| Plan Review Notes For Permit 15050682 |
| Permit Number |
15050682 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2015-05-21 10:15:16 | 1) SUBMIT THE MANUFACTURERR'S SPECIFICATIONS FOR THE | | | TANKLESS WATER HEATER.GAS EQUIPMENT SHALL BE LISTED AND | | | LABELED PER 2010 FBC-R G2404.3. | | | 2) THE DESCRIPTION OF WORK ON THE PERMIT REVISION FORM | | | IS VAGUE. CLEARLY DESCRIBE ON THE REVISION FORM THE | | | COMPLETE SCOPE OF WORK THAT IS BEING DONE. WPB AMEND. | | | TO 2010 FBC SEC. 107.2.1.. | | | 3) SIZE THE SECTION OF GAS PIPING COMING OUT OF GAS | | | METER AND INDICATE THE TYPE OF PIPE MATERIAL. THE SIZE | | | AND TYPE OF MATERIAL SHALL BE CAPABLE OF SUPPLYING THE | | | ENTIRE LOAD ON THE SYSTEM. FBC-R SEC.G2413.1. | | | 4) SHT. P-1.1 - THE PLAN KEY NOTE #10 CALLS OUT A 450 | | | MBTU POOL HEATER.THIS KEYNOTE IS NOT ON THE PLAN AND | | | THE POOL HEATER ON THE PLAN IS SHOWN AS 400 MBTU. | | | CLARIFY. | | | 5) SHT. P-2.1 SHOWS THE GAS SIZING BASED ON A 0.5 PSI | | | OR LESS SYSTEM BUT THIS IS A HYBRID PRESSURE | | | SYSTEM.CLARIFY. | | | 6) SHOW ALL THE DISTANCES FROM THE LOW PRESSURE | | | REGULATORS TO THE APPLIANCES. | | | 7 SHT.P-2.2 - THE WATER RISER SHOWS TWO GAS WATERS NEAR | | | THE KITCHEN. THIS IS OBVIOUSLY A TYPO. PLEASE CORRECT. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|