2015-06-23 09:35:111) THIS FACILITY SHALL COMPLY WITH THE EXCEPTION LISTED
 IN THE 2010 FBC-PLUMBING, SEC.403.1.3 - 403.1.3 POTTY
 PARITY.
 IN ASSEMBLY OCCUPANCIES, RESTROOMS WHICH ARE OPEN TO
 THE PUBLIC MUST HAVE A RATIO OF 3:2 WATER CLOSETS
 PROVIDED FOR WOMEN AS THE COMBINED TOTAL OF WATER
 CLOSETS AND URINALS PROVIDED FOR MEN, UNLESS THERE ARE
 TWO OR FEWER SUCH FIXTURES FOR MEN, IN ACCORDANCE WITH
 SECTION 553.86, FLORIDA STATUTES.
 EXCEPTION: THIS SECTION DOES NOT APPLY TO
 ESTABLISHMENTS LICENSED UNDER CHAPTER 509, FLORIDA
 STATUTES, IF THE ESTABLISHMENT DOES NOT PROVIDE MEETING
 OR BANQUET ROOMS WHICH ACCOMMODATE MORE THAN 150
 PEOPLE, AND THE ESTABLISHMENT HAS AT LEAST THE SAME
 NUMBER OF WATER CLOSETS FOR WOMEN AS THE COMBINED TOTAL
 OF WATER CLOSETS AND URINALS FOR MEN.
 2) SHT. A1.01 - SHOW THE CLEAR INSIDE DIMENSIONS OF THE
 EMPLOYEE RESTROOM #115. (L X W) . WPB AMEND. TO 2010
 FBC SEC. 107.2.1.
 3) SHT. A1.02 - PLEASE LABEL THE EMPLOYEE RESTROOM AS
 "UNISEX" IN LIEU OF "BOTH". THE TERM "BOTH" IS NOT CODE
 LANGUAGE.
 4) SHT. A2.01 -ELEVATION DETAIL #8 & 15 - THE GRAB BARS
 SHALL BE MEASURED TO THE TOP OF THE GRIPPING SURFACE
 FROM THE FINISH FLOOR, NOT TO THE CENTERLINE AS SHOWN.
 2010 FBC- ACCESSIBILITY, SEC. 609.4.
 5) SHT. A2.01 - SHOW THE REQUIRED KNEE AND TOE
 CLEARANCES FOR THE LAVATORIES. COMPLY WITH THE FAC
 SEC.306.
 6) SHT.P.0 - GENERAL PLUMBING NOTES #38 - AIR SHALL NOT
 BE USED TO TEST PLASTIC PIPE PER 2010 FPC SEC.312.1.
 7) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT. ALL EQUIPMENT SHALL BE LISTED AND
 LABELED PER THE FUEL GAS CODE SEC. 301.3.
 8) SUBMIT DETAILS FOR THE VENT FOR GWH-2. THE VENT
 SHALL COMPLY W/2010 FUEL GAS CODE SEC. 502.THE NOTE ON
 P0.1 REFERS TO MECHANICAL PLANS FOR LAYOUT. THERE IS NO
 LAYOUT ON THE MECHANICAL PLANS. CLARIFY.
 9) THE GREASE TRAP CALCULATIONS SHALL BE REVIEWED BY
 SHIER TO ENSURE CORRECT SIZING OF THE INTERCEPTORS PER
 2010 FPC SEC.1003.2.CONTACT LEE SCHNEEWEISS AT
 1-800-538-4792.
 10) SHT. P0.1 - MIXING VALVE DETAIL - INDICATE THE SIZE
 OF THE COLD WATER SUPPLY.
 11) SHT. P1.2 - THE PLUMBING DRAWINGS SHALL BE SIGNED
 AND SEALED BY THE DESIGN PROFESSIONAL OF RECORD PER THE
 FL. ADMIN. CODE. RULE 61G15-23.002.
 12) INDICATE THE PSI OF THE GAS SYSTEM ON SHT.P3.1.
 13) SHT.P3.2 - THE HANDICAP WATER CLOSET IN THE WOMEN'S
 RESTROOM SHALL BE INDIVIDUALLY VENTED OR THE SYSTEM
 SHALL BE DESIGNED AS A CIRCUIT VENT SYSTEM IN
 ACCORDANCE PER 2010 FPC SEC. 911.
 14) IT APPEARS THAT THE BRANCH VENT CONNECTING THE
 VENTS FROM THE MEN'S & WOMEN'S RESTROOM EXCEEDS 40 FT.
 IN DEVELOPED LENGTH AND SHALL BE INCREASED ONE PIPE
 SIZE PER FPC SEC. 916.4.1 FOR IT'S ENTIRE LENGTH.
 15) SUBMIT A RISER DETAIL FOR ALL THE CONDENSATE
 PIPING. THE MECHANICAL PLANS APPEAR TO SHOW ALL NEW
 RTU'S & SHT. P2.1.ONLY SHOWS RTU 5 AS BEING NEW.
 CLARIFY.
 16) SHOW ALL THE GREASE TRAPS AND PIPE SIZING ON THE
 SANITARY RISER. WPB AMEND. TO 2010 FBC SEC.
 107.3.5.1.3.
 17) SHT. P0.1 - THERE ARE CALCULATIONS FOR THE GREASE
 INTERCEPTORS BASED ON THE PDI G101 STANDARD AND ALSO ON
 THE FL. ADMIN. CODE RULE 64E-6. THE F.A.C. 64E-6 IS FOR
 GRAVITY TYPE INTERCEPTORS AND THE PDI G101 IS FOR THE
 HYDROMECHANICAL TANKS WHICH ARE ON THE PLANS. YOU
 CANNOT USE BOTH.CLARIFY.
 18) SHT. P0.1 - CHECK YOUR FLOW THROUGH CALCULATIONS. I
 CALCULATE 95.08 GPM.
 19) SHT. P0.1 - IN THE FLOW THROUGH (GPM) CALCULATIONS,
 THE TOTAL GPM HAS BEEN MULTIPLIED BY 24. WHERE IS THIS
 NUMBER FROM? CLARIFY.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  