| Date |
Text |
| 2015-07-29 08:51:30 | 1ST REVIEW: FBC 2014 5TH ED. |
| | |
| | DENIED AS FOLLOWS: |
| | |
| | PROVIDE EVIDENCE THAT THE SOIL ENGINEER HAS REVIEWED |
| | THE FINAL DESIGN PER HIS REQUIREMENT ON PAGE 3 IN THE |
| | GEOTECHNICAL STUDY REPORT. |
| | |
| | PROVIDE ADDITIONAL DETAIL REGARDING THE ASSEMBLY AND |
| | WIND RESISTANCE CAPABILITY OF THE SKY PANEL SIGN. PER |
| | SECTION 6.0 CRITICAL FEATURES ON PAGE 17 OF 33 OF THE |
| | LISTING INFORMATION PROVIDED THE FIELD ASSEMBLY OF THIS |
| | SECTIONAL SIGN IS SUBJECT TO THE ACCEPTANCE OF THE |
| | LOCAL INSPECTION AUTHORITY. |
| | |
| | PROVIDE THE MANUFACTURERS INSTALLATION AND ASSEMBLY |
| | INSTRUCTIONS, PLEASE PROVIDE EVIDENCE THAT THE ENGINEER |
| | OF RECORD, CHRISTOPHER B. LAFORTE, P.E. HAS REVIEWED |
| | THE ASSEMBLY AND INSTALLATION INSTRUCTIONS FOR |
| | CONSISTENCY WITH HIS DESIGN AND THE THE SIGN PANEL HAS |
| | ADEQUATE WIND RESISTANCE CAPABILITY ITSELF. |
| | |
| | A DRAWING FROM ADTI MEDIA INC. WAS PROVIDED. PLEASE |
| | HAVE CHRISTOPHER B. LAFORTE, P.E. REVIEW NOTES 1-16 ON |
| | THAT DRAWING AND PROVIDE EVIDENCE OR REVIEW AND |
| | ACCEPTANCE OF THAT DRAWING OR ADDITIONAL DRAWINGS AND |
| | SPECIFICATIONS AS HE MAY REQUIRE. |
| | |
| | |
| | ADVISORY COMMENT: |
| | |
| | UPON INSTALLATION, A THIRD PARTY SHALL CERTIFY ALL |
| | BOLTED CONNECTIONS DEPICTED IN THE PLAN. |
| | |
| | A SEPARATE PERMIT IS REQUIRED FOR PLUMBING LINE |
| | RELOCATE AND FOR FLAG POLES RELOCATE. |
| | |
| | STEVEN KENNEDY, CBO |
| | CHIEF PLANS EXAMINER |
| | (561) 805-6710 |
| | [email protected] |
| | |