS ONLY SHOW ONE DUCT
 SIZED 72 X 30. IS THE 72 X 30 MAKE UP AIR FOR THE
 VENTILATION SYSTEM OR IS IT FOR COMBUSTION AIR FOR THE
 DRYERS. CLARIFY.
 18) THE COMBUSTION AIR CALCULATION YOU ARE USING TO
 DETERMINE THE REQUIRED AMOUNT OF COMBUSTION AIR FOR THE
 DRYER AREA NORTH IS BASED ON THE USE OF HORIZONTAL
 DUCTS ONLY TO THE OUTDOORS. THE ONLY DUCT SHOWN IS
 PARTIALLY HORIZONTAL AND PARTIALLY VERTICAL. HOW DID
 YOU ARRIVE AT THE USE OF THIS CALCULATION? SHOW THE
 LOCATION OF THE EXISTING COMBUSTION AIR DUCTS AND
 CLEARLY SHOW HOW COMBUSTION AIR IS BEING INTRODUCED
 INTO THE STRUCTURE . WPB AMEND. TO FBC SEC. 107.2.1.
 19) SHT. M-1 - SUBMIT MANUF. SPECS FOR THE FLUE FOR THE
 BOILER. WPB AMEND. TO FBC SEC. 107.3.5.1.5.
 20) SHT. M-1 - THE NOTE AT THE INTAKE AIR HOOD REFERS
 TO RECT.INTAKE HOOD DETAIL. THERE IS NO SUCH DETAIL ON
 THE PLANS. CLARIFY.
 21) SHT. M-1 - IDENTIFY THE DASHED LINE BOXES ON THE
 PLANS. ARE THESE THE MAKE UP AIR DUCTS? IF SO, INDICATE
 WHAT THEY ARE & THE DIMENSIONS OF EACH.
 22) SHT. P-2 - SUBMIT A LEGEND FOR THE KEYNOTES #7, #8,
 #9 & #10 ON THE GAS DRAWING. WPB AMEND. TO FBC SEC.
 107.3.5.1.5.
 23) THERE WAS AN EXISTING STOREFRONT DOOR ON THE SOUTH
 SIDE OF THIS UNIT THAT WAS REMOVED WITHOUT A PERMIT AND
 A STOREFRONT GLASS PANEL WAS INSTALLED IN ITS PLACE
 ALSO WITHOUT A PERMIT. THIS WORK SHALL BE INCLUDED IN
 THIS PERMIT. SUBMIT ALL REQUIRED INFORMATION AND
 DOCUMENTS FOR THIS WORK.
 24) AN NEW INTERIOR WALL WAS CONSTRUCTED AROUND THE
 DRYERS IN THE SOUTH AREA. SUBMIT COMPLETE PLANS FOR THE
 INTERIOR PARTITION.
 25) I AM CHALLENGING THE VALUE OF THE PROJECT. THE COST
 OF THE WASHERS AND DRYERS SHALL BE INCLUDED IN THE
 VALUATION AND ALL OTHER NEW EQUIPMENT AND LABOR. WPB
 AMEND. TO FBC SEC. 109.3.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  
  