| Date |
Text |
| 2015-06-06 08:20:44 | 1) SUBMIT MANUFACTURER SPECIFICATIONS FOR THE EQUIPMET |
| | TO BE USED IN THE MANUFACTURING PROCESS.2010 FPC |
| | SEC.303.2, WPB AMEND. TO 2010 FBC SEC. 107.2.1. |
| | 2) A MINIMUM OF 2 DRINKING FOUNTAINS SHALL BE PROVIDED |
| | IN ACCORDANCE WITH 2010 FL. ACCESS. CODE SEC.211.2. |
| | 3) SUBMIT MANUF. SPEC SHEETS FOR THE WATER HEATER. WPB |
| | AMEND. TO 2010 FBC SEC. 107.2.1. |
| | 4) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE WATER |
| | HEATER PER 2010 FGC SEC. 304.1. |
| | 5) ALL HOSE BIBBS SHALL BE SEPARATELY VALVED PER FPC |
| | SEC.606.2. |
| | 6) SHT. A.03 - THE EQUIPMENT SCHEDULE NOTES ITEM #15 AS |
| | A GENERATOR BUT I DO NOT SEE THIS ON THE PLANS. |
| | CLARIFY. |
| | 7) INDICATE THE PSI OF THE GAS SYSTEM.THE SIZING CANNOT |
| | BE CHECKED WITHOUT THE PSI INFORMATION. |
| | 8) SUBMIT SIZING CALCULATIONS FOR THE GREASE |
| | INTERCEPTORS. THE CALCULATIONS SHALL BE REVIEWED AND |
| | APPROVED BY SCIER IN ACCORDANCE WITH 2010 FPC |
| | SEC.1003.2. CONTACT LEE SCHNEEWEISS AT 1-800-538-4792. |
| | 9) THE BRANCHVENTING APPEARS TO BE OVER 40 FEET IN |
| | DEVELOPED LENGTH. THE VENT SHALL BE INCREASED ONE PIPE |
| | SIZE TO A MINIMUM OF 3 " PER 2010 FPC SEC.916.2 & |
| | 916.4.1. |
| | 10) THE PLANS SHOW CONDENSATE LINES DISCHARGING INTO |
| | THE SANITARY SYSTEM. CLEAR WATER WASTE SHALL NOT |
| | DISCHARGE TO THE SANITARY SYSTEM PER WPB CITY ORDINANCE |
| | SEC. 90-126 ( B) (5). |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |