Plan Review Notes
Plan Review Notes For Permit 15050267
Permit Number 15050267
Review Stop P
Sequence Number 1
Notes
Date Text
2015-06-08 15:28:451) SUBMIT A DETAIL FOR THE GAS VENT FOR THE WATER
 HEATER. SHOW THE SIZE, TYPE OF VENT, HEIGHT OF VENT
 ABOVE ROOF. SUBMIT A ROOF PLAN SHOWING THE LOCATION OF
 THE VENT IN RELATION TO AIR INTAKES,PARAPET WALLS (IF
 APPLICABLE) .WPB AMEND. TO 2010 FBC SEC.107.2.1, 2010
 FBC-FUEL GAS SEC.502,503.
 2) SUBMIT A TYPICAL VENT DETAIL FOR THE GAS DRYERS.SHOW
 THE SIZE, TYPE OF VENT, HEIGHT OF VENT ABOVE ROOF.
 SUBMIT A ROOF PLAN SHOWING THE LOCATION OF THE VENT IN
 RELATION TO AIR INTAKES, PARAPET WALLS (IF
 APPLICABLE).WPB AMEND. TO 2010 FBC SEC.107.2.1.
 3) SHOW THE TYPICAL SHUTOFF VALVES ON THE WATER RISER
 AND ON THE WATER HEATER.WPB AMEND. TO 2010 FBC
 SEC.107.2.1.
 4) INDICATE THE TYPICAL SIZE OF THE WATER RISER TO THE
 WASHING MACHINES.WPB AMEND. TO 2010 FBC SEC.107.2.1.
 5) INDICATE THE SIZE OF THE WATER HEATER IN WATER
 CAPACITY. (GALLONS).WPB AMEND. TO 2010 FBC SEC.107.2.1.
 6) SUBMIT AN EXISTING FLOOR PLAN AND A PROPOSED FLOOR
 PLAN THAT CLEARLY REFLECTS THE ENTIRE SCOPE OF WORK
 BEING DONE.
 7) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. THE RISER
 DIAGRAM SHALL SHOW THE BTU LOAD OF EACH APPLIANCE, THE
 TOTAL BTU LOAD ON THE GAS SYSTEM, THE DEVELOPED LENGTH
 OF PIPING FROM THE GAS METER TO THE FURTHEST GAS
 OUTLET,THE LENGTH OF EACH SECTION OF PIPE, THE TYPE OF
 PIPE BEING INSTALLED, THE PSI OF THE GAS SYSTEM,
 MANUFACTURER'S SPECIFICATION SHEETS FOR ALL GAS
 EQUIPMENT/ APPLIANCES, THE LOCATION OF SHUTOFF VALVES,
 THE LOCATION OF ALL PRESSURE REGULATORS. INDICATE THE
 APPLICABLE GAS PIPE SIZING TABLE USED FOR THE DESIGN OF
 THE GAS SYSTEM. 201 FBC-FUEL GAS SEC.402.3.WPB AMEND.
 TO FBC SEC. 107.3.5.1.5.
 8) THE EXHAUST FOR CLOTHES DRYERS SHALL COMPLY W/ 2010
 FBC-FUEL GAS SEC.614. SUBMIT 2 COPIES OF THE
 MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR THE
 DRYERS. SUBMIT MANUF. SPECS TO DETERMINE IF DRYERS ARE
 RESIDENTIAL OR COMMERCIAL.WPB AMEND. TO 2010 FBC
 SEC.107.2.1.
 9) THE WASHING MACHINES SHALLL BE INSTALLED ON A 3 INCH
 STACK PER 2010 FBC-PLUMBING SEC.406.3.
 10) SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR THE
 DRYERS AND THE WATER HEATER. COMPLY W/2010 FBC-FUEL GAS
 SEC.304.1
 11) SUBMIT DETAILS FOR THE STAND/SUPPORT FOR THE WATER
 HEATER.WPB AMEND. TO 2010 FBC SEC.107.2.1.
 12) SHT. P-2 SHOWS THE GAS LINE TO THE WATER HEATER AS
 1" AND ALSO AS 3/4 ". CLARIFY.
 13) A LINT INTERCEPTOR IS REQUIRED FOR THE WASHING
 MACHINES PERR 2010 FBC-PLUMBING SEC.1003.6.
 14) SUBMIT VERIFICATION THAT A 3/4" HOT AND COLD WATER
 LINE IS ADEQUATE TO PROVIDE THE PROPER PRESSURE AND
 WATER SUPPLY TO THE 18 WASHING MACHINES. 2010
 FBC-PLUMBING SEC.604.1, 604.3.
 15) ALL GAS EQUIPMENT/APPLIANCES SHALL BE LISTED AND
 LABELED PER 2010 FUEL GAS CODE SEC. 301.3.
 16) GAS PIPING SHALL BE BONDED PER 2010 FBC-FUEL GAS
 SEC.310.
 17) VENTS AND BRANCH VENTS EXCEEDING 40 FEET IN
 DEVELOPED LENGTH SHALL BE INCREASED BY ONE PIPE SIZE IN
 ACCORDANCE WITH 2010 FBC-PLUMBING SEC. 916.2, 916.4.
  
 NOTE:A THOROUGH AND COMPREHENSIVE PLAN REVIEW CANNOT BE
 DONE UNTIL ALL THE ABOVE INFORMATION IS PROVIDED. IN
 ADDITION, APPROVAL FROM THE CITY'S ZONING DEPT. MAY
 REQUIRED FOR THE LOCATION OF THE DRYER AND GAS VENTS
 ONCE DETAILS ARE SUBMITTED.
  
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  