Plan Review Notes
Plan Review Notes For Permit 15051082
Permit Number 15051082
Review Stop G
Sequence Number 1
Notes
Date Text
2015-05-29 07:04:171) INDICATE ON THE APPLICATION IF THE LP TANK IS
 COVERED UNDER THIS PERMIT. THE APPLICATION ONLY STATES
 "1000 AG DISPENSER."
 2) THE SITE PLAN SHOWS A FENCED IN AREA. IS THIS AREA
 RELATED TO THE DISPENSING OF THE LP GAS OR RELATED
 EQUIPMENT? CLARIFY.
 3) THERE ARE NOTES ON THE SITE PLAN THAT ARE DONE IN
 PENCIL.PENCILED NOTES ARE UNACCEPTABLE AS THEY CAN BE
 CHANGED. ANY NOTES SHALL BE DONE IN INK.
 4) I AM QUESTIONING THE VALUE OF $2400 FOR THIS JOB,
 ESPECIALLY IF THE TANK IS INCLUDED.SUBMIT A DETAILED
 ESTIMATE OR BONA FIDE SIGNED CONTRACT FOR THE WORK. WPB
 AMEND. TO 2010 FBC SEC. 109.3.
 5) SUBMIT DETAILS FOR THE BOLLARDS. SHOW THE DIAMETER,
 MATERIAL, SPACING, OF THE BOLLARDS, DEPTH OF THE POSTS
 BELOW GROUND AND THE DISTANCE ABOVEGROUND. COMPLY WITH
 FL. ADMIN. CODE RULE 5J-20.045 (C).
 6) SHOW THE LOCATION OF THE REQUIRED SIGNAGE PER THE
 FL. ADMIN. RULE SEC.5J-20.045 (1).
 7) THE ANCHORAGE PLANS SHALL BE SIGNED AND SEALED BY
 R.F. TUCKER PER THE FLA. ADMIN. CODE RULE 61G15-23.002.
 8) INDICATE THE LENGTH OF THE EARTH ANCHORS THAT WILL
 BE USED TO COMPLY WITH 170 MPH WIND LOAD.
 9) ONE OF THE SPEC SHEETS FOR THE LP TANK HAS PART OF
 THE NOTES CUT OFF ON ONE SIDE.SUBMIT CLEAN COPIES,WPB
 AMEND. TO 2010 FBC SEC. 107.2.1.
 10) INDICATE ON THE PLAN THE TYPE OF FOUNDATION THE LP
 TANK IS RESTING UPON.WPB AMEND. TO 2010 FBC 107.2.1.
 11) SUBMIT MANUF. SPEC SHEETS FOR THE DISPENSER AND
 SHOW ANY ASSOCIATED PIPING TO THE DISPENSER.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  