| Date |
Text |
| 2015-07-01 17:26:58 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15061462 |
| | |
| | 1) PLEASE SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE |
| | SPRAY BOOTH, THE MIXING ROOM, THE AIR FILTERS, THE |
| | EXHAUST FANS, THE COMPRESSOR AND THE SPRAY EQUIPMENT |
| | REVIEWED AND STAMPED BY THE ENGINEER OF RECORD- |
| | REFERENCE NFPA 33 SECTIONS (5.1.1), )5.1.4), (7.10.1), |
| | (8.3.2), (11.1), (12.1). |
| | 2) THE LOCATIONS OF THE SPRAY BOOTHS SHOWN ABUTTING THE |
| | EXTERIOR CONCRETE WALLS DOES NOT LEAVE AMPLE SPACE FOR |
| | MAINTENANCE AS REQUIRED BY SECTION 5.3.2 EXCEPTION (2) |
| | NFPA 33. |
| | 3) PROVIDE EXHAUST FAN SCHEDULES ON THE PLAN FOR THE |
| | BOOTHS AND THE MIXING ROOM- SECTION 7.10.1. |
| | 4) PROVIDE AIR VELOCITY CALCULATIONS FOR EACH SPRAY |
| | BOOTH INDICATING COMPLIANCE WITH SECTION 502.7.3.3 |
| | FBC-14 MECHANICAL. |
| | 5) PROVIDE AN EXHAUST VENTILATION CALCULATION FOR THE |
| | MIXING ROOM AND INDICATE HOW MAKE-UP AIR IS BEING |
| | PROVIDED. THERE IS NO LINK TO THE OVERHEAD DOOR SHOWN |
| | ON THE PLAN- SECTION 502.9.5.4 FBC-14 MECHANICAL. |
| | 6) INDICATE HOW THE EXHAUST DUCTS ARE BEING SUPPORTED |
| | IN THE AREA BETWEEN THE TOP OF THE BOOTH AND THE ROOF |
| | LEVEL- SECTION 7.8 NFPA 33. |
| | 7) REFERENCE SECTION 501.3.1(1) FBC-14 MECHANICAL AND |
| | PROVIDE A ROOF PLAN INDICATING THE REQUIRED MINIMUM |
| | CLEARANCE DISTANCES FOR EXHAUST TERMINATIONS TO |
| | PROPERTY LINES, AIR INTAKES, COMBUSTIBLE CONSTRUCTION, |
| | EXTERIOR WALLS, AND OPERABLE OPENINGS. |
| | 8) INDICATE THE TYPE OF COMPRESSED AIR PIPING SUPPORTS |
| | OR HANGERS TO BE INSTALLED, AND SPACING OF THE HANGERS |
| | OR SUPPORTS. |
| | 9) PROVIDE A THROUGH PENETRATION FIRE STOPPING METHOD |
| | FOR THE COMPRESSED AIR PIPING PENETRATING THE SPRAY |
| | BOOTHS |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |