| Date |
Text |
| 2015-07-15 07:22:23 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | PERMIT #15060551 M1-M4 SLUDGE PUMPING & BOILER/GAS |
| | HANDLING BUILDING |
| | 7/15/15 |
| | |
| | 1) SUBMIT THE FOLLOWING ENERGY EFFICIENCY COMPLIANCE |
| | DOCUMENTS PREPARED BY THE ENGINEER OF RECORD: A) |
| | COOLING AND HEATING CALCULATIONS FOR AHU'S 1, 2, 3, & 4 |
| | IN ACCORDANCE WITH ACCA MANUAL N OR APPROVED ALTERNATE |
| | METHOD- SECTION 503.2.1 FBC-10 ENERGY CONSERVATION . B) |
| | ENERGY EFFICIENCY FORM 502-2010 OR 506-2010- REFERENCE |
| | SECTIONS 101.3, 103, AND CHAPTER 5 FBC-10 ENERGY |
| | CONSERVATION. THE DESIGN PROFESSIONAL SHALL CHOOSE |
| | EITHER THE PRESCRIPTIVE (502) OR PERFORMANCE BASED |
| | (506) COMPLIANCE PATH FOR THE BUILDING AND BUILDING |
| | SYSTEMS INCLUDING BUT NOT LIMITED TO THE COMPONENTS OF |
| | THE THERMAL ENVELOPE, THE HVAC AND CHILLER EQUIPMENT, |
| | THE HYDRONIC PIPING, AND THE ELECTRICAL POWER, |
| | LIGHTING, AND CONTROLS. |
| | 2) PROVIDE EQUIPMENT SCHEDULES ON THE PLANS FOR THE |
| | AHU'S, THE CHILLERS, THE EXHAUST FANS, THE BOILERS AND |
| | VENT SYSTEM, THE PUMPS, AND THE HEAT EXCHANGERS. |
| | 3) PROVIDE A SEQUENCE OF OPERATION FOR THE VENTILATION |
| | SYSTEM TO CLARIFY HOW THE SYSTEM WILL FUNCTION- |
| | THERMOSTATICALLY, CONTINUOUSLY? |
| | 4) PROVIDE AN EQUIPMENT SCHEDULE FOR THE GAS DETECTOR, |
| | AND A NARRATIVE DESCRIPTION AND DIAGRAM ON THE PLAN |
| | DETAILING THE SEQUENCE OF OPERATION. |
| | 5) PROVIDE BOILER VENTING DETAILS INDICATING COMPLIANCE |
| | WITH CHAPTER 5 FBC-10 FUEL GAS. PROVIDE DIMENSIONED |
| | SECTION VIEWS THAT A) INDICATE THE TYPE OF VENT PIPING |
| | AND HOW THEY WERE SIZED. B) SHOW THE TOTAL RUN LENGTH |
| | FROM THE BOILER TO TERMINATION CAP. C) INDICATE HOW THE |
| | PIPING ARE BEING SUPPORTED ABOVE AND BELOW THE ROOF- |
| | WHAT TYPES AND SIZES OF STRAPPING, CABLING, AND ANCHORS |
| | ETC. ARE TO BE USED. D) SHOW HOW THE ROOF PENETRATION |
| | IS TO BE SEALED, CURBING, AND ROOF PATCHING DETAILS. |
| | 6) SHEET H-ADF-1, NOTE #4: COMBUSTION AIR FOR THE |
| | BOILER USING THE ONE-OPENING METHOD SHALL BE CALCULATED |
| | IN ACCORDANCE WITH SECTION 304.6.2 FBC-10 FUEL GAS. |
| | REVISE THE NOTE INDICATING COMPLIANCE WITH THE |
| | INTERNATIONAL 2009 CODE. PER THE NOTE, 128 SQ. FT. OF |
| | LOUVER AREA HAS BEEN PROVIDED, HOWEVER PLAN SHEET |
| | H-ADF-2 SHOWS AN 96"X96" LOUVER WHICH WOULD NOT YIELD |
| | THE REQUIRED AMOUNT OF FREE AIR: PLEASE CORRECT. |
| | 7) PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE PLAN |
| | LISTING MAKES AND MODELS AND SIZES OF ALL COMPONENTS |
| | INCLUDING DUCTS, DIFFUSERS, AND RETURN GRILLS. |
| | 8) PROVIDE TYPICAL DUCT HANGING AND CONNECTION DETAILS |
| | IN ACCORDANCE WITH THE SMACNA 2005 STANDARD. |
| | 9) PROVIDE TESTED AND APPROVED FIRE STOPPING SYSTEM |
| | DETAILS FOR ALL PIPES OR DUCTS PENETRATING FIRE-RATED |
| | WALLS. |
| | 10) H-ADF-02: DUCT SMOKE DETECTORS ARE REQUIRED IN THE |
| | SUPPLY DUCTS OF BOTH AHU- 1 & 2: PLEASE PROVIDE A |
| | SYMBOL ON THE PLAN TO SHOW THEIR LOCATIONS AND PROVIDE |
| | AN INSTALLATION DETAIL ON THE PLAN- SECTION 606.2.1 |
| | FBC-10 MECHANICAL. PROVIDE INSTALLATION DETAILS FOR THE |
| | DEVICES, AND HOW THEY WILL BE SUPERVISED PER SECTION |
| | 606.4.1. |
| | 11) H-ADF-4: REFERENCE COMMENT #9 ABOVE AND APPLY TO |
| | AHU-3 & 4. |
| | 12) H-ADF-3 & H-ADF-5: ENGINEERED WIND LOAD TIE-DOWN |
| | DETAILS FOR MOUNTING THE AHU'S AND CURBS, AND THE |
| | EXHAUST FANS AND CURBS ON THE ROOF ARE REQUIRED PER |
| | SECTION 301.12. PLEASE PROVIDE DETAILS, OR PLACE A NOTE |
| | INDICATING ON WHICH STRUCTURAL OR ARCHITECTURAL SHEET |
| | THE DETAILS ARE LOCATED. PROVIDE ELEVATION AND PLAN |
| | VIEW DRAWINGS INDICATING THE STRUCTURAL COMPONENTS OF |
| | THE CURBS, AND SHOW THE CURB HEIGHTS ABOVE THE FINISHED |
| | ROOF. |
| | 13) PROVIDE SECTION VIEWS OF THE ROOF LADDERS TO |
| | INDICATE COMPLIANCE WITH THE DESIGN CRITERIA LISTED IN |
| | SECTION 306.5 FBC-10 MECHANICAL. |
| | 14) PROVIDE WIND LOAD DESIGN CRITERIA, AND ENGINEERED |
| | TIE DOWN DETAILS FOR INSTALLATION OF THE CHILLERS AND |
| | PROPANE TANK- SECTION 301.12 FBC-10 MECHANICAL. |
| | 15) CHILLERS: A) PROVIDE SYSTEM SIZING CALCULATIONS. B) |
| | PROVIDE THE EFFICIENCY RATINGS OF THE EQUIPMENT PER |
| | TABLE 503.2.3(7) FBC-10 ENERGY EFFICIENCY. C) PROVIDE |
| | AN ENLARGED DIAGRAM OF THE CHILLERS AND PIPING SYSTEMS |
| | INDICATING THE TYPES AND SIZES OF PIPING, PIPING |
| | INSULATIONS, UNDERGROUND PIPING PROTECTIONS, ETC. |
| | 16) PROVIDE A GAS PIPING ISOMETRIC AND LAYOUT PLAN FOR |
| | THE PROPANE SYSTEM- REFERENCE CHAPTER 4 FBC-10 FUEL |
| | GAS. |
| | 17) BASED ON THE SOILS REPORT- PIPE BEDDING AND |
| | DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH |
| | CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND |
| | HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH |
| | DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS |
| | AND THICKNESSES, COMPACTION AND BACKFILLING |
| | SPECIFICATIONS. |
| | 20) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL |
| | UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS |
| | DEPICTING THE UNDERGROUND PIPES SERVICING EACH TANK, |
| | FACILITY, OR BUILDING. |
| | 21) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES A) |
| | FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE NOA'S FOR |
| | ALL PRODUCTS REGULATED BY FAC RULE 9N-3 REVIEWED AND |
| | APPROVED IN WRITING BY THE DESIGN PROFESSIONAL OF |
| | RECORD (HVAC ROOF CURBS, EXHAUST FANS AND CURBS, |
| | EXHAUST AND INTAKE LOUVERS, ETC.). B) MANUFACTURER'S |
| | PRODUCT DATA SHEETS FOR THE AHU'S, ROOF MOUNTED EXHAUST |
| | FANS, THE CHILLERS, ELECTRONIC CONTROLS, PROCESS |
| | PIPINGS, AND PIPING INSULATION ETC. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |