| 2015-08-19 15:46:45 | FAILED |
| | |
| | PLEASE PROVIDE WRITTEN RESPONSES: |
| | |
| | 1. THE STEEL SUPERSTRUCTURE IS VERTICAL CONSTRUCTION, |
| | SO IT TRIGGERS CONDITION NO. 1 OF RESOLUTION NO. 206-15 |
| | LISTED BELOW: |
| | |
| | 1) PRIOR TO THE APPROVAL OF A BUILDING PERMIT FOR |
| | VERTICAL CONSTRUCTION OF THE RESTORATION HARDWARE |
| | GALLERY, THE APPLICANT SHALL: |
| | |
| | A. PROVIDE AT LEAST ONE SHOWER AND CHANGING FACILITY |
| | WITHIN THE BUILDING MEETING BOTH BUILDING CODE AND |
| | PLANNING DIVISION REQUIREMENTS. |
| | B. SHOW MERCHANDISE WINDOW DISPLAYS IN AS MANY OF THE |
| | GROUND LEVEL GLAZED OPENINGS AS POSSIBLE. |
| | |
| | 2. THE PLANS PROVIDED (FOR REFERENCE ONLY) DO NOT |
| | INCLUDE INFORMATION ON THE SHOWER AND CHANGING |
| | FACILITIES. THE CURRENT LAYOUT WITH NO SPECIFIC |
| | INFORMATION WAS NOT APPROVED AS MEETING THE REQUIREMENT |
| | BY THE PLANNING DIVISION DURING THE SITE PLAN APPROVAL |
| | PROCESS. |
| | |
| | 3. THERE IS NO GLAZING SPECIFIC INFORMATION PROVIDED ON |
| | THE GLAZING OF THE WINDOWS ON THE GROUND LEVEL FOR |
| | STAFF TO VERIFY THE INTENT OF 1)B. |
| | |
| | 4. THE BUILDING CONTAINS MORE SQUARE FOOTAGE THAN WAS |
| | APPROVED BY RESOLUTION NO. 206-15. A MINOR PLANNED |
| | DEVELOPMENT AMENDMENT TO REFLECT THE NEW SQUARE FOOTAGE |
| | IS REQUIRED PRIOR TO THE APPROVAL OF THE VERTICAL |
| | CONSTRUCTION. THE MINOR PLANNED DEVELOPMENT AMENDMENT |
| | SHALL SHOW WHERE THE BUILDING HAS GOTTEN LARGER AND THE |
| | IMPACT ON THE SITE LAYOUT, TO INCLUDE THE SETBACKS, THE |
| | LANDSCAPE, THE PARKING, ETC. |
| | |
| | 5. THE ARCHITECTURE IS DIFFERENT THAN THE ONE APPROVED |
| | BY RESOLUTION NO. 206-15. A MINOR PLANNED DEVELOPMENT |
| | AMENDMENT TO REFLECT THE NEW ELEVATIONS IS REQUIRED. |
| | |
| | 6. IN LIGHT OF THE TIMING TO ADDRESS THE COMMENTS |
| | ABOVE, IT MAY BE ADVANTAGEOUS TO REVISE THE SCOPE OF |
| | THIS PERMIT TO BE JUST FOR THE FOUNDATION TO GIVE |
| | YOURSELVES MORE TIME TO ADDRESS THE COMMENTS RELATED TO |
| | THE VERTICAL CONSTRUCTION. |
| | |
| | 7. SEPARATE PERMITS WITH PLANS ARE REQUIRED FOR THE |
| | FOLLOWING: |
| | |
| | A. AWNINGS |
| | B. PARKING LOT STRIPING |
| | C. LANDSCAPE |
| | D. FOUNTAINS |
| | E. SITE LIGHTING |
| | F. HARDSCAPE |
| | G. BICYCLE RACKS |
| | H. WALLS AND GATES |
| | |
| | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
| | |
| 2015-08-17 11:17:02 | 8/17/15 |