Plan Review Notes For Permit 15060563
Permit Number 15060563
Review Stop M
Sequence Number 1
Notes
Date Text
2015-07-06 07:26:431ST REVIEW: FBC 2010 MECHANICAL
 PERMIT #15060563 CENTRIFUGE DEWATERING BUILDING- 7/2/15
  
 SITE AND CIVIL: NO DRAWINGS SUBMITTED.
 1) BASED ON THE SOILS REPORT- PIPE BEDDING AND
 DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH
 CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND
 HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH
 DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS
 AND THICKNESSES, COMPACTION AND BACKFILLING
 SPECIFICATIONS.
 2) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL
 UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS
 DEPICTING THE UNDERGROUND PIPINGS SERVICING EACH TANK,
 FACILITY, OR BUILDING.
  
 SPECIFIC COMMENTS TO THE DEWATERING BUILDING MECHANICAL
 AND HVAC SYSTEMS:
 1) PROVIDE ADDITIONAL DETAILS AND NOTES FOR THE FOUL
 AIR (FA) SYSTEMS CLARIFYING HOW THE AIR IS BEING
 EXHAUSTED FROM THE EQUIPMENT AND TRANSFERRED TO THE
 ODOR CONTROL SCRUBBER- REFERENCE SHEETS M-DEW-08 & 10.
 PROVIDE EQUIPMENT SCHEDULES FOR ALL COMPONENTS OF THE
 EXHAUST SYSTEM- FANS, DUCTS, DAMPERS ETC. SHOW THE
 LOCATIONS OF THE EXHAUST FANS, SHOW DUCT CONNECTION AND
 SUPPORT DETAILS, AND SHOW THE UNDERGOUND DUCT RUNS. IF
 THE DETAILS ARE CONTAINED IN THE CIVIL DRAWINGS, THEN
 PLEASE INCLUDE THE APPLICABLE SHEETS WITH THE PLAN SETS
 FOR THIS PERMIT
 2) PROVIDE THE FOLLOWING LIST OF CALCULATIONS ON THE
 PLAN: A) VENTILATION CALCULATIONS FOR ALL ROOMS AND
 SPACES IN COMPLIANCE WITH TABLE 403.3 FBC- 10
 MECHANICAL. PROVIDE A TABLE ON THE PLAN SHOWING THE
 REQUIRED MINIMUM O/A CFM'S AND THE CFM AMOUNT BEING
 PROVIDED. B) EXHAUST VENTILATION CALCULATIONS PERTABLE
 403.3 FBC-10 MECHANICAL, OR TABLE 6-4 ASHRAE 62.1-07.
 C) AIR BALANCE CALCULATIONS.
 3) SUBMIT THE FOLLOWING ENERGY EFFICIENCY COMPLIANCE
 DOCUMENTS PREPARED BY THE ENGINEER OF RECORD: A)
 COOLING AND HEATING CALCULATIONS IN ACCORDANCE WITH
 ACCA MANUAL N OR APPROVED ALTERNATE METHOD FOR ALL NEW
 AC SYSTEMS TO BE INSTALLED- SECTION 503.2.1 FBC-10
 ENERGY EFFICIENCY. B) ENERGY EFFICIENCY FORM 502-2010
 OR 506-2010.
 4) SHEET H-DEW-1: THE EXHAUST SYSTEM IN THE LOADING
 AREA SHALL RUN CONTINUOUSLY OR AUTOMATICALLY UPON
 DETECTION OF CARBON MONOXIDE OF 25 PARTS PER MILLION
 (PPM) BY APPROVED AUTOMATIC DETECTION DEVICES- SECTION
 404.1 FBC-10 MECHANICAL. REVISE THE PLAN ACCORDINGLY.
 5) SHEETS H-DEW-1, 2, 3, & 4: SHOW THE LOCATIONS OF THE
 REQUIRED DUCT SMOKE DETECTORS IN THE SUPPLY AND RETURN
 DUCTS- SECTION 606.2.2. INDICATE HOW THE DETECTORS WILL
 BE SUPERVISED PER SECTION 606.4.1, AND PROVIDE AN
 EQUIPMENT SCHEDULE ON THE PLAN FOR THE DEVICES.
 6) H-DEW-2: INDICATE HOW SUPPLY AIR IS BEING RETURNED
 FROM THE CONTROL/OFFICE ROOM AND THE BREAKROOM- SECTION
 601.4.
 7) H-DEW-2: PROVIDE EXHAUST VENTILATION FOR THE WOMEN'S
 TOILET/SHOWER ROOMS- TABLE 403.3.
 8) H-DEW-2: ENGINEERED WIND LOAD TIE-DOWN DETAILS FOR
 MOUNTING THE CONDENSERS AND ROOF STANDS ON THE LOW ROOF
 ARE REQUIRED PER SECTION 301.12. PLEASE PROVIDE
 DETAILS, OR PLACE A NOTE INDICATING ON WHICH STRUCTURAL
 OR ARCHITECTURAL SHEET THE DETAILS ARE LOCATED. PROVIDE
 ELEVATION AND PLAN VIEW DRAWINGS TO INDICATE COMPONENTS
 OF THE STANDS, AND THE CONDENSER HEIGHTS ABOVE THE
 FINISHED ROOF. IN ADDITION PROVIDE DETAILS FOR
 ANCHORING AND SUPPORTING THE REFRIGERANT PIPINGS, AND
 THE TYPE AND THICKNESS OF PIPING INSULATION.
 9) H-DEW-3: INDICATE HOW SUPPLY AIR IS BEING RETURNED
 FORM THE CONTROLS AREA.
 10) H-DEW-3: PROVIDE A MEANS OF VENTILATION FOR THE
 STORAGE ROOM- TABLE 403.3
 11) H-DEW-3: PROVIDE A FIRE DAMPER FOR THE CASSETTE
 SHOWN IN THE FIRE-RATED ELEVATOR MACHINE ROOM WALL.
 12) PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE PLAN
 LISTING MAKES AND MODELS AND SIZES OF ALL COMPONENTS
 INCLUDING DUCTS, DIFFUSERS, AND RETURN GRILLS.
 13) PROVIDE TYPICAL DUCT HANGING AND CONNECTION DETAILS
 IN ACCORDANCE WITH THE SMACNA 2005 STANDARD.
 14) PROVIDE TESTED AND APPROVED FIRE STOPPING SYSTEM
 DETAILS FOR ALL PIPES OR DUCTS PENETRATING FIRE-RATED
 WALLS.
 15) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES A)
 FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE NOA'S FOR
 ALL PRODUCTS REGULATED BY FAC RULE 9N-3 REVIEWED AND
 APPROVED IN WRITING BY THE DESIGN PROFESSIONAL OF
 RECORD (CONDENSER STANDS, EXHAUST AND INTAKE LOUVERS
 AND FANS ETC.). B) MANUFACTURER'S PRODUCT DATA SHEETS
 FOR THE AC SYTEMS, EXHAUST FANS, FIRE DAMPERS, DUCT
 SMOKE OR CARBON MONOXIDE DETECTORS, O/A MOTORIZED
 DAMPERS, ELECTRONIC CONTROLS, PIPINGS, PIPE FIOTTINGS
 AND INSULATION ETC.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  