| Plan Review Notes For Permit 15060558 |
| Permit Number |
15060558 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2016-01-13 06:53:28 | 1) PER THE SUBMITTED MSDS SHEETS FERRIC CHLORIDE IS | | | CONSIDERED A CORROSIVE LIQUID. TABLE 307.1 (2) OF THE | | | 2014 FBCB, THE MAXIMUM ALLOWABLE QUANTITY TO BE STORED | | | ONSITE IS 500 GALLONS. THE AMOUNT STORED CAN BE | | | INCREASED 100% IF THE STRUCTURE IS EQUIPPED WITH AN | | | APPROVED AUTOMATIC SPRINKLER SYSTEM PER 2014 FBC | | | SEC.903.3.1.1. PLEASE CLARIFY HOW COMPLIANCE IS BEING | | | MET FOR THE AMOUNT OF LIQUID BEING STORED ONSITE. THE | | | PLANS SHOW TWO (2) 16,000 GALLON TANKS. THIS FACILITY | | | IS CLASSIFIED AS AN H-4 PER SEC. 307.6 OF 2014 FBC. | | | 2) PROVIDE CALCULATIONS THAT THE CONTAINMENT AREA FOR | | | THE TWO TANKS IS ADEQUATE TO HOLD THE CONTENTS OF BOTH | | | TANKS IN THE EVENT OF A TANK RUPTURE. WPB AMEND. TO FBC | | | SEC. 107.2.1. | | | 3) PLEASE REFER TO 2014 FBCB SEC.414.1.3. FOR REQUIRED | | | INFO ON THE CONSTRUCTION DOCUMENTS. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|