| Date |
Text |
| 2016-01-15 09:50:11 | PASSED WITH PROVISOS |
| | |
| | GAS PROVISOS - |
| | GAS PERMIT APPLICATION REQUIREMENTS |
| | |
| | EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL |
| | BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING |
| | IN THE CITY OF WEST PALM BEACH: |
| | |
| | 1.) SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS THE |
| | LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 FBC-FUEL |
| | GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES SEC. |
| | G2413. |
| | |
| | 2.) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING FOR EACH PIPE SIZE. |
| | WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | |
| | 3.) TYPE OF GAS (LP OR NATURAL). |
| | |
| | 4.)TU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| | THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS SECS.401.8 |
| | THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 (37) OR |
| | 2014 FBC-RES. SEC. G2413. |
| | |
| | 5.) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| | (METER OR MP REGULATOR) TO THE MOST REMOTE OUTLET IN |
| | THE BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| | SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| | |
| | 6.) SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE 2014 |
| | FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G |
| | 2407. |
| | |
| | 7.) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. . |
| | |
| | 8.) SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE |
| | AND TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL GAS |
| | SECS. 502 THRU 505. OR 2014 FBC-RES. SEC.G2426. |
| | |
| | 9) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. |
| | |
| | 10.) CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| | TANK(S), TYPE OF TANK ( DOT OR ASME ), THE DISTANCE OF |
| | THE TANK FROM THE EXTERIOR BUILDING WALL AND ADJACENT |
| | PROPERTY LINES, THE DISTANCE OF THE TANK FROM ALL |
| | SOURCES OF IGNITION, OTHER CONTAINERS, BUILDINGS, AND |
| | THE LOCATION OF ANY BUILDING OPENINGS BELOW THE RELIEF |
| | VALVE OF THE TANK PER NFPA 58, TABLE 3-2.2.2. |
| | |
| | 11.) CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS |
| | ABOVE GROUND OR BELOW GROUND, AND SHOW THE METHOD OF |
| | REQUIRED PROTECTION FOR THE LP TANK AND APPURTENANCES |
| | PER NFPA 58. IF THE TANK IS BELOW GROUND IT SHALL BE |
| | ANCHORED PER NFPA 58 SEC.3-2.2.7 (H). IF ABOVE GROUND, |
| | THE TANK SHALL BE SECURELY ANCHORED TO WITHSTAND 170 |
| | MPH ULT WIND LOAD PER THE FLORIDA BUILDING CODE. |
| | |
| | ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE |
| | REFERRED TO THE CHIEF PLUMBING INSPECTOR AT |
| | 561-805-6692. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |