Plan Review Notes
Plan Review Notes For Permit 15060551
Permit Number 15060551
Review Stop P
Sequence Number 1
Notes
Date Text
2015-07-21 14:13:261) SUBMIT A GAS RISER DIAGRAM FOR THE LP TANK &
 PIPNG.INDICATE THE TYPE OF PIPING, THE TOTAL DEVELOPED
 LENGTH OF THE PIPNG FROM THE POINT OF DELIVERY TO THE
 MOST REMOTE OUTLET, THE TOTAL BTU LOAD ON THE SYSTEM,
 AND THE BTU LOAD OF EACH BOILER/APPLIANCE. 2010 FGC
 SEC.402.4.1.
 2) INDICATE IF THE LP TANK IS ABOVEGROUND OR BELOW
 GROUND. WPB AMEND. TO FBC SEC. 107.3.5.1.3.
 3) SHOW THE DISTANCE OF THE LP TANK FROM THE BUILDING.
 COMPLY WITH NFPA 58 FOR SPACING REQUIREMENTS.
 4) SHT. 0386-A-ADF-08 - OVERFLOW SCUPPERS SHALL BE
 PLACED IN WALLS OR PARAPETS NOT LESS THAN 2 INCHES NOR
 MORE THAN 4 INCHES ABOVE THE FINISHED ROOF COVERING AND
 SHALL BE LOCATED AS CLOSE AS PRACTICAL TOTHE REQUIRED
 VERTICAL LEADERS OR DOWNSPOUTS OR WALL AND PARAPET
 SCUPPERS PER FBC SEC.1503.4.2.1.
 5) SHT. 0386-A-ADF-08 REFERS TO SHT. A-ADF-07 FOR ROOF
 DRAIN CALCULATIONS. THIS SHEET IS NOT PART OF THIS PLAN
 PACKAGE. CLARIFY.
 6) SHT.0388-A-ADF-10 IS FOR THE ELECTRICAL BUILDING. IS
 THIS SHEET SUPPOSED TO BE PART OF THIS PLAN PACKAGE?
 7) PLEASE REFER TO THE SPECIFIC YARD PIPING DRAWINGS
 FOR THE CONTINUATION OF THE SANITARY AND WATER LINES.
 SEE SHTS. 0717-P-ADF-01 & 0719-P-ADF-03. WPB AMEND. TO
 FBC SEC. 107.2.1.
 8) SHT. 0717-P-ADF-01 - INDICATE WHAT IS BEING
 DISCHARGED INTO THE FLOOR FLOOR DRAINS. WASTES THAT
 COULD BE HARMFUL TO THE DRAINAGE SYSTEM SHALL BE
 DISCHARGED THROUGH A NEUTRALIZING OR DILUTION MEDIUM
 PER FPC SEC.803.2.
 9) SHT. 0766-M-STD-09 - DETAIL 1542102 - THE WYE SHALL
 BE INSTALLED IN THE DIRECTION OF FLOW PER FPC
 SEC.706.3.
 10) SHT. 0384-A-ADF-06 - THE GRAB BARS SHALL BE
 MEASURED TO THE TOP OF THE GRIPPING SURFACE PER THE FL.
 ACCESSIBILITY CODE SEC. 609.4.
 11) THE LEADING EDGE "HI" UNIT OF THE DRINKING FOUNTAIN
 MAY ONLY PROTRUDE 4 INCHES INTO THE ACCESSIBLE
 CIRCULATION PATH IF THE LEADING EDGE IS MORE THAN 27
 INCHES ABOVE THE FINISH FLOOR. A SKIRT MAY BE NEED ON
 THE UNIT TO PLACE THE LEADING EDGE BELOW 27 INCHES. PER
 THE FL. ACCESSIBILITY CODE SEC. 307.2.
 12 ) INDICATE ON THE PLANS HOW THE ROOF PENETRATION FOR
 THE BOILER VENTS WILL BE SEALED. SHOW THE TYPE OF VENT
 MATERIAL, TOTAL RUN( LENGTH) OF THE VENTS FROM THE
 DRAFT HOOD TO THE TERMINATION CAP.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  