| 2015-08-19 08:36:39 | 1ST REVIEW: FBC 2010 |
| | |
| | CURRENTLY UNDER REVIEW: |
| | |
| | THE PLANS LACK DETAIL AND CLARITY: |
| | |
| | FBC 107.2.1 CONSTRUCTION DOCUMENTS SHALL BE OF |
| | SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| | EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| | WILL CONFORM TO THE PROVISIONS OF THIS CODE AND |
| | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS |
| | DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND |
| | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM |
| | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, |
| | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE |
| | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, |
| | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE |
| | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS |
| | EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC |
| | INFORMATION. A COMPLETE REVIEW CANNOT BE PERFORMED. |
| | |
| | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE |
| | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| | SPECIFICALLY, PROVIDE ROOFING, WINDOW, AND DOOR |
| | SUBMITTALS. |
| | |
| | R401.4 SOIL TESTS - PROVIDE A SOILS ANALYSIS |
| | |
| | FBC 107 & FBCR 601 - WALL CONSTRUCTION; PROVIDE DETAILS |
| | TO CLARIFY OR SPECIFY THE FOLLOWING: HEADERS, |
| | TRIMMER/CRIPPLE STUDS, A WALL SHEATHING NAILING |
| | SCHEDULE. PROVIDE A DETAIL TO TERMINATE THE STUCCO AT |
| | THE FOUNDATION TO DEMONSTRATE COMPLIANCE WITH FBCR704, |
| | TERMITE INSPECTION. PROVIDE WINDOW AND DOOR |
| | INSTALLATION DETAILS TO MEET ANCHORAGE OF FBCR 612.10 . |
| | DESIGN PRESSURES FOR WINDOW #3 APPEAR LOW AS THEY ARE |
| | LOCATED IN ZONE 5. R703.6.3 TWO LAYERS OF WATER |
| | RESISTANT BARRIER ARE REQUIRED. |
| | |
| | FBC 107 & FBCR 801 - ROOF CONSTRUCTION - PROVIDE |
| | DETAILS TO CLARIFY OR SPECIFY THE FOLLOWING: ROOF |
| | VENTILATION PER R806, ROOF DRAINAGE, NOTE: THE ROOF |
| | FRAMING DETAIL AND ROOF FRAMING PLAN ARE IN CONFLICT AS |
| | TO THE DIRECTION OF RUN OF THE MAIN ROOF TRUSSES. YOU |
| | SHOULD PROVIDE THE ROOF TRUSS ENGINEERING NOW AND THE |
| | DESIGNER SHOULD EVALUATE THE ROOF FRAMING PLAN VS. THE |
| | TRUSS DESSIGN. SPECIFY THE ROOF SHEATHING NAIL LENGTH |
| | AND SHANK TYPE. FURTHER SPECIFT THE PARAPET |
| | CONSTRUCTION. |
| | |
| | |
| | STEVEN KENNEDY, CBO |
| | CHIEF PLANS EXAMINER |
| | (561) 805-6710 |
| | [email protected] |
| | |