| 2015-07-04 06:52:56 | 1) THE PIPING PLAN SHOWS UNDERGROUND GAS PIPING & |
| | SLEEVE TO TWO DRYERS. GAS PIPING IS PROHIBITED PER THE |
| | 2010 FBC-R SEC. G2415.4. THE INSTALLATION OF GAS PIPNG |
| | BENEATH BUILDINGS IS PERMITTED WHEN THERE IS NO OTHER |
| | WAY TO INSTALL THE PIPING. SUBMIT A FLOOR PLAN SHOWING |
| | THE LOCATION OF ALL ALL GAS APPLIANCES IN RELATION TO |
| | THE GAS METER. THE DRYERS SHALL NOT BE PIPED UNDER THE |
| | SLAB UNLESS THAT IS THE ONLY ALTERNATIVE. |
| | 2) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL |
| | GAS APPLIANCES & EQUIPMENT. ALL APPLIANCES & EQUIPMENT |
| | SHALL BE LISTED PER THE 2010 FBC-R SEC.G2404.3. |
| | 3)THE FOLLOWING ITEMS SHALL BE IDENTIFIED ON BOTH |
| | DRAWINGS FOR THE INSTALLATION OF THE GAS PIPING UNDER |
| | THE BUILDING SLAB IF IT IS ALLOWED. THE INSTALLATION |
| | UNDER THE SALB IS CONTINGENT UPON THE LOCATION OF THE |
| | GAS DRYERS. |
| | A) INDICATE THE TYPE OF SLEEVE MATERIAL FOR THE PIPING |
| | FOR THE DRYERS ON THE PLAN. THE MATERIAL SHALL COMPLY |
| | WITH 2010 FBC-R SEC.G2415.12. |
| | B) THE TERMINATION OF THE CONDUIT INDOOR AND OUTDOOR |
| | SHALL COMPLY WITH 2010 FBC-R SEC. G2415.12.1. |
| | C) INDICATE ON THE PLAN HOW THE ANNULAR SPACE BETWEEN |
| | THE GAS PIPING AND THE SLEEVE IS TO BE SEALED. BE |
| | SPECIFIC. |
| | D) INDICATE THE TYPE OF GAS PIPING TO BE INSTALLED TO |
| | THE DRYERS. PE PIPING CAN ONLY BE INSTALLED OUTSIDE |
| | UNDERGROUND PER THE 2010 FBC-R SEC. G2415.15.1. |
| | 4) INDICATE THE APPLICABLE SIZING TABLES USED FOR THE |
| | SIZING OF THE PE LINE AND ALSO THE PIPING TO THE |
| | DRYERS.2010 FBC-R SEC. G2413.3. |
| | 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE 2 |
| | PSI REGULATORS. REGULATORS SHALL COMPLY WITH 2010 FBC-R |
| | SEC.G2421.1 & G2421.2. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |