Plan Review Notes
Plan Review Notes For Permit 15061210
Permit Number 15061210
Review Stop B
Sequence Number 1
Notes
Date Text
2015-08-19 08:36:391ST REVIEW: FBC 2010
  
 CURRENTLY UNDER REVIEW:
  
 THE PLANS LACK DETAIL AND CLARITY:
  
 FBC 107.2.1 CONSTRUCTION DOCUMENTS SHALL BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. A COMPLETE REVIEW CANNOT BE PERFORMED.
  
 FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE
 PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD.
 SPECIFICALLY, PROVIDE ROOFING, WINDOW, AND DOOR
 SUBMITTALS.
  
 R401.4 SOIL TESTS - PROVIDE A SOILS ANALYSIS
  
 FBC 107 & FBCR 601 - WALL CONSTRUCTION; PROVIDE DETAILS
 TO CLARIFY OR SPECIFY THE FOLLOWING: HEADERS,
 TRIMMER/CRIPPLE STUDS, A WALL SHEATHING NAILING
 SCHEDULE. PROVIDE A DETAIL TO TERMINATE THE STUCCO AT
 THE FOUNDATION TO DEMONSTRATE COMPLIANCE WITH FBCR704,
 TERMITE INSPECTION. PROVIDE WINDOW AND DOOR
 INSTALLATION DETAILS TO MEET ANCHORAGE OF FBCR 612.10 .
 DESIGN PRESSURES FOR WINDOW #3 APPEAR LOW AS THEY ARE
 LOCATED IN ZONE 5. R703.6.3 TWO LAYERS OF WATER
 RESISTANT BARRIER ARE REQUIRED.
  
 FBC 107 & FBCR 801 - ROOF CONSTRUCTION - PROVIDE
 DETAILS TO CLARIFY OR SPECIFY THE FOLLOWING: ROOF
 VENTILATION PER R806, ROOF DRAINAGE, NOTE: THE ROOF
 FRAMING DETAIL AND ROOF FRAMING PLAN ARE IN CONFLICT AS
 TO THE DIRECTION OF RUN OF THE MAIN ROOF TRUSSES. YOU
 SHOULD PROVIDE THE ROOF TRUSS ENGINEERING NOW AND THE
 DESIGNER SHOULD EVALUATE THE ROOF FRAMING PLAN VS. THE
 TRUSS DESSIGN. SPECIFY THE ROOF SHEATHING NAIL LENGTH
 AND SHANK TYPE. FURTHER SPECIFT THE PARAPET
 CONSTRUCTION.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved