| 2015-08-28 14:03:41 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR ALL GAS |
| | EQUIPMENT. ALL EQUIPMENT SHALL BE LISTED AND LABELED |
| | PER THE 2010 FBC-FUEL GAS SEC.301.3. 2ND REQUEST. |
| | 2) SUBMIT TWO COPIES OF MANUF. INSTALLATION |
| | INSTRUCTIONS FOR THE CONCENTRIC VENT FOR GWH-2. WPB |
| | AMEND. TO FBC SEC. 107.2.1. |
| | 3) SUBMIT FACTORY SIZING CALCULATIONS DONE BY SCHIER |
| | FOR THE GREASE TRAPS PER THE 2010 FBC-PLUMBING |
| | SEC.1003.2.CONTACT LEE SCHNEEWEISS AT 1-800-538-4792. |
| | 2ND REQUEST. |
| | 4) THE BRANCH VENT CONNECTING THE VENTS FROM THE MEN'S |
| | AND WOMEN'S RESTROOM EXCEEDS 40 FT. IN DEVELOPED LENGTH |
| | AND SHALL BE INCREASED ONE PIPE SIZE FOR IT'S ENTIRE |
| | LENGTH PER FBC-PLUMBING SEC.916.4.1. |
| | (NOTE: THE PREVIOUS COMMENT HAD A TYPO ERROR. IT READ |
| | "OR IT'S ENTIRE LENGTH" WHEN IT SHOULD HAVE READ "FOR |
| | IT'S ENTIRE LENGTH." ) |
| | 5) SHT.P0.1 - THE TOTAL FLOW- THRU FOR THE INTERCEPTORS |
| | IS SHOWN AS 85 GPM BUT THE TOTAL GPM IS SHOWN AS |
| | 95.08.PLEASE CLARIFY THE DIFFERENCE WITH THESE TWO |
| | NUMBERS. I WOULD THINK THEY SHOULD BE THE SAME. |
| | 6) SHT. P3.1 - MY TABULATION OF THE SECTIONS OF GAS |
| | PIPE FOR THE DEVELOPED LENGTH IS 143 FT. THE GAS |
| | INFORMATION BOX NOTES 125 FT.THE PIPING IS SIZED |
| | CORRECTLY IN ITS ENTIRETY.PLEASE CHECK YOUR TABULATION |
| | AND MAKE ANY NECESSARY CORRECTION TO THE INFFORMATION. |
| | 7) SUBMIT COMBUSTION AIR CALCULATIONS FOR BOTH OF THE |
| | WATER HEATERS AND KITCHEN EQUIPMENT PER THE 2010 FBC- |
| | FUEL GAS CODE SEC.304. NOTE #18 ON SHT.M1.1 REFERS TO |
| | SEC.306.6.2 OF 2010 FGC. THERE IS NO SUCH CODE SECTION. |
| | REFER TO 2010 FGC SEC.304.6.2 FOR COMBUSTION AIR FOR |
| | THE WATER HEATERS. PER SEC.304.10, THE NET FREE AREA OF |
| | METAL LOUVERS IS ASSUMED TO BE 75%, |
| | 8) PER 2010 FBC TABLE 403.1 FOOTNOTE G, A UNISEX TOILET |
| | ROOM SHALL BE PROVIDED. THE ROUTE TO PUBLIC TOILET |
| | FACILITIES SHALL NOT PASS THROUGH KITCHENS, STORAGE |
| | ROOMS OR CLOSETS PER 2010 FBC-PLUMBING SEC.403.3.1. |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |