2015-07-29 17:04:561ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15071089
 7/29/15
  
 1) SHEETS M1.0 , M1.1, M1.2, & M1.3: PROVIDE PRIMARY
 AND AUXILIARY CONDENSATE DISPOSAL PLANS FOR THE NEW AIR
 HANDLERS. REVISE THE DRAWINGS ACCORDINGLY.
 2) M1.0, M1.1, M1.2, & M1.3: DUCT SMOKE DETECTORS ARE
 REQUIRED IN THE AHU RETURN DUCTS- SECTION 606.2.1
 FBC-10 MECHANICAL. REVISE THE DRAWINGS ACCORDINGLY.
 3) M1.0, M1.1, M1.2, & M1.3: CORRECT THE AHU NUMBERS IN
 KEYNOTE #2 SO THEY MATCH WITH THE AHU NUMBERS SHOWN IN
 THE DIAGRAMS.
 4) M2.1: THE TOTAL O/A SHOWN IN THE SCHEDULES FOR EACH
 PAIRING OF AHU'S IS EXCEEDING THE AMOUNT OF O/A BEING
 SUPPLIED BY THE DEDICATED OAU FOR THOSE TWO SYSTEMS:
 PLEASE CLARIFY.
 5) PLEASE REVIEW AND SHOW COMPLIANCE WITH SECTION C408
 SYSTEM COMMISSIONING , FBC-14 ENERGY CONSERVATION:
  
 C408.1 GENERAL.
 THIS SECTION COVERS THE COMMISSIONING OF THE BUILDING
 MECHANICAL SYSTEMS IN SECTION C403 AND ELECTRICAL POWER
 AND LIGHTING SYSTEMS IN SECTION C405.
  
 C408.2 MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION
 REQUIREMENTS.
 PRIOR TO PASSING THE FINAL MECHANICAL INSPECTION, THE
 REGISTERED DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE
 OF MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION IN
 ACCORDANCE THE PROVISIONS OF THIS SECTION.
  
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER AND MADE AVAILABLE TO THE CODE
 OFFICIAL UPON REQUEST IN ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 EXCEPTION: THE FOLLOWING SYSTEMS ARE EXEMPT FROM THE
 COMMISSIONING REQUIREMENTS:
  
 1. MECHANICAL SYSTEMS IN BUILDINGS WHERE THE TOTAL
 MECHANICAL EQUIPMENT CAPACITY IS LESS THAN 480,000
 BTU/H (140 690 W) COOLING CAPACITY AND 600,000 BTU/H
 (175 860 W) HEATING CAPACITY.
  
 2. SYSTEMS INCLUDED IN SECTION C403.3 THAT SERVE
 DWELLING UNITS AND SLEEPING UNITS IN HOTELS, MOTELS,
 BOARDING HOUSES OR SIMILAR UNITS.
  
 C408.2.1 COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A REGISTERED
 DESIGN PROFESSIONAL OR APPROVED AGENCY AND SHALL
 INCLUDE THE FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
  
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
  
 3. FUNCTIONS TO BE TESTED, INCLUDING, BUT NOT LIMITED
 TO CALIBRATIONS AND ECONOMIZER CONTROLS.
  
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 AT A MINIMUM, TESTING SHALL AFFIRM WINTER AND SUMMER
 DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
  
 5. MEASURABLE CRITERIA FOR PERFORMANCE.
  
 C408.2.2 AIR DISTRIBUTION SYSTEM TESTING, ADJUSTING AND
 BALANCING.
 CONSTRUCTION DOCUMENTS SHALL REQUIRE THAT A WRITTEN
 BALANCE REPORT BE PROVIDED TO THE OWNER OR THE
 DESIGNATED REPRESENTATIVE OF THE BUILDING OWNER FOR
 HVAC SYSTEMS SERVING ZONES WITH A TOTAL CONDITIONED
 AREA EXCEEDING 5000 SQUARE FEET (465 M2). AIR
 DISTRIBUTION SYSTEMS SHALL BE TESTED, ADJUSTED, AND
 BALANCED BY A LICENSED ENGINEER OR A COMPANY OR
 INDIVIDUAL HOLDING A CURRENT CERTIFICATION FROM A
 RECOGNIZED TESTING AND BALANCING AGENCY ORGANIZATION IN
 ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING
 STANDARDS.
  
 EXCEPTIONS:
  
 1. BUILDINGS WITH COOLING OR HEATING SYSTEM CAPACITIES
 OF 15 TONS OR LESS PER SYSTEM MAY BE TESTED AND
 BALANCED BY A MECHANICAL CONTRACTOR LICENSED TO DESIGN
 AND INSTALL SUCH SYSTEM(S).
  
 2. BUILDINGS WITH COOLING OR HEATING SYSTEM CAPACITIES
 OF 65,000 BTU/H OR LESS PER SYSTEM ARE EXEMPT FROM THE
 REQUIREMENTS OF THIS SECTION.
  
 C408.2.2.1 AIR SYSTEM BALANCING.
 AIR SYSTEM BALANCING SHALL BE ACCOMPLISHED IN A MANNER
 TO FIRST MINIMIZE THROTTLING LOSSES, THEN FOR FANS WITH
 FAN SYSTEM POWER GREATER THAN 1 HP, FAN SPEEDS SHALL BE
 ADJUSTED TO MEET DESIGN FLOW CONDITIONS. BALANCING
 PROCEDURES SHALL BE IN ACCORDANCE WITH THE NATIONAL
 ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL
 STANDARDS, THE ASSOCIATED AIR BALANCE COUNCIL (AABC)
 NATIONAL STANDARDS, OR EQUIVALENT PROCEDURES.
  
 EXCEPTION: DAMPER THROTTLING MAY BE USED FOR AIR SYSTEM
 BALANCING WITH FAN MOTORS OF 1 HP OR LESS, OR IF
 THROTTLING RESULTS IN NO GREATER THAN 1/3 HP FAN
 HORSEPOWER DRAW ABOVE THAT REQUIRED IF THE FAN SPEED
 WERE ADJUSTED.
  
 NOTES:
  
 1. BUILDING ENVELOPE PRESSURIZATION SHOULD BE EITHER
 NEUTRAL OR POSITIVE TO PREVENT INFILTRATION OF EXCESS
 LATENT LOAD.
  
 2. COMMERCIAL KITCHEN HOOD EXHAUST CFM SHOULD BE SIZED
 TO PREVENT DEPRESSURIZATION. DISCHARGE DAMPERS ARE
 PROHIBITED ON CONSTANT VOLUME FANS AND VARIABLE VOLUME
 FANS WITH MOTORS 10 HORSEPOWER (HP) (7.5 KW) AND
 LARGER.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved