| 2015-07-04 05:31:34 | 1) THE GREASE INTERCEPTOR SIZING CALCULATIONS FROM |
| | SCHIER SHOW THAT THREE GB-250 GREASE INTERCEPTORS ARE |
| | REQUIRED FOR THIS PROJECT BUT ONLY ONE IS CALLED OUT ON |
| | THE PLANS. THE PLANS SHALL SHOW ALL THREE INTERCEPTORS |
| | ON SHEETS P.01 & P.03. IF THE INTERCEPTORS WILL BE |
| | LOCATED IN A TRAFFIC AREA THEY SHALL BE PROTECTED WITH |
| | TRAFFIC LIDS.SHOW THE LOCATION OF THE INTERCEPTORS ALSO |
| | ON SHT. A.01. WPB AMEND. TO 2010 FBC 107.2.1. THE |
| | INSTALLATION SHALL COMPLY WITH THE SPECIFICATION FROM |
| | THE CITY WPB ENGINEERING DEPT. DRAWING # GS-7.1. |
| | 2) THE PREVIOUS PLAN SHOWED THE WASTE FROM KITCHEN |
| | EQUIPMENT #1 ( BLAST MACHINE) GOING TO THE SANITARY AND |
| | NOW IT IS GOING TO A DRYWELL. SUBMIT MANUF. |
| | SPECIFICATIONS FOR THE PIECE OF EQUIPMENT AND INDICATE |
| | ON THE PLAN THE SPECIFIC TYPE OF WASTE THAT WILL BE |
| | DISCHARGE FROM THIS MACHINE. IF IT IS ANYTHING OTHER |
| | THAN UNCONTAMINATED CLEAR WATER WASTE IT SHALL NOT |
| | DISCHARGE TO THE DRYWELL. IF IT REQUIRES PRE-TREATMENT |
| | IT WILL HAVE TO DISCHARGE TO THE GREASE INTERCEPTOR. IF |
| | NOT, IT SHALL DISCHARGE TO THE SANITARY. MY PREVIOUS |
| | COMMENT REFERRED TO THE CONDENSATE FROM THE WALK-IN |
| | FREEZERS DISCHARGING TO THE SANITARY. |
| | 3) SHT. P.03 - THE GAS PIPING DIAGRAM SHOWS THE |
| | TANKLESS WATER HEATER AS A RINNAI AND THE WATER PIPING |
| | DIAGRAM SHOWS A NORITZ AND THE SUBMITTED SPECS ARE FOR |
| | A NORITZ. WHICH IS IT? SUBMIT THE CORRECT SPECS FOR THE |
| | UNIT BEING INSTALLED. |
| | 4) SHT. P.03 - THE VENT THAT WAS INCREASED TO 3 INCH |
| | SHALL BE INCREASED FOR THE ENTIRE DEVELOPED LENGTH AS |
| | STATED IN THE 2010 FPC SEC. 916.2. THE SANITARY RISER |
| | SHOWS A 2" VENT INCREASING TO 3". THIS DOES NOT MEET |
| | THE INTENT OF THE CODE. |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | PLUMBING PLAN REVIEW - |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |