2015-07-15 14:18:271ST REVIEW: FBC 2010 MECHANICAL
 PERMIT #15060562 MAIN ELECTRICAL BUILDING
 7/15/15
  
 1) SUBMIT THE FOLLOWING ENERGY EFFICIENCY COMPLIANCE
 DOCUMENTS PREPARED BY THE ENGINEER OF RECORD: A)
 COOLING AND HEATING CALCULATIONS FOR MEB- AC-1, 2, & 3
 IN ACCORDANCE WITH ACCA MANUAL N OR APPROVED ALTERNATE
 METHOD- SECTION 503.2.1 FBC-10 ENERGY CONSERVATION . B)
 ENERGY EFFICIENCY FORM 502-2010 OR 506-2010- REFERENCE
 SECTIONS 101.3, 103, AND CHAPTER 5 FBC-10 ENERGY
 CONSERVATION. THE DESIGN PROFESSIONAL SHALL CHOOSE
 EITHER THE PRESCRIPTIVE (502) OR PERFORMANCE BASED
 (506) COMPLIANCE PATH FOR THE BUILDING AND BUILDING
 SYSTEMS INCLUDING BUT NOT LIMITED TO THE COMPONENTS OF
 THE THERMAL ENVELOPE, THE HVAC, THE ELECTRICAL POWER,
 LIGHTING, AND CONTROLS.
 2) PROVIDE EQUIPMENT SCHEDULES ON THE PLANS FOR THE
 MEB- AC- 1, 2, & 3.
 3) PROVIDE MINIMUM VENTILATION CALCULATIONS ON THE PLAN
 IN COMPLIANCE WITH TABLE 403.3 FBC-10 MECHANICAL.
 PROVIDE A SCHEDULE ON THE PLAN INDICATING THE REQUIRED
 CFM'S OF O/A, AND THE TOTAL CFM'S TO BE PROVIDED.
 4) THE ELECTRICAL DRAWINGS ARE INDICATING BATTERY
 STORAGE IN THE BUILDING- REFER TO SECTION 502.4 FBC-10
 MECHANICAL- [F] 502.4 STATIONARY STORAGE BATTERY
 SYSTEMS.
 STATIONARY STORAGE BATTERY SYSTEMS, AS REGULATED BY THE
 FLORIDA FIRE PREVENTION CODE, SHALL BE PROVIDED WITH
 VENTILATION IN ACCORDANCE WITH THIS CHAPTER AND SECTION
 502.4.1 OR 502.4.2.
 EXCEPTION: LITHIUM-ION BATTERIES SHALL NOT REQUIRE
 VENTILATION.
 [F] 502.4.1 HYDROGEN LIMIT IN ROOMS.
 FOR FLOODED LEAD ACID, FLOODED NICKEL CADMIUM AND VRLA
 BATTERIES, THE VENTILATION SYSTEM SHALL BE DESIGNED TO
 LIMIT THE MAXIMUM CONCENTRATION OF HYDROGEN TO 1.0
 PERCENT OF THE TOTAL VOLUME OF THE ROOM.
 [F] 502.4.2 VENTILATION RATE IN ROOMS.
 CONTINUOUS VENTILATION SHALL BE PROVIDED AT A RATE OF
 NOT LESS THAN 1 CUBIC FOOT PER MINUTE PER SQUARE FOOT
 (CFM/FT2) [0.00508 M3/(S ? M2)] OF FLOOR AREA OF THE
 ROOM.
 5) SHEET H-MEB-01: PROVIDE A SEQUENCE OF OPERATION FOR
 THE AC SYSTEMS, INCLUDING HOW THE O/A INTAKES WILL BE
 CONTROLLED- REFERENCE SECTION 503.2.5.3 FBC-10 ENERGY
 CONSERVATION. WILL MOTORIZED DAMPERS BE INSTALLED?
 PLEASE NOTE THAT THERMOSTATS ARE NOT SHOWN ON THE PLAN.
 6) PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE PLAN
 LISTING MAKES AND MODELS AND SIZES OF ALL COMPONENTS
 INCLUDING DUCTS, DIFFUSERS, AND RETURN GRILLS.
 7) PROVIDE TYPICAL DUCT HANGING AND CONNECTION DETAILS
 IN ACCORDANCE WITH THE SMACNA 2005 STANDARD.
 8) PROVIDE TESTED AND APPROVED FIRE STOPPING SYSTEM
 DETAILS FOR ALL PIPES OR DUCTS PENETRATING FIRE-RATED
 WALLS.
 9) H-MEB-01: DUCT SMOKE DETECTORS ARE REQUIRED IN THE
 SUPPLY DUCTS OF THE AC SYSTEMS: PLEASE PROVIDE A SYMBOL
 ON THE PLAN TO SHOW THEIR LOCATIONS AND PROVIDE AN
 INSTALLATION DETAIL ON THE PLAN- SECTION 606.2.1 FBC-10
 MECHANICAL. PROVIDE INSTALLATION DETAILS FOR THE
 DEVICES, AND HOW THEY WILL BE SUPERVISED PER SECTION
 606.4.1.
 10) H-MEB-01: PROVIDE STRUCTURAL DETAILS FOR
 INSTALLATION OF THE CONDENSER PADS AND ENGINEERED WIND
 LOAD TIE-DOWN DETAILS FOR MOUNTING AC UNITS TO THE
 PADS- SECTION 301.12 FBC-10 MECHANICAL.
 11) BASED ON THE SOILS REPORT- PIPE BEDDING AND
 DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH
 CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND
 HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH
 DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS
 AND THICKNESSES, COMPACTION AND BACKFILLING
 SPECIFICATIONS.
 12) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL
 UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS
 DEPICTING THE UNDERGROUND PIPES SERVICING EACH TANK,
 FACILITY, OR BUILDING.
 13) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES A)
 FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE NOA'S FOR
 ALL PRODUCTS REGULATED BY FAC RULE 9N-3 REVIEWED AND
 APPROVED IN WRITING BY THE DESIGN PROFESSIONAL OF
 RECORD (HVAC ROOF CURBS, EXHAUST FANS AND CURBS,
 EXHAUST AND INTAKE LOUVERS, ETC.). B) MANUFACTURER'S
 PRODUCT DATA SHEETS FOR THE AC SYSTEMS, ROOF MOUNTED
 EXHAUST FANS, DS DETECTORS, O/A DAMPERS, ELECTRONIC
 CONTROLS, PIPING AND FITTINGS, AND PIPE INSULATION ETC.
  
 CHRISTOPHER L. COLE