Plan Review Notes
Plan Review Notes For Permit 15070510
Permit Number 15070510
Review Stop M
Sequence Number 1
Notes
Date Text
2015-08-18 08:46:091ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15070510
 PHASES 1-4
 8/18/15
  
 GENERAL COMMENTS PHASES 1-4:
  
 1) REFER TO SECTION 606.2.1 FBC-14 MECHANICAL: 606.2.1
 RETURN AIR SYSTEMS.
 SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR
 SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM
 (0.9 M3/S) IN THE RETURN AIR DUCT OR PLENUM UPSTREAM OF
 ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIR
 CONNECTIONS, OR DECONTAMINATION EQUIPMENT AND
 APPLIANCES. PLEASE CORRECT ALL PLANS INDICATING THE DS
 DETECTORS IN THE SUPPLY DUCTS.
 2) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES: A)
 CURRENT FLORIDA PRODUCT APPROVALS OR MIAMI-DADE NOA'S
 FOR THE AC STANDS, THE O/A AND EXHAUST LOUVERS. B)
 MANUFACTURER'S SPECIFICATIONS AND INSTALLATION
 INSTRUCTIONS FOR THE VAV DIFFUSERS, THE DUCT SMOKE
 DETECTORS, THE FIRE DAMPERS, AND THE PLENUM-RATED PIPE
 INSULATIONS.
 3) PROVIDE THROUGH PENETRATION FIRESTOPPING DETAILS FOR
 PIPES PENETRATING THE RATED MECHANICAL ROOM WALLS.
 4) THE AREAS UNDER CONSTRUCTION SHALL ALSO BE PROVIDED
 WITH TEMPORARY HEAT IN ACCORDANCE WITH SECTION 309.1
 FBC-14 MECHANICAL. THE PORTABLE AC SCHEDULES ARE
 INDICATING COOLING ONLY.
 5) PLEASE REVIEW SECTION C408 FBC-14 ENERGY
 CONSERVATION: COMMISSIONING AND TESTING AND BALANCING
 OF THE SYSTEMS IS REQUIRED. PLEASE PROVIDE NOTES AND
 DETAILS ON THE PLANS TO VERIFY COMPLIANCE.
  
 PHASE-1:
 1) SHEET M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE
 AND SIZE OF ANCHOR BOLTS FOR THE CABLES AND THE
 CHANNELS. INDICATE THE WIND LOAD DESIGN CRITERIA AND
 THE DESIGN PRESSURES- SECTION 301.15 FBC-14 MECHANICAL.
 2) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS
 WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION.
  
 PHASE-2:
 1) M-103: PROVIDE THE EQUIPMENT SCHEDULE FOR THE
 EXISTING RTU.
 2) M-201: MISSING FIRE DAMPER FOR THE 14X12 DUCT
 PENETRATING THE RATED MECHANICAL ROOM WALL ON THE SOUTH
 SIDE.
 3) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE
 OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS.
 INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN
 PRESSURES- SECTION 301.15 FBC-14 MECHANICAL.
 4) M-302: PROVIDE COMPLETE DETAILS FOR THE EXTERIOR
 DUCT INSTALLATION- TYPE AND GAUGE OF DUCT STEEL, TYPE
 AND R-VALUE OF DUCT INSULATION, SPACING OF DUCT
 SUPPORTS, AND TYPES AND SIZES OF ANCHOR BOLTS. INDICATE
 THE WIND LOAD DESIGN CRITERIA AND WIND PRESSURES.
 5) M-302: PROVIDE COMPLETE DETAILS FOR THE ROOF TOP
 EQUIPMENT MOUNTING DETAIL- STRUCTURAL DETAILS FOR THE
 SUPPORT BASE, ANCHORING AND FASTENING DETAILS FOR THE
 RTU AND THE BASE, WIND DESIGN CRITERIA AND PRESSURES.
 6) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS
 WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION.
  
 PHASE-3:
 1) M-201: PROVIDE ENGINEERED STRUCTURAL DETAILS FOR
 INSTALLATION OF THE O/A DUCT AND INLET.
 2) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE
 OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS.
 INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN
 PRESSURES- SECTION 301.15 FBC-14 MECHANICAL.
  
 PHASE-4:
 1) M-201: MISSING FIRE DAMPER FOR THE DUCT PENETRATING
 THE RATED AHU-4 MECHANICAL ROOM WALLS OVER THE DOUBLE
 DOORS.
 2) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE
 OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS.
 INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN
 PRESSURES- SECTION 301.15 FBC-14 MECHANICAL.
 3) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS
 WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  