| Date |
Text |
| 2015-07-27 14:32:40 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | PERMIT #15060557 |
| | 7/27/15 |
| | |
| | 1) SHEET M-STD-03 (INCLUSIVE OF ALL PERMIT PLAN SETS |
| | CONTAINING THIS SHEET): REVISE NOTES #10 & 13 |
| | REFERENCING THE CITY OF TALLAHASSEE FIRE HYDRANT |
| | COMPLIANCE INFORMATION. |
| | 2) BASED ON THE SOILS REPORT- PIPE BEDDING AND |
| | DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH |
| | CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND |
| | HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH |
| | DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS |
| | AND THICKNESSES, COMPACTION AND BACKFILLING |
| | SPECIFICATIONS. |
| | 3) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL |
| | UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS |
| | DEPICTING THE UNDERGROUND PIPINGS SPECIFICALLY |
| | SERVICING EACH TANK, FACILITY, BUILDING, ETC. |
| | 4) PROVIDE DIMENSIONED SECTION VIEWS AND DETAILS FOR |
| | THE GUARDRAIL AND LADDER INSTALLATIONS- REFER TO |
| | SECTIONS 304.11 AND 306.5 FBC-10 MECHANICAL. |
| | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FRP |
| | DUCTS REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL |
| | OF RECORD. |
| | 6) PROVIDE WIND LOAD DESIGN CRITERIA, AND ENGINEERED |
| | DETAILS FOR ANCHORING ALL THE EQUIPMENT AND SYSTEMS |
| | EXPOSED TO WIND INCLUDING THE CARBON UNIT AND THE ODOR |
| | CONTROL EXHAUST SYSTEM- SECTION 301.12 FBC-10 |
| | MECHANICAL. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |