| 2015-08-18 08:46:09 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15070510 |
| | PHASES 1-4 |
| | 8/18/15 |
| | |
| | GENERAL COMMENTS PHASES 1-4: |
| | |
| | 1) REFER TO SECTION 606.2.1 FBC-14 MECHANICAL: 606.2.1 |
| | RETURN AIR SYSTEMS. |
| | SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR |
| | SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM |
| | (0.9 M3/S) IN THE RETURN AIR DUCT OR PLENUM UPSTREAM OF |
| | ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIR |
| | CONNECTIONS, OR DECONTAMINATION EQUIPMENT AND |
| | APPLIANCES. PLEASE CORRECT ALL PLANS INDICATING THE DS |
| | DETECTORS IN THE SUPPLY DUCTS. |
| | 2) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES: A) |
| | CURRENT FLORIDA PRODUCT APPROVALS OR MIAMI-DADE NOA'S |
| | FOR THE AC STANDS, THE O/A AND EXHAUST LOUVERS. B) |
| | MANUFACTURER'S SPECIFICATIONS AND INSTALLATION |
| | INSTRUCTIONS FOR THE VAV DIFFUSERS, THE DUCT SMOKE |
| | DETECTORS, THE FIRE DAMPERS, AND THE PLENUM-RATED PIPE |
| | INSULATIONS. |
| | 3) PROVIDE THROUGH PENETRATION FIRESTOPPING DETAILS FOR |
| | PIPES PENETRATING THE RATED MECHANICAL ROOM WALLS. |
| | 4) THE AREAS UNDER CONSTRUCTION SHALL ALSO BE PROVIDED |
| | WITH TEMPORARY HEAT IN ACCORDANCE WITH SECTION 309.1 |
| | FBC-14 MECHANICAL. THE PORTABLE AC SCHEDULES ARE |
| | INDICATING COOLING ONLY. |
| | 5) PLEASE REVIEW SECTION C408 FBC-14 ENERGY |
| | CONSERVATION: COMMISSIONING AND TESTING AND BALANCING |
| | OF THE SYSTEMS IS REQUIRED. PLEASE PROVIDE NOTES AND |
| | DETAILS ON THE PLANS TO VERIFY COMPLIANCE. |
| | |
| | PHASE-1: |
| | 1) SHEET M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE |
| | AND SIZE OF ANCHOR BOLTS FOR THE CABLES AND THE |
| | CHANNELS. INDICATE THE WIND LOAD DESIGN CRITERIA AND |
| | THE DESIGN PRESSURES- SECTION 301.15 FBC-14 MECHANICAL. |
| | 2) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS |
| | WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION. |
| | |
| | PHASE-2: |
| | 1) M-103: PROVIDE THE EQUIPMENT SCHEDULE FOR THE |
| | EXISTING RTU. |
| | 2) M-201: MISSING FIRE DAMPER FOR THE 14X12 DUCT |
| | PENETRATING THE RATED MECHANICAL ROOM WALL ON THE SOUTH |
| | SIDE. |
| | 3) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE |
| | OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS. |
| | INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN |
| | PRESSURES- SECTION 301.15 FBC-14 MECHANICAL. |
| | 4) M-302: PROVIDE COMPLETE DETAILS FOR THE EXTERIOR |
| | DUCT INSTALLATION- TYPE AND GAUGE OF DUCT STEEL, TYPE |
| | AND R-VALUE OF DUCT INSULATION, SPACING OF DUCT |
| | SUPPORTS, AND TYPES AND SIZES OF ANCHOR BOLTS. INDICATE |
| | THE WIND LOAD DESIGN CRITERIA AND WIND PRESSURES. |
| | 5) M-302: PROVIDE COMPLETE DETAILS FOR THE ROOF TOP |
| | EQUIPMENT MOUNTING DETAIL- STRUCTURAL DETAILS FOR THE |
| | SUPPORT BASE, ANCHORING AND FASTENING DETAILS FOR THE |
| | RTU AND THE BASE, WIND DESIGN CRITERIA AND PRESSURES. |
| | 6) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS |
| | WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION. |
| | |
| | PHASE-3: |
| | 1) M-201: PROVIDE ENGINEERED STRUCTURAL DETAILS FOR |
| | INSTALLATION OF THE O/A DUCT AND INLET. |
| | 2) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE |
| | OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS. |
| | INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN |
| | PRESSURES- SECTION 301.15 FBC-14 MECHANICAL. |
| | |
| | PHASE-4: |
| | 1) M-201: MISSING FIRE DAMPER FOR THE DUCT PENETRATING |
| | THE RATED AHU-4 MECHANICAL ROOM WALLS OVER THE DOUBLE |
| | DOORS. |
| | 2) M-301, CU MOUNTING DETAIL: PROVIDE THE TYPE AND SIZE |
| | OF ANCHOR BOLTS FOR THE CABLES AND THE CHANNELS. |
| | INDICATE THE WIND LOAD DESIGN CRITERIA AND THE DESIGN |
| | PRESSURES- SECTION 301.15 FBC-14 MECHANICAL. |
| | 3) M-501: INDICATE HOW THE TEMPORARY EXTERIOR DUCTS |
| | WILL BE SUPPORTED AND PROTECTED DURING CONSTRUCTION. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |