2015-07-27 09:32:221ST REVIEW: FBC 2010 MECHANICAL
 PERMIT #15060530
 7/27/15
  
 1) HVAC PLANS FOR THE ELECTRICAL BUILDING SHALL BE
 SUBMITTED FOR REVIEW. SHEET E-WAS-05 SHOWS NEW AC-1 &
 AC-2.
 2) SUBMIT THE FOLLOWING ENERGY EFFICIENCY COMPLIANCE
 DOCUMENTS PREPARED BY THE ENGINEER OF RECORD: A)
 COOLING AND HEATING CALCULATIONS FOR AC-1 & AC-2 IN
 ACCORDANCE WITH ACCA MANUAL N OR APPROVED ALTERNATE
 METHOD- SECTION 503.2.1 FBC-10 ENERGY CONSERVATION . B)
 ENERGY EFFICIENCY FORM 502-2010 OR 506-2010- REFERENCE
 SECTION 101.3, 103, AND CHAPTER 5 FBC-10 ENERGY
 CONSERVATION. THE DESIGN PROFESSIONAL SHALL CHOOSE
 EITHER THE PRESCRIPTIVE (502) OR PERFORMANCE BASED
 (506) COMPLIANCE PATH FOR THE BUILDING AND BUILDING
 SYSTEMS INCLUDING BUT NOT LIMITED TO THE COMPONENTS OF
 THE THERMAL ENVELOPE, THE HVAC EQUIPMENT, THE HYDRONIC
 PIPING, AND THE ELECTRICAL POWER, LIGHTING, AND
 CONTROLS.
 3) PROVIDE EQUIPMENT SCHEDULES ON THE PLAN FOR AC-1 &
 AC-2.
 4) PROVIDE INSTALLATION DETAILS FROR THE AIR HANDLERS
 INDICATING EITHER VERTICAL OR HORIZONTAL MPOUNTING,
 MEANS OF SUPPORT, WORKING CLEARANCES, AND REFRIGERANT
 AND CONDENSATE PIPING RUNS AND DETAILS.
 5) DUCT SMOKE DETECTORS MAY BE REQUIRED IN THE SUPPLY
 DUCTS OF BOTH AC-1 & 2 IF THE SYSTEMS CAN EACH PRODUCE
 OVER 2000 CFM'S OF SUPPLY AIR- SECTION 606.2.1. IF
 APPLICABLE, PLEASE PROVIDE A SYMBOL ON THE PLAN TO SHOW
 THEIR LOCATIONS, PROVIDE INSTALLATION DETAILS, AND
 INDICATE HOW THE DEVICES WILL BE SUPERVISED PER SECTION
 606.4.1.
 6) PROVIDE AN AIR DISTRIBUTION SCHEDULE ON THE PLAN
 LISTING MAKES AND MODELS AND SIZES OF ALL COMPONENTS
 INCLUDING DUCTS, DIFFUSERS, AND RETURN GRILL
 7) PROVIDE TESTED AND APPROVED FIRE STOPPING SYSTEM
 DETAILS FOR ALL PIPES OR DUCTS PENETRATING FIRE-RATED
 WALLS.
 8) PROVIDE WIND LOAD DESIGN CRITERIA AND ENGINEERED
 STRUCTURAL DETAILS FOR INSTALLATION OF THE AC CONDENSER
 PADS, AND ANCHORING OF THE CONDENSERS TO THE PADS-
 SECTION 301.12.
 9) PROVIDE EQUIPMENT SCHEDULES ON THE PLAN FOR BLOWER
 #1 & #2. INDICATE HOW THE BLOWERS WERE SIZED- SHOW
 CALCULATIONS IF APPLICABLE.
 10) PROVIDE DETAILS FOR VENTILATION OF THE BLOWER ROOM
 INCLUDING A) EXHAUST VENTILATION CALCULATIONS- SECTION
 403. A) EXHAUST FAN SCHEDULE B) LOUVER DIMENSIONS AND
 LOUVER SIZING CALCULATIONS.
 11) PROVIDE ENGINEERED TIE DOWN DETAILS FOR
 INSTALLATION OF THE ROOF FAN- SECTION 301.12.
 12) PROVIDE A SUBMITTAL PACKAGE THAT INCLUDES A)
 FLORIDA PRODUCT APPROVALS AND/OR MIAMI DADE NOA'S FOR
 ALL PRODUCTS REGULATED BY FAC RULE 9N-3 REVIEWED AND
 APPROVED IN WRITING BY THE DESIGN PROFESSIONAL OF
 RECORD ( EXHAUST FANS AND CURBS, EXHAUST AND INTAKE
 LOUVERS, ETC.). B) MANUFACTURER'S PRODUCT DATA SHEETS
 FOR THE AC-1 & 2, THE ROOF EXHAUST FAN, DUCT SMOKE
 DETECTORS, O/A MOTORIZED DAMPERS, ELECTRONIC CONTROLS,
 PIPING AND FITTINGS,AND PIPE INSULATION ETC.
 13) BASED ON THE SOILS REPORT- PIPE BEDDING AND
 DEWATERING GUIDELINES, PLEASE PROVIDE PIPE TRENCH
 CROSS-SECTION DETAILS FOR TYPICAL INSTALLATIONS AND
 HIGH WATER TABLE INSTALLATIONS. INDICATE TRENCH
 DIMENSIONS, PIPE EMBEDMENT DEPTHS, BEDDING MATERIALS
 AND THICKNESSES, COMPACTION AND BACKFILLING
 SPECIFICATIONS.
 14) PROVIDE CIVIL DRAWINGS THAT INCLUDE OVERALL
 UNDERGROUND PIPING LAYOUTS, AND ENLARGED AREA DRAWINGS
 DEPICTING THE UNDERGROUND PIPES SERVICING EACH TANK,
 FACILITY, OR BUILDING.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved