| Date |
Text |
| 2015-11-12 08:28:46 | BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 15060551 M1-M4 SLUDGE PUMPING & |
| | BOILER/ GAS HANDILING BUILDING |
| | ADD: 4395 EASLEY ST. |
| | CONT: TBD/ TO BE DETERMINED |
| | CONTACT: KURT PFEFFER, P. E. |
| | TEL: (561)997-8070 |
| | E-MAIL: [email protected] |
| | |
| | 2010 FLORIDA BUILDING CODE W |
| | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA |
| | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION |
| | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. |
| | |
| | 4TH REVIEW |
| | DATE: THURS. NOV. 12/ 2015 |
| | ACTION: BUILDING PROVISO |
| | |
| | NOTE: SPECIFICATION BOOKS WILL NOT BE REVIEWED AS PART |
| | OF ANY PLAN REVIEW IF SUBMITED THEY GET STAMPED VOID. |
| | |
| | 1-6) COMPLIED. |
| | |
| | |
| | 7) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS, |
| | 1609.6.4.4.1 COMPONENTS & CLADDING FLORIDA DEPARTMENT |
| | OF COMMUNITY AFFAIRS RULE 9N-3 NOV. 01/ 2010 (31) |
| | SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION SYSTEMS THAT |
| | WILL REQUIRE PRODUCT APPROVALS: |
| | (31)(A) EXTERIOR DOORS. |
| | (B) WINDOWS |
| | (C) WALL LOUVERS |
| | (D) ROOFING PRODUCTS AND ASSEMBLIES |
| | |
| | 8) BUILDING PROVISO107.3.4.2 DEFERRED SUBMITTAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN |
| | RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD |
| | THEM TO THE BUILDING OFFICIAL WITH A NOTATION |
| | INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS |
| | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE |
| | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF |
| | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. |
| | |
| | |
| | |
| | EXPOSURE "C" @ 180 MPH, 25 FT ABOVE GRADE |
| | 0365-A-ADF-02 BOILER GAS HANDLING BUILDING |
| | 0382-A-ADF-04 FLOOR PLAN |
| | 0386-A-ADF-08 ROOF PLAN |
| | 0390-A-ADF-12 ELEVATIONS |
| | 0391-A-ADF-13 ELEVATIONS |
| | 0281-S-ADF-15 FOUNDATION |
| | 0284-S-ADF-18 ROOF & PRESSURES |
| | 0287-S-ADF-21 SECTIONS |
| | 0365-A-GEN-02 DOOR SCHEDULE |