Date Text
2015-07-10 13:36:211) THE WOMEN'S RESTROOM SHALL HAVE THE SAME NUMBER OF
 WATER CLOSETS AS THE COMBINED TOTAL OF WATER CLOSETS
 AND URINALS FOR THE MEN. 2010 FBC-PLUMBING, SEC.403.1.3
 (EXCEPTION).
 2) RESTROOM #114 SHALL BE HANDICAP ACCESSIBLE PER 2010
 FBC-ACCESSIBILITY, SEC.213.2.
 3) INDICATE ON THE FLOOR PLAN WHICH URINAL IS FOR
 HANDICAP ACCESS. COMPLY W/2010 FAC SECS.213.3.3 & SEC.
 605.
 4) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT. SPECS SHALL SHOW THAT THE EQUIPMENT IS
 LISTED AND LABELED PER 201 FUEL GAS CODE SEC.301.3.
 5) SHT. A-3 IS ILLEGIBLE. SUBMIT A NEW SHEET THAT IS
 CLEAR IN DETAIL.WPB AMEND. TO 2010 FBC SEC. 107.2.1.
 6) SHT. P-1 - THE GREASE SIZING CALCULATION TABLE
 REFERS TO TABLE 709.1 OF THE FL. PLUMBING CODE. THIS
 TABLE IS NOT TO BE USED FOR SIZING A GREASE
 INTERCEPTOR. REFER TO THE 2010 FPC SEC. 1003.3.4 OR
 TABLE 1003.5.1. THERE IS A NOTE UNDER THE GREASE SIZING
 TABLE THAT IS ON THE PLANS THAT REFERS TO A 4" SANITARY
 BUILDING DRAIN. DELETE THIS NOTE AS IT HAS NO RELEVANCE
 TO THE GREASE WASTE LINE OR CHANGE IT TO READ "GREASE
 BUILDING DRAIN PIPE=4".
 7) THE GRAVITY GREASE INTERCEPTOR SHALL COMPLY WITH THE
 LATEST VERSION OF THE CITY OF WEST PALM BEACH
 ENGINEERING DEPT. DETAIL AND FL. ADMIN. CODE RULE 64E-6
 . CONTACT KELLY CRANFORD AT 561-835-7243.
 8) SHT.P-2 - SIZE ALL SECTIONS OF THE VENTS ON THE
 SANITARY RISER .WPB AMEND. TO 2010 FBC SEC. 107.2.1.
 9) THE BTU LOAD OF THE GAS APPLIANCES SHOWN ON THE
 KITCHEN EQUIPMENT SCHEDULE ON A-3.0 DOES NOT MATCH THE
 BTU LOAD SHOWN ON THE GAS RISER ON SHT.P-2. CLARIFY.
 10) A 96,000 BTU GAS FIRED TILT SKILLET IS SHOWN ON THE
 EQUIPMENT SCHEDULE ON A-3.0 BUT NOT ON THE GAS RISER.
 CLARIFY.
 11) THE TOTAL BTU LOAD FOR THE LOW PRESSURE COOKLINE IS
 CALCULATED AS 771,500 BTU'S. SHOW THE TOTAL DEVELOPED
 LENGTH DISTANCE FROM THE LOW PRESSURE REGULATOR TO THE
 FURTHEST OUTLET ON THE COOKLINE ( FRYER ). SIZE THIS
 SECTION OF PIPING IN ACCORDANCE WITH TABLE 402.4 (2)..
 12) SEDIMENT TRAPS SHALL BE INSTALLED AT EACH APPLIANCE
 AND SHALL BE INSTALLED DOWNSTREAM OF THE APPLIANCE
 SHUTOFF VALVE AS CLOSE TO THE INLET OF THE APPLIANCE AS
 PRACTICAL. 2010 FGC SEC.408.4.
 13) MY CALCULATIONS FOR THE TOTAL BTU LOAD ON THE
 SYSTEM IS 1,014,500 BTU'S. PLEASE RECHECK YOUR
 CALCULATIONS FOR THE THE TOTAL BTU LOAD AND REVISE THE
 LOAD ON THE PLANS.
 14) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE GAS
 APPLIANCES PER 2010 FBC-FUEL GAS, SEC.304.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved