| Plan Review Notes For Permit 15061025 |
| Permit Number |
15061025 |
|
| Review Stop |
E |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-06-24 16:57:59 | 6/24/2015 | | | PROJECT: AIM SUITE 150 | | | PERMIT#: 15061025 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW | | | COMMENTS: | | | | | | 1) INDICATE THE SPECIFIC USE AND CONNECTION OF THE NEW | | | 100AMP 3PHASE 100AMP CIRCUIT . THE RISER DIAGRAM | | | INDICATES A NEW DISCONNECT THEN CALLS OUT TO VERIFY | | | FINAL CONNECTION TO EQUIPMENT. THE FLOOR PLAN INDICATES | | | THE NEW 100AMP 3PHASE DISCONNECT CONNECTED TO A | | | RECEPTACLE SYMBOL. PLEASE CLARIFY AND AND INDICATE WHAT | | | EQUIPMENT THE NEW CIRCUIT IS FOR AND THE METHODS AND | | | MATERIALS USED FOR THE FIANL CONNECTION. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|