| 2015-06-08 15:28:45 | 1) SUBMIT A DETAIL FOR THE GAS VENT FOR THE WATER |
| | HEATER. SHOW THE SIZE, TYPE OF VENT, HEIGHT OF VENT |
| | ABOVE ROOF. SUBMIT A ROOF PLAN SHOWING THE LOCATION OF |
| | THE VENT IN RELATION TO AIR INTAKES,PARAPET WALLS (IF |
| | APPLICABLE) .WPB AMEND. TO 2010 FBC SEC.107.2.1, 2010 |
| | FBC-FUEL GAS SEC.502,503. |
| | 2) SUBMIT A TYPICAL VENT DETAIL FOR THE GAS DRYERS.SHOW |
| | THE SIZE, TYPE OF VENT, HEIGHT OF VENT ABOVE ROOF. |
| | SUBMIT A ROOF PLAN SHOWING THE LOCATION OF THE VENT IN |
| | RELATION TO AIR INTAKES, PARAPET WALLS (IF |
| | APPLICABLE).WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| | 3) SHOW THE TYPICAL SHUTOFF VALVES ON THE WATER RISER |
| | AND ON THE WATER HEATER.WPB AMEND. TO 2010 FBC |
| | SEC.107.2.1. |
| | 4) INDICATE THE TYPICAL SIZE OF THE WATER RISER TO THE |
| | WASHING MACHINES.WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| | 5) INDICATE THE SIZE OF THE WATER HEATER IN WATER |
| | CAPACITY. (GALLONS).WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| | 6) SUBMIT AN EXISTING FLOOR PLAN AND A PROPOSED FLOOR |
| | PLAN THAT CLEARLY REFLECTS THE ENTIRE SCOPE OF WORK |
| | BEING DONE. |
| | 7) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. THE RISER |
| | DIAGRAM SHALL SHOW THE BTU LOAD OF EACH APPLIANCE, THE |
| | TOTAL BTU LOAD ON THE GAS SYSTEM, THE DEVELOPED LENGTH |
| | OF PIPING FROM THE GAS METER TO THE FURTHEST GAS |
| | OUTLET,THE LENGTH OF EACH SECTION OF PIPE, THE TYPE OF |
| | PIPE BEING INSTALLED, THE PSI OF THE GAS SYSTEM, |
| | MANUFACTURER'S SPECIFICATION SHEETS FOR ALL GAS |
| | EQUIPMENT/ APPLIANCES, THE LOCATION OF SHUTOFF VALVES, |
| | THE LOCATION OF ALL PRESSURE REGULATORS. INDICATE THE |
| | APPLICABLE GAS PIPE SIZING TABLE USED FOR THE DESIGN OF |
| | THE GAS SYSTEM. 201 FBC-FUEL GAS SEC.402.3.WPB AMEND. |
| | TO FBC SEC. 107.3.5.1.5. |
| | 8) THE EXHAUST FOR CLOTHES DRYERS SHALL COMPLY W/ 2010 |
| | FBC-FUEL GAS SEC.614. SUBMIT 2 COPIES OF THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR THE |
| | DRYERS. SUBMIT MANUF. SPECS TO DETERMINE IF DRYERS ARE |
| | RESIDENTIAL OR COMMERCIAL.WPB AMEND. TO 2010 FBC |
| | SEC.107.2.1. |
| | 9) THE WASHING MACHINES SHALLL BE INSTALLED ON A 3 INCH |
| | STACK PER 2010 FBC-PLUMBING SEC.406.3. |
| | 10) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE |
| | DRYERS AND THE WATER HEATER. COMPLY W/2010 FBC-FUEL GAS |
| | SEC.304.1 |
| | 11) SUBMIT DETAILS FOR THE STAND/SUPPORT FOR THE WATER |
| | HEATER.WPB AMEND. TO 2010 FBC SEC.107.2.1. |
| | 12) SHT. P-2 SHOWS THE GAS LINE TO THE WATER HEATER AS |
| | 1" AND ALSO AS 3/4 ". CLARIFY. |
| | 13) A LINT INTERCEPTOR IS REQUIRED FOR THE WASHING |
| | MACHINES PERR 2010 FBC-PLUMBING SEC.1003.6. |
| | 14) SUBMIT VERIFICATION THAT A 3/4" HOT AND COLD WATER |
| | LINE IS ADEQUATE TO PROVIDE THE PROPER PRESSURE AND |
| | WATER SUPPLY TO THE 18 WASHING MACHINES. 2010 |
| | FBC-PLUMBING SEC.604.1, 604.3. |
| | 15) ALL GAS EQUIPMENT/APPLIANCES SHALL BE LISTED AND |
| | LABELED PER 2010 FUEL GAS CODE SEC. 301.3. |
| | 16) GAS PIPING SHALL BE BONDED PER 2010 FBC-FUEL GAS |
| | SEC.310. |
| | 17) VENTS AND BRANCH VENTS EXCEEDING 40 FEET IN |
| | DEVELOPED LENGTH SHALL BE INCREASED BY ONE PIPE SIZE IN |
| | ACCORDANCE WITH 2010 FBC-PLUMBING SEC. 916.2, 916.4. |
| | |
| | NOTE:A THOROUGH AND COMPREHENSIVE PLAN REVIEW CANNOT BE |
| | DONE UNTIL ALL THE ABOVE INFORMATION IS PROVIDED. IN |
| | ADDITION, APPROVAL FROM THE CITY'S ZONING DEPT. MAY |
| | REQUIRED FOR THE LOCATION OF THE DRYER AND GAS VENTS |
| | ONCE DETAILS ARE SUBMITTED. |
| | |
| | |
| | |
| | PLUMBING PLAN REVIEW |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | 561-805-6692 |
| | [email protected] |
| | |