| Date |
Text |
| 2015-08-13 14:38:44 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC-R314.3.1 ALTERATIONS, REPAIRS AND ADDITIONS. |
| | WHEN ALTERATIONS, REPAIRS OR ADDITIONS REQUIRING A |
| | PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING ROOMS ARE |
| | ADDED OR CREATED IN EXISTING DWELLINGS, THE INDIVIDUAL |
| | DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE ALARMS |
| | LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| | |
| | 2) SUBMIT ENERGY CALCULATIONS AS REQUIRED BY FBC ENERGY |
| | CONSERVATION SECTION 401.2. |
| | |
| | 3) PROVIDE A FRAMING DETAIL FOR THE EXTERIOR IN-FILL |
| | WALLS THAT SHOWS THE FRAMING CONNECTORS / STRAPS AND |
| | THE WINDOW OPENING FRAMING. FBC 107.2.1 AND FBC-R601.2 |
| | |
| | 4) FBC 107.3.5.3 - PROVIDE COMPONENT AND CLADDING |
| | DESIGN PRESSURES PURSUANT TO FBC-R301.2 FOR THE SINGLE |
| | HUNG WINDOWS IN THE NEW SITTING ROOM. |
| | |
| | 5) SPECIFY THE CEILING INSULATION TYPE AND R-VALUE ON |
| | THE PLANS FOR THE NEW SITTING ROOM. FBC ENERGY |
| | CONSERVATION 401.2 |
| | |
| | 6) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| | FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 |
| | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT |
| | APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION |
| | INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE NEW |
| | WINDOW SINGLE HUNG WINDOWS. |
| | |
| | 7) SHOW COMPLIANCE WITH FBC-R 301.2.1.2 FOR LARGE |
| | MISSILE IMPACT PROTECTION AT THE NEW WINDOWS. |
| | |
| | 8) IF THE NEW WINDOWS ARE NOT RATED FOR LARGE MISSILE |
| | IMPACT, THEN FBC - R 301.2.1.2 SUBMIT TWO COPIES OF AN |
| | INSTALLATION SCHEDULE AND KEY PLAN FOR THE STORM |
| | PANELS. SPECIFY THE OPENING SIZE, THE WIND PRESSURES, |
| | TYPE OF ANCHOR, ANCHOR SPACING, EDGE DISTANCE, PANEL |
| | LENGTH, PANEL SPAN, SEPARATION DISTANCE FROM PANEL TO |
| | GLASS AND THE APPLICABLE SECTION NUMBER FROM THE |
| | INSTALLATION DRAWINGS. I HAVE INCLUDED A LINK TO THE |
| | CONSTRUCTION SERVICES DEPARTMENT SITE THAT HAS MANY OF |
| | THE RELATED FORMS INCLUDING |
| | THE SCHEDULE FOR INSTALLATION OF OPENING PROTECTIVE |
| | DEVICES. |
| | HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/ |
| | |
| | 9) THE VALUE OF $10,000.00 ON THE APPLICATION FOR THE |
| | SCOPE OF WORK SHOWN ON THE PLANS APPEARS TO |
| | UNDERVALUED. SUBMIT A COPY OF THE SIGNED CONTRACT. FBC |
| | 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | |