| Date |
Text |
| 2015-10-14 08:12:14 | 2ND REVIEW: FBC 2010 MECHANICAL |
| | PERMIT 15060551 |
| | 10/14/15 |
| | |
| | 1) IN RESPONSE TO COMMENT #1 FROM THE 1ST REVIEW, THE |
| | SUBMITTED NARRATIVE STATES THAT THE PROPOSED BUILDING |
| | IS EXEMPT FROM THE FLORIDA ENERGY CODE UNDER FAC RULE |
| | 61G20-1.001. I WAS UNABLE TO FIND ANY LANGUAGE IN THE |
| | RULE SUPPORTING THAT CLAIM. PLEASE SEE SECTION |
| | C101.4.8.4 FBC-14 ENERGY CONSERVATION AND INDICATE |
| | WHICH OF THE 5 EXEMPTIONS LISTED PERTAINS TO THE |
| | PROPOSED BUILDING. |
| | 2) IN RESPONSE TO COMMENT #2 THE NARRATIVE STATES THAT |
| | AIR HANDLER SCHEDULES ARE ON SHEET H0SCD-03, AND |
| | EXHAUST FAN SCHEDULES ON H-SCH-01. I WAS UNABLE TO FIND |
| | THESE SHEETS IN THE UPLOADED PLAN INDEX. PLEASE REVIEW |
| | AND PROVIDE THE PLAN SHEETS. |
| | 3) IN RESPONSE TO COMMENT #3 THE NARRATIVE STATES THAT |
| | THE VENTILATION SYSTEM SEQUENCE OF OPERATION IS IN THE |
| | SPEC BOOK. PLEASE PROVIDE THE REQUESTED SEQUENCE ON THE |
| | PLANS FOR REVIEW AND INSPECTION PURPOSES. |
| | 4) IN RESPONSE TO COMMENT #4 THE NARRATIVE STATES |
| | DETAILS TO BE FOUND ON SHEET 0456-I-ADF-20: THIS PLAN |
| | SHEET NOT UPLOADED. |
| | 5) COMMENT #5: PER NARRATIVE RESPONSE, THE REQUESTED |
| | BOILER VENTING DETAILS ARE DEFERRED PENDING SUBMITTAL |
| | OF SHOP DRAWINGS. |
| | 6) COMMENT #7: THE NARRATIVE STATES THE AIR |
| | DISTRIBUTION SCHEDULE IS ON SHEET H-SCHD-02: THIS PLAN |
| | SHEET NOT UPLOADED. |
| | 7) COMMENT #10: AS PREVIOUSLY REQUESTED PROVIDE A |
| | SYMBOL FOR THE DS DETECTOR IN THE SUPPLY DUCTS SHOWN ON |
| | SHEET H-ADF-02. |
| | 8) COMMENT #12: PER NARRATIVE RESPONSE, THE REQUESTED |
| | WIND LOAD TIE DOWN DETAILS ARE DEFERRED PENDING |
| | SUBMITTAL OF MANUFACTURER'S SHOP DRAWINGS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |