| 2015-07-24 11:29:24 | 2ND REVIEW: FBC 2010 MECHANICAL |
| | |
| | 1) THE REQUESTED SUBMITTALS FOR THE DRYERS HAVE NOT |
| | BEEN REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL |
| | OF RECORD AS REQUESTED: PLEASE COMPLY AND PROVIDE |
| | EQUIPMENT SCHEDULES ON THE PLAN AS REQUESTED IN THE 1ST |
| | REVIEW. |
| | 2) AS REQUESTED IN THE FIRST REVIEW, PROVIDE MAKE-UP |
| | AIR CALCULATIONS ON THE PLAN FOR THE DRYERS- (SEE |
| | MANUFACTURER'S RECOMMENDATIONS), AND VENTILATION |
| | CALCULATIONS FOR THE NEW LAUNDRY ROOM- (TABLE 403.3 |
| | FBC-MECHANICAL). SHOW HOW ALL AIR IS BEING SUPPLIED AND |
| | CONTROLLED. |
| | 3) AS REQUESTED IN THE 1ST REVIEW, PROVIDE FRONT AND |
| | PLAN VIEWS OF THE EXHAUST VENTS: INDICATE THE TYPE AND |
| | SIZE OF THE DUCTS, LENGTH OF THE CONNECTORS, HEIGHTS OF |
| | RISERS, TOTAL RUN CALCULATIONS AND TERMINATION |
| | LOCATIONS. |
| | 4) SHOW COMPLIANCE WITH SECTION 504.4 FOR REQUIRED |
| | BACKDRAFT DAMPERS TO BE INSTALLED AT THE DRYER VENT |
| | TERMINATIONS. |
| | 5) INDICATE IF THE GAS-FIRED WATER HEATER IS NEW OR |
| | EXISTING ON THE PLAN. IF THE UNIT IS NEW, SUBMIT |
| | MANUFACTURER'S SPECIFICATIONS FOR THE WATER HEATER AND |
| | VENT SYSTEM, AND PROVIDE A VENTING DIAGRAM. THE VENTING |
| | DIAGRAM SHALL SHOW THE TYPE AND SIZE OF VENT PIPE, |
| | TOTAL LENGTH OF CONNECTORS AND RISERS, AND TERMINATION |
| | LOCATION- REFER TO SECTION 504 FBC-10 FUEL GAS. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |