| Date |
Text |
| 2015-06-20 08:19:03 | 1) THE GAS SIZING TABLE FOR THE GASTITE PE PIPE THAT |
| | HAS BEEN IDENTIFIED ON THE DOCUMENTS IS SHOWN AS A GAS |
| | PRESSURE OF 10 PSI, YET THE FIRST PAGE OF THE GAS |
| | DRAWING NOTES AN 11" W.C. CLARIFY. WPB AMEND. TO 2010 |
| | FBC SEC. 107.3.5.1.5. |
| | 2) INDICATE THE PSI ON THE SYSTEM BETWEEN THE TANK AND |
| | THE 2ND STAGE REGULATOR AND FROM THE 2ND STAGE |
| | REGULATOR TO THE GENERATOR. THE ONLY PRESSURE INDICATED |
| | ON THE PLANS IS 11" W.C. CLARIFY. |
| | 3)THE TWO TABLES REFERENCED ON THE GAS RISER DRAWING |
| | ARE FOR NATURAL GAS. SUBMIT THE CORRECT TABLES FOR THE |
| | LP GAS AND THE PRESSURES. |
| | 4) THE DOCUMENTS FROM TIE-DOWN ENGINEERING SHALL BEAR |
| | THE SEAL AND WET SIGNATURE OF THE ENGINEER PER THE FL. |
| | ADMIN. CODE SEC. 61G15-23.002. THE SUBMITTED DOCUMENTS |
| | ARE COPIES. |
| | 5) THIS AN ABOVE GROUND TANK AND YOU HAVE ALSO |
| | SUBMITTED SPECS FOR AN UNDERGROUND TANK. REMOVE ANY |
| | DOCUMENTS THAT DO NOT APPLY. WPB AMEND. TO 2010 FBC |
| | SEC. 107.2.1. |
| | 6) THE TANK IS LOCATED IN A TRAFFIC AREA. SUBMIT |
| | DETAILS AS TO HOW THE TANK IS GOING TO BE PROTECTED IN |
| | ACCORDANCE WITH NFPA 58 SEC.6.6.6 (D). IF BOLLARDS ARE |
| | USED SUBMIT DETAILS. SHOW THE HEIGHT OF THE BOOLARDS |
| | ABOVE GROUND, THE BURIAL DEPTH BELOW GROUND, THE |
| | DIAMETER, CENTER TO CENTER SPACING, ETC.NFPA 58 SEC. |
| | 6.6.1.2. |
| | 7) THE NOTES WRITTEN ON THE SURVEY ARE DONE IN PECIL. |
| | PENCILED PLANS ARE UNACCEPTABLE.SUBMIT TWO COPIES OF |
| | PLANS THAT CANNOT BE ALTERED. |
| | 8) INDICATE THE CORRESPONDING EHD OF THE FLEX LINE FROM |
| | THE 2ND STAGE REGULATOR TO THE GENERATOR. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |