| 2015-09-11 16:28:34 | 1ST REVIEW: FBC 2014 RESIDENTIAL |
| | PERMIT #15061466 |
| | 9/11/15 |
| | |
| | 1) SUBMIT COMPLETE MECHANICAL PLANS, DETAILS, AND |
| | SPECIFICATIONS FOR REVIEW INCLUDING: |
| | A) AC DUCT LAYOUT PLANS FOR EACH NEW SYSTEM INDICATING |
| | THE TYPES AND SIZES OF DUCTS, SUPPLY CFM'S AT EACH |
| | DIFFUSER, MEANS OF RETURN AIR INCLUDING DIMENSIONS OF |
| | RETURN AIR GRILLS, TRANSFER GRILLS, AND RETURN CFM'S. |
| | REFER TO SECTION M1602.2 FOR PROHIBITED RETURN AIR |
| | SOURCES. |
| | B) AC EQUIPMENT SCHEDULES LISTING THE MAKES AND MODELS |
| | OF ALL COMPONENTS, COOLING AND HEATING CAPACITIES, |
| | EFFICIENCY RATINGS, ELECTRICAL DATA ETC. |
| | C) AHRI CERTIFICATES FOR EACH NEW SYSTEM. |
| | D) AIR DISTRIBUTION SCHEDULE INDICATING MAKES, MODELS, |
| | AND DIMENSIONS OF DIFFUSERS AND GRILLS. |
| | E) AC DUCT CONNECTION, SUPPORT AND HANGING DETAILS |
| | F) DIMENSIONED PLAN AND SECTION VIEWS OF THE AIR |
| | HANDLER CLOSET INDICATING COMPLIANCE WITH SECTION |
| | M1305.1.1 FBC-14 RESIDENTIAL, AND SECTION C403.2.7.2 |
| | FBC-14 ENERGY CONSERVATION- SHOW THE MEANS OF RETURN |
| | AIR TO EACH UNIT IN THE CLOSET. |
| | G) CONDENSATE DISPOSAL PLANS- PRIMARY AND SECONDARY FOR |
| | EACH NEW AIR HANDLER- SEE SECTION M1411.3 RESIDENTIAL. |
| | H) WIND LOAD TIE DOWN ENGINEERING FOR MOUNTING THE AC |
| | CONDENSERS TO THE NEW PADS- SEE SECTIONS M1305.1.4.1 & |
| | M1307.2 FBC-14 RESIDENTIAL |
| | I) VERIFICATION OF CONDENSER INSTALLATION AT OR ABOVE |
| | THE BASE FLOOD ELEVATION HEIGHT- SEE SECTION R322.1.6 |
| | FBC-14 RESIDENTIAL. |
| | 2) PROVIDE BATHROOM EXHAUST DETAILS: EXHAUST FAN |
| | EQUIPMENT SCHEDULES, EXHAUST DUCT RUNS AND TERMINATION |
| | LOCATIONS. |
| | 3) PROVIDE DRYER EXHAUST AND MAKEUP AIR PLANS PER |
| | SECTION M1502: SHOW THE TYPE AND SIZE OF EXHAUST DUCT, |
| | EXHAUST DUCT RUN LENGTH AND TERMINATION LOCATION, AND |
| | INDICATE HOW MAKEUP AIR WILL BE SUPPLIED TO EACH DRYER. |
| | SUBMIT MANUFACTURER'S SPECS FOR THE APPLIANCES. |
| | 4) REFER TO SECTION M1503 AND PROVIDE KITCHEN EXHAUST |
| | VENTILATION PLANS. |
| | 5) PROVIDE SIZING CALCULATIONS FOR THE EXHAUST |
| | VENTILATION SYSTEMS SHOWN IN THE THE GARAGE, BIKE SHOP, |
| | AND STORAGE AREA ON THE1ST FLOOR. |
| | 6) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE CARBON |
| | MONOXIDE DETECTORS AND INDICATE THEIR EXACT |
| | INSTALLATION LOCATIONS ON THE PLAN (SPACINGS, HEIGHT |
| | AFF). |
| | 7) SUBMIT MANUFACTURER'S SPECIFICATIONS AND FL. PRODUCT |
| | APPROVALS FOR THE EXHAUST AND MAKE UP AIR FANS AND |
| | LOUVERS. PROVIDE FAN SCHEDULES ON THE PLANS INDICATING |
| | THEIR CFM CAPACITIES, ELECTRICAL DATA ETC. |
| | PLEASE NOTE ADDITIONAL COMMENTS MAY FOLLOW SUBMITTAL OF |
| | REVISED PLANS AND RESPONSES TO ALL BUILDING DEPARTMENT |
| | COMMENTS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |
| | |