| 2015-08-12 16:30:40 | FITH BUILDING REVIEW COMMENTS: |
| | |
| | |
| | NOTE: THE FOLLOWING COMMENTS MAY BE APPROVED WITH |
| | PROVISO. WAITING FOR CONTRACTOR'S CONFIRMATION ON |
| | PROVISO. FEES MAY APPLY. |
| | |
| | 1- PROVIDE DRAINAGE PLAN. SEC R401.3 OF 2010 |
| | FBC-RESIDENTIAL. |
| | |
| | ***RESPONSE TO ARCHITECT'S E-MAIL DATED 8/11/15 (SEE |
| | COPY BELOW): |
| | NOTE ON DRAWING A201 PARTIALLY ADDRESSES THE |
| | REQUIREMENT. IT ONLY MENTION GUTTERS AND LEADERS. THE |
| | PURPOSE OF THIS CODE SECTION IS TO PROVIDE A LOT |
| | GRADING PLAN SHOWING HOW DIVERTING ALL THE SURFACE |
| | DRAINAGE TO A STORM SEWER CONVEYANCE OR OTHER APPROVED |
| | POINT OF COLLECTION. |
| | |
| | 2- SOIL TEST REPORT IS INCOMPLETE. PROVIDE SOIL TEST |
| | REPORT WITH ALL THE INFORMATION AS REQUIRED BY SEC. |
| | 1803.6 FBC-2010. |
| | |
| | ***RESPONSE TO ARCHITECT'S E-MAIL DATED 8/11/15 (SEE |
| | COPY BELOW): |
| | MARK FROM DELCREST WILL GET THE SOIL TEST REPORT WITH |
| | ALL THE INFORMATION. |
| | |
| | 3- DESIGNER OF RECORD TO SPECIFY ROOF TILE FASTENING AS |
| | REQUIRED BY SEC. 107.2.1.2 CITY AMENDMENTS. SPECIFY |
| | TYPE AND NUMBER OF NAILS OR SCREWS. |
| | |
| | ***RESPONSE TO ARCHITECT'S E-MAIL DATED 8/11/15 (SEE |
| | COPY BELOW): |
| | REVISED DRAWING A801 WAS NOT SUBMITTED TO THE CITY YET. |
| | E-MAIL ATTACHMENT SHOWS TYPICAL 1-STORY WALL SECTION |
| | DETAIL D1 WITH THE FOLLOWING SPECIFICATIONS: "ENTEGRA |
| | FLAT ROOF TILE (NAIL W/ (2) 8D GALV RINGSHANK COIL |
| | NAILS PER TILE. SEE ROOFING PERMIT". ROOF TILE FLORIDA |
| | PRODUCT APPROVAL FL7804-R7 SUBMITTED DOESN'T HAVE ANY |
| | INFORMATION SHOWING THE PROPOSED FASTENING. WITHOUT THE |
| | ATTACHMENT RESISTANCE INFORMATION I CAN NOT VERIFY IF |
| | THE PROPOSED NAILS WILL MEET THE DESIGN PRESSURES OF |
| | SEC. R301 OF 2010 FBC-RESIDENTIAL. ARCHITECT TO PROVIDE |
| | CALCULATIONS SHOWING THAT THE PROPOSED NAIL-ON SYSTEM |
| | WILL MEET THE DESIGN CRITERIA OF SEC. R301. (NOTE: |
| | TYPICALLY MIAMI-DADE NOA'S LIST ALL THIS INFORMATION. |
| | FLORIDA PRODUCT APPROVALS DON'T. THAT'S WHY THE |
| | ARCHITECT NEEDS TO PROVIDE THE INFORMATION). |
| | |
| | 4-PROVIDE PRODUCT APPROVAL (2 COPIES) FOR: A) MAHOGANY |
| | ENTRY DOOR SIZE AND ASSEMBLY AS SHOWN ON DOOR SCHEDULE. |
| | |
| | ***RESPONSE TO ARCHITECT'S E-MAIL DATED 8/11/15 (SEE |
| | COPY BELOW): |
| | REVISED DRAWING A202 WAS NOT SUBMITTED TO THE CITY YET. |
| | E-MAIL ATTACHMENT SHOWS REVISED DOOR SCHEDULE WITH |
| | ENTRY DOOR #102 SIZE AS FOLLOWS 3'-4" WD X 8'-0" HGT. |
| | PGT SERIES "FD-750" OUTSWING ALUMINUM FRENCH DOOR NOA |
| | 14-1117.05 SUBMITTED DOESN'T COVER DOORS WITH THE WIDTH |
| | SPECIFIED ON THE DOOR SCHEDULE. PROVIDE NEW PRODUCT |
| | APPROVAL THAT COVERS THIS SIZE OR REVISE DOOR SCHEDULE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | (561)805-6712 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | JULIO, |
| | I WANT TO APOLOGIZE AS I AM NOT SURE WHAT IS HAPPENING |
| | BUT IT SEEMS YOU AREN?T GETTING THE CORRECTION INFO I |
| | HAVE PROVIDED ON THIS JOB. |
| | ATTACHED IS MY 2ND RESPONSE LETTER TO YOU FOR THE |
| | COMMENTS FROM 7/22/15. |
| | ALSO ANY SHEETS THAT WERE REVISED AND CLOUDED REGARDING |
| | YOUR COMMENTS BELOW |
| | MY RESPONSES TO YOUR COMMENTS ARE IN GREEN BELOW |
| | 1- PROVIDE DRAINAGE PLAN. SEC R401.3 OF 2010 |
| | FBC-RESIDENTIAL. |
| | FOR THE DRAINAGE PLAN I ADDED THE ROOF GUTTER/DRAINAGE |
| | NOTE TO SHEET A201 (SEE ATTACHED SHEET A201) |
| | THIS IS WHAT I HAVE DONE ON OTHER IBIS JOBS FOR SHELLEY |
| | FRIEFELD (SOUTHERN HOMES) |
| | |
| | 2- SOIL TEST REPORT IS INCOMPLETE. PROVIDE SOIL TEST |
| | REPORT WITH ALL THE |
| | INFORMATION AS REQUIRED BY SEC. 1803.6 FBC-2010. |
| | MARK FROM DELCREST IS TRYING TO GET THE SOIL TEST INFO |
| | CORRECTED. |
| | |
| | 3- DESIGNER OF RECORD TO SPECIFY ROOF TILE FASTENING AS |
| | REQUIRED BY SEC. |
| | 107.2.1.2 CITY AMENDMENTS. SPECIFY TYPE AND NUMBER OF |
| | NAILS OR SCREWS. |
| | WE CHANGED TO NAIL DOWN ROOF ON 1ST COMMENTS AND I HAD |
| | ADDED THE NOTE TO ATTACH PER ROOFING PERMIT. |
| | I HAVE ADDED THE NAILING SPECIFIED BY THE ROOFING |
| | PERMIT (SEE ATTACHED SHEET A901) |
| | |
| | 4-PROVIDE PRODUCT APPROVAL (2 COPIES) FOR: A) MAHOGANY |
| | ENTRY DOOR SIZE AND |
| | ASSEMBLY AS SHOWN ON DOOR SCHEDULE. |
| | MAHOGANY DOOR WAS CHANGED TO PGT FD-750 OUTSWING DOOR & |
| | SIDELIGHTS ON 1ST COMMENTS (SEE ATTACHED SHEET A202) |
| | I REVIEWED & APPROVED THE NOA FOR THIS WITH ALL THE |
| | OTHER SUBMITTED NOA?S. |
| | |
| | B) ROOF TILE ADHESIVE AS SPECIFIED ON DETAIL D1 ON |
| | SHEET A801. |
| | |
| | ROOF CHANGED TO NAIL DOWN TILE ON 1ST COMMENTS |
| | |
| | C) PEEL & STICK CONCRETE ROOF TILE UNDERLAYMENT AS |
| | SPECIFIED ON DETAIL D1 OF SHEET A801. |
| | |
| | PEEL & STICK WAS ELIMINATED ON THE 1ST COMMENTS |
| | |
| | |
| | GARY STOFFT |
| | |
| | - LOT 15 BP BLDG COMMENTS 02.PDF - 1501021 LOT 15 BP |
| | A201 FL REV02.PDF - 1501021 LOT 15 BP A202 FL REV01.PDF |