| 2015-07-15 14:18:27 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | PERMIT #15060562 MAIN ELECTRICAL BUILDING |
| | 7/15/15 |
| | |
| | 1) SUBMIT THE FOLLOWING ENERGY EFFICIENCY COMPLIANCE |
| | DOCUMENTS PREPARED BY THE ENGINEER OF RECORD: A) |
| | COOLING AND HEATING CALCULATIONS FOR MEB- AC-1, 2, & 3 |
| | IN ACCORDANCE WITH ACCA MANUAL N OR APPROVED ALTERNATE |
| | METHOD- SECTION 503.2.1 FBC-10 ENERGY CONSERVATION . B) |
| | ENERGY EFFICIENCY FORM 502-2010 OR 506-2010- REFERENCE |
| | SECTIONS 101.3, 103, AND CHAPTER 5 FBC-10 ENERGY |
| | CONSERVATION. THE DESIGN PROFESSIONAL SHALL CHOOSE |
| | EITHER THE PRESCRIPTIVE (502) OR PERFORMANCE BASED |
| | (506) COMPLIANCE PATH FOR THE BUILDING AND BUILDING |
| | SYSTEMS INCLUDING BUT NOT LIMITED TO THE COMPONENTS OF |
| | THE THERMAL ENVELOPE, THE HVAC, THE ELECTRICAL POWER, |
| | LIGHTING, AND CONTROLS. |
| | 2) PROVIDE EQUIPMENT SCHEDULES ON THE PLANS FOR THE |
| | MEB- AC- 1, 2, & 3. |
| | 3) PROVIDE MINIMUM VENTILATION CALCULATIONS ON THE PLAN |
| | IN COMPLIANCE WITH TABLE 403.3 FBC-10 MECHANICAL. |
| | PROVIDE A SCHEDULE ON THE PLAN INDICATING THE REQUIRED |
| | CFM'S OF O/A, AND THE TOTAL CFM'S TO BE PROVIDED. |
| | 4) THE ELECTRICAL DRAWINGS ARE INDICATING BATTERY |
| | STORAGE IN THE BUILDING- REFER TO SECTION 502.4 FBC-10 |
| | MECHANICAL- [F] 502.4 STATIONARY STORAGE BATTERY |
| | SYSTEMS. |
| | STATIONARY STORAGE BATTERY SYSTEMS, AS REGULATED BY THE |
| | FLORIDA FIRE PREVENTION CODE, SHALL BE PROVIDED WITH |
| | VENTILATION IN ACCORDANCE WITH THIS CHAPTER AND SECTION |
| | 502.4.1 OR 502.4.2. |
| | EXCEPTION: LITHIUM-ION BATTERIES SHALL NOT REQUIRE |
| | VENTILATION. |
| | [F] 502.4.1 HYDROGEN LIMIT IN ROOMS. |
| | FOR FLOODED LEAD ACID, FLOODED NICKEL CADMIUM AND VRLA |
| | BATTERIES, THE VENTILATION SYSTEM SHALL BE DESIGNED TO |
| | LIMIT THE MAXIMUM CONCENTRATION OF HYDROGEN TO 1.0 |
| | PERCENT OF THE TOTAL VOLUME OF THE ROOM. |
| | [F] 502.4.2 VENTILATION RATE IN ROOMS. |
| | CONTINUOUS VENTILATION SHALL BE PROVIDED AT A RATE OF |
| | NOT LESS THAN 1 CUBIC FOOT PER MINUTE PER SQUARE FOOT |
| | (CFM/FT2) [0.00508 M3/(S ? M2)] OF FLOOR AREA OF THE |
| | ROOM. |
| | 5) SHEET H-MEB-01: PROVIDE A SEQUENCE OF OPERATION FOR |
| | THE AC SYSTEMS, INCLUDING HOW THE O/A INTAKES WILL BE |
| | CONTROLLED- REFERENCE SECTION 503.2.5.3 FBC-10 ENERGY |
| | CONSERVATION. WILL MOTORIZED DAMPERS BE INSTALLED? |
| | PLEASE NOTE THAT THERMOSTATS ARE NOT SHOWN ON THE PLAN. |
| | 6) PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE PLAN |
| | LISTING MAKES AND MODELS AND SIZES OF ALL COMPONENTS |
| | INCLUDING DUCTS, DIFFUSERS, AND RETURN GRILLS. |
| | 7) PROVIDE TYPICAL DUCT HANGING AND CONNECTION DETAILS |
| | IN ACCORDANCE WITH THE SMACNA 2005 STANDARD. |
| | 8) PROVIDE TESTED AND APPROVED FIRE STOPPING SYSTEM |
| | DETAILS FOR ALL PIPES OR DUCTS PENETRATING FIRE-RATED |
| | WALLS. |
| | 9) H-MEB-01: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY DUCTS OF THE AC SYSTEMS: PLEASE PROVIDE A SYMBOL |
| | ON THE PLAN TO SHOW THEIR LOCATIONS AND PROVIDE AN |
| | INSTALLATION DETAIL ON THE PLAN- SECTION 606.2.1 FBC-10 |
| | MECHANICAL. PROVIDE INSTALLATION DETAILS FOR THE |
| | DEVICES, AND HOW THEY WILL BE SUPERVISED PER SECTION |
| | 606.4.1. |
| | 10) H-MEB-01: PROVIDE STRUCTURAL DETAILS FOR |
| | INSTALLATION OF THE CONDENSER PADS AND ENGINEERED WIND |
| | LOAD TIE-DOWN DETAILS FOR MOUNTING AC UNITS TO THE |
| | PADS- SECTION 301.12 FBC-10 MECHANICAL. |
| | 11) BASED ON THE SOILS REPORT- PIPE BEDDING AND |
| | DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH |
| | CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND |
| | HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH |
| | DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS |
| | AND THICKNESSES, COMPACTION AND BACKFILLING |
| | SPECIFICATIONS. |
| | 12) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL |
| | UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS |
| | DEPICTING THE UNDERGROUND PIPES SERVICING EACH TANK, |
| | FACILITY, OR BUILDING. |
| | 13) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES A) |
| | FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE NOA'S FOR |
| | ALL PRODUCTS REGULATED BY FAC RULE 9N-3 REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGN PROFESSIONAL OF |
| | RECORD (HVAC ROOF CURBS, EXHAUST FANS AND CURBS, |
| | EXHAUST AND INTAKE LOUVERS, ETC.). B) MANUFACTURER'S |
| | PRODUCT DATA SHEETS FOR THE AC SYSTEMS, ROOF MOUNTED |
| | EXHAUST FANS, DS DETECTORS, O/A DAMPERS, ELECTRONIC |
| | CONTROLS, PIPING AND FITTINGS, AND PIPE INSULATION ETC. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |