| 2015-07-21 14:13:26 | 1) SUBMIT A GAS RISER DIAGRAM FOR THE LP TANK & |
| | PIPNG.INDICATE THE TYPE OF PIPING, THE TOTAL DEVELOPED |
| | LENGTH OF THE PIPNG FROM THE POINT OF DELIVERY TO THE |
| | MOST REMOTE OUTLET, THE TOTAL BTU LOAD ON THE SYSTEM, |
| | AND THE BTU LOAD OF EACH BOILER/APPLIANCE. 2010 FGC |
| | SEC.402.4.1. |
| | 2) INDICATE IF THE LP TANK IS ABOVEGROUND OR BELOW |
| | GROUND. WPB AMEND. TO FBC SEC. 107.3.5.1.3. |
| | 3) SHOW THE DISTANCE OF THE LP TANK FROM THE BUILDING. |
| | COMPLY WITH NFPA 58 FOR SPACING REQUIREMENTS. |
| | 4) SHT. 0386-A-ADF-08 - OVERFLOW SCUPPERS SHALL BE |
| | PLACED IN WALLS OR PARAPETS NOT LESS THAN 2 INCHES NOR |
| | MORE THAN 4 INCHES ABOVE THE FINISHED ROOF COVERING AND |
| | SHALL BE LOCATED AS CLOSE AS PRACTICAL TOTHE REQUIRED |
| | VERTICAL LEADERS OR DOWNSPOUTS OR WALL AND PARAPET |
| | SCUPPERS PER FBC SEC.1503.4.2.1. |
| | 5) SHT. 0386-A-ADF-08 REFERS TO SHT. A-ADF-07 FOR ROOF |
| | DRAIN CALCULATIONS. THIS SHEET IS NOT PART OF THIS PLAN |
| | PACKAGE. CLARIFY. |
| | 6) SHT.0388-A-ADF-10 IS FOR THE ELECTRICAL BUILDING. IS |
| | THIS SHEET SUPPOSED TO BE PART OF THIS PLAN PACKAGE? |
| | 7) PLEASE REFER TO THE SPECIFIC YARD PIPING DRAWINGS |
| | FOR THE CONTINUATION OF THE SANITARY AND WATER LINES. |
| | SEE SHTS. 0717-P-ADF-01 & 0719-P-ADF-03. WPB AMEND. TO |
| | FBC SEC. 107.2.1. |
| | 8) SHT. 0717-P-ADF-01 - INDICATE WHAT IS BEING |
| | DISCHARGED INTO THE FLOOR FLOOR DRAINS. WASTES THAT |
| | COULD BE HARMFUL TO THE DRAINAGE SYSTEM SHALL BE |
| | DISCHARGED THROUGH A NEUTRALIZING OR DILUTION MEDIUM |
| | PER FPC SEC.803.2. |
| | 9) SHT. 0766-M-STD-09 - DETAIL 1542102 - THE WYE SHALL |
| | BE INSTALLED IN THE DIRECTION OF FLOW PER FPC |
| | SEC.706.3. |
| | 10) SHT. 0384-A-ADF-06 - THE GRAB BARS SHALL BE |
| | MEASURED TO THE TOP OF THE GRIPPING SURFACE PER THE FL. |
| | ACCESSIBILITY CODE SEC. 609.4. |
| | 11) THE LEADING EDGE "HI" UNIT OF THE DRINKING FOUNTAIN |
| | MAY ONLY PROTRUDE 4 INCHES INTO THE ACCESSIBLE |
| | CIRCULATION PATH IF THE LEADING EDGE IS MORE THAN 27 |
| | INCHES ABOVE THE FINISH FLOOR. A SKIRT MAY BE NEED ON |
| | THE UNIT TO PLACE THE LEADING EDGE BELOW 27 INCHES. PER |
| | THE FL. ACCESSIBILITY CODE SEC. 307.2. |
| | 12 ) INDICATE ON THE PLANS HOW THE ROOF PENETRATION FOR |
| | THE BOILER VENTS WILL BE SEALED. SHOW THE TYPE OF VENT |
| | MATERIAL, TOTAL RUN( LENGTH) OF THE VENTS FROM THE |
| | DRAFT HOOD TO THE TERMINATION CAP. |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |