| Date |
Text |
| 2015-08-12 15:32:19 | 1ST REVIEW 2014 FBC |
| | |
| | COMMENTS: |
| | |
| | 1.PLEASE INDICATE ON THE PLANS OCCUPANCY LOAD AND |
| | CALC.. |
| | PB AMENDMENTS TO FBC 2014 SEC. 107.2.1.3 |
| | 2.PLEASE INDICATE ON THE PLANS OCCUPANCY CLASSIFICATION |
| | THIS IS A MIXED OCCUPANCY BUILDING, INDICATE WHICH BATH |
| | SERVES WHICH OCCUPANCY. |
| | WPB AMENDMENTS TO FBC 2014 SEC.107.2.1.3 |
| | 3.PLEASE SHOW DEMINTIONS FOR SHOWER SEAT SHALL COMPLY |
| | WITH. |
| | FBCA SEC. 610.3.2 |
| | 4.SHOWER CONTROLS ARE SHOWN ON OPPOSITE WALL FROM SEAT |
| | ELEVATION 1/A PG. AE 614 CONTROLS SHALL BE ON ADJACENT |
| | WALL FROM SEAT.TO COMPLY N. |
| | FBCA SEC. 608.5.2 |
| | 5. SHOW DETAIL ON DEMINTIONS FOR GRAB BARS IN TOILET |
| | ROOM . |
| | SIDE WALL SHALL COMPLY WITH 604.5.1 |
| | REAR WALL SHALL COMPLY WITH 604.5.2 |
| | 6.SHOW DETAIL FOR KNEE AND TOE CLEARANCE ON BREAK ROOM |
| | SINKS AND LAVATORY'S IN BATHROOMS SHALL COMPLY WITH. |
| | FBCA SEC. 306.2 AND 306.3 |
| | 7. SHOW CLEAR FLOOR SPACE FOR BREAK ROOM SINKS |
| | ,LAVATORY'S, SHOWER AND TOILETS SHALL COMPLY WITH . |
| | FBCA SEC. 305 |
| | 8.SHOW RISER DIAGRAM FOR SANITARY IN BATHROOM C-158 TO |
| | COMPLY WITH. |
| | WPB AMENDMENTS TO FBC 2014 SEC.107.3.5.1.3[13] |
| | 9. DOMESTIC WATER RISER NOT COMPLETE MISSING RM |
| | C-158,4IN. CW MAIN AND P-11.MUST SHAOW ALL WATER LINE |
| | IN THIS PHASE. |
| | WPB AMENDMENTS TO FBC 2014 SEC.107.3.5.1.3[13] |
| | 10COPE OF WORK ON THIS PROJECT IS UNCLEAR .IS PLUMBING |
| | ON THIRD FLOOR CHANGING , |
| | WPB AMENDMENTS TO FBC 2014 SEC.107.3.5.1.3[13 |
| | |
| | |
| | 11. PLEASE CLARIFY WHAT PHASE OF THIS PROJECT IS UNDER |
| | THIS PERMIT AND WHAT PHASES WILL BE UNDER OTHER PERMIT |
| | SOME SYSTEMS WILL OVERLAP AND I NEED ADDITIONAL |
| | INFORMATION TO DO A THOROUGH REVIEW. |
| | WPB AMENDMENTS TO FBC 2014 SEC.107.3.5.1.3[13 |
| | |
| | |
| | GEORGE JOHNSON |
| | PLUMBING PLANS EXAMINER |
| | 561-805-6711 |
| | [email protected] |
| | |
| | |
| | |
| | |