Plan Review Notes For Permit 15070198
Permit Number 15070198
Review Stop B
Sequence Number 1
Notes
Date Text
2015-08-01 10:15:05****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. SEE CITY OF WEST PALM BEACH AMENDMENTS TO THE
 FLORIDA BUILDING CODE SECTION 107:
  
 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS
 SHALL BE IN ACCORDANCE WITH SECTIONS
 107.2.1 THROUGH 107.2.5.
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE
 DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL.
 ELECTRONIC MEDIA DOCUMENTS SHALL BE
 SUBMITTED WHEN APPROVED BY THE BUILDING OFFICIAL.
 CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN
 DETAIL THAT IT WILL CONFORM TO THE PROVISIONS OF THIS
 CODE AND RELEVANT LAWS, ORDINANCES, RULES
 AND REGULATIONS, AS DETERMINED BY THE BUILDING
 OFFICIAL. SUCH DRAWINGS AND SPECIFICATIONS SHALL
 CONTAIN INFORMATION, IN THE FORM OF NOTES OR OTHERWISE,
 AS TO THE QUALITY OF MATERIALS, WHERE
 QUALITY IS ESSENTIAL TO CONFORMITY WITH THE TECHNICAL
 CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR
 ITS EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS,
 SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE
 NAME AND SIGNATURE OF THE PERSON
 RESPONSIBLE FOR THE DESIGN. (SEE ALSO SECTION 107.3.5).
  
 STRUCTURAL DETAILS FOR WALL AND ROOF FRAMING ARE NOT
 PROVIDED. AS THIS AFFECTS EXTERIOR WALLS (BUILDING
 ENVELOPE) EITHER PROVIDE ENGINEERING FOR STRUCTURAL
 LOAD BEARING ELEMENTS OR REVISE PLAN TO STATE DESIGN
 CRITERIA (FBC 5TH EDITION RESIDENTIAL 301.1). IF ASCE7
 IS USED AS DESIGN CRITERIA AND PLANS ARE NOT PREPARED
 BY A DESIGN PROFESSIONAL, PROVIDE CALCULATIONS FOR
 STRUCTURAL ELEMENTS (FRAMING, CONNECTORS).
  
 2. REVISE PLAN TO INCLUDE WIND DESIGN CRITERIA FBC 5TH
 EDITION RESIDENTIAL 301.2.1.
  
 3. REVISE PLAN TO INCLUDE METHOD OF COMPLIANCE
 SELECTED, FBC 5TH EDITION EXISTING BUILDING CODE 301.1.
  
 4. VALUE IS UNREASONABLY LOW. PROVIDE AN ACCURATE
 VALUE. VALUE IS TO INCLUDE THE MARKET VALUE OF LABOR,
 MATERIALS, OVERHEAD, PROFIT, ENGINEERING - EVERYTHING
 EXCEPT FOR LAND, CITY OF WEST PALM BEACH AMENDMENTS TO
 THE FLORIDA BUILDING CODE SECTION 109. WHEN PROVIDING
 THE VALUE, PROVIDE A COST BREAKDOWN ITEM BY ITEM. IF IT
 IS DETERMINED THAT THE VALUE IS STILL UNREASONABLY LOW,
 VALUE WILL BE BALLPARKED. IF APPLICANT OBJECTS, A STICK
 ESTIMATE WILL BE DONE BUT BE AWARE THAT THIS WILL DELAY
 PLAN REVIEW DUE TO THE LENGTH OF TIME REQUIRED.
  
 5. A STOP WORK VIOLATION HAS BEEN ISSUED. PLANS
 PROVIDED DO NOT MEET THE MINIMUM REQUIREMENTS FOR PLANS
 (SEE COMMENT 1). IF A DESIGN PROFESSIONAL IS HIRED,
 SEND A COPY OF THE CONTRACT. APPLICANT WAS GIVEN 30
 DAYS TO OBTAIN A PERMIT. EXTENSIONS WILL NOT BE GRANTED
 WITHOUT EVIDENCE THAT CONTRACTOR IS PURSUING RESOLUTION
 (EITHER A COMPETENT DESIGN PROFESSIONAL HIRED, OR PLANS
 RESUBMITTED).
  
 6. PLANS SHOW "EXISTING SMOKE DETECTORS." I WAS UNABLE
 TO LOCATE AN ELECTRICAL PERMIT FOR THIS ADDRESS FOR
 THIS ITEM. PROVIDE MORE INFORMATION, FBC 107. IF
 ADDITIONAL WORK WAS DONE WITHOUT PERMITS ON THIS
 STRUCTURE WHICH WAS NOT INCLUDED ON THE STOP WORK
 VIOLATION, REVISE PLAN TO INCLUDE.
  
  
  
  
  
  
  
  