| Date |
Text |
| 2015-07-16 10:36:52 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC 2010 |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY MECHANICAL |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. THE NAME, |
| | SIGNATURE AND LICENSE NUMBER IS REQUIRED ON THE |
| | MECHANICAL PLANS. FS 471.003 (2)(H) |
| | |
| | 2) FBC-R - M1401.3 SIZING. HEATING AND COOLING |
| | EQUIPMENT SHALL BE SIZED BASED ON BUILDING LOADS |
| | CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR OTHER |
| | APPROVED HEATING AND COOLING CALCULATION METHODOLOGIES. |
| | PROVIDE EQUIPMENT SIZING CALCULATIONS. THE EQUIPMENT |
| | SCHEDULE ON THE MECHANICAL PLANS ARE REQUIRED TO MATCH |
| | THE SIZING CALCULATIONS. |
| | |
| | 3) FBC-R M1507.2 EXHAUST AIR FROM BATHROOMS SHALL BE |
| | EXHAUSTED DIRECTLY TO THE OUTDOORS. |
| | |
| | 4) THE ENERGY COMPLIANCE REPORT FORM 405-10, WHICH WAS |
| | SUBMITTED, IS REQUIRED TO BE SIGNED AND DATED BY THE |
| | PREPARER AND THE OWNER/AGENT. FBC ENERGY 405.4.2 |
| | |
| | 5) THE R-VALUE FOR THE EXTERIOR CONCRETE BLOCK WALL |
| | INSULATION IS LISTED ON THE COMPLIANCE FORM AS R-5 AND |
| | THE WALL SECTION ON SHEET 10 HAS R-4.2. PLEASE CORRECT. |
| | |
| | 6) THERE IS ANOTHER R-VALUE FOR THE EXTERIOR CONCRETE |
| | BLOCK WALL INSULATION LISTED ON THE COMPLIANCE FORM AS |
| | R-13. IT APPEARS THAT THIS IS MEANT TO BE THE R-VALUE |
| | OF THE WOOD FRAME WALL BETWEEN THE GARAGE AND THE |
| | LIVING SPACE. PLEASE CORRECT. |
| | |
| | |