| 2015-10-06 10:17:07 | BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 15050262 |
| | ADD: 1851 DIVISION AVE. |
| | CONT: LANDMARK |
| | CONTACT: JORGE COSTAS |
| | TEL: (305)665-1146 |
| | E-MAIL: [email protected] |
| | |
| | 2010 FLORIDA BUILDING CODE W 2010 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION, 2010 EDITION 2012 FBC SUPPLEMENTS |
| | ADOPTED APRIL 25/2013. |
| | |
| | 3RD REVIEW |
| | DATE: TUES. OCT.06/2015 |
| | SILVER PALM PLACE |
| | BLDG # 3/ 29 UNITS/ 4 STORY/BLDG TYPE: III-B/ R2 |
| | |
| | ACTION: PROVISO |
| | |
| | THIS REVIEW IS FOR BUILDING # 3 AND DOES NOT INCLUDE |
| | ANY SITE AMENITIES, POOL, POOL DECK, FENCING, PAVING, |
| | SIDEWALKS, AND OR PARKING LOT & STRIPING, ACCESSIBILITY |
| | AND OR FAIR HOUSING, TEMPORARY TRAILER / CONSTRUCTION |
| | OFFICES FOR ANY OF THE ABOVE MENTIONED AREAS. THEY WILL |
| | NEED TO TOO BE REVIEWED UNDER SEPARATE PERMIT WITH |
| | ASSOCIATED COST. |
| | |
| | 1)PROVISO: PRODUCT APPROVALS/ DEFERRED SUBMITTALS. 2010 |
| | FBC-B 1609.1.2 PROTECTION OF OPENINGS, 1609.6.4.4.1 |
| | COMPONENTS & CLADDING. |
| | |
| | 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE |
| | APPLICATION AND THAT ARE TO BE SUBMITTED TO THE |
| | BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | SHALL LIST THE DEFERRED SUBMITTALS ON |
| | THE CONSTRUCTION DOCUMENTS FOR REVIEW BY THE BUILDING |
| | OFFICIAL. |
| | DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE |
| | SUBMITTED TO THE REGISTERED DESIGN |
| | PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL REVIEW |
| | THEM AND FORWARD THEM TO THE |
| | BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE |
| | DEFERRED SUBMITTAL DOCUMENTS HAVE |
| | BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO |
| | THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL |
| | ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING |
| | OFFICIAL. |
| | |
| | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. |
| | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION |
| | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: |
| | (31)(D) ROOFING PRODUCTS AND ASSEMBLIES |
| | (G) PRE-ENGINEERED A/C STANDS |
| | |
| | |
| | 1B) )PROVISO: FOR ROOFING APPROVALS: FLAT ROOF. |
| | HIGHLIGHT THE SUB-SYSTEM TO BE INSTALLED, NOTE THE |
| | PRESSURES, IF THEY REQUIRE ENHANCED FASTENING, RAS 117 |
| | CALCULATIONS, AND SIGNED & SEALED CALCULATIONS. |
| | |
| | 1C) )PROVISO: FOR THE SLOPED ROOF: PROVIDE THE TYPE OF |
| | TILE TO BE INSTALLED, CIRCLE, TYPE OF FASTENER, IF |
| | FOAMED, IDENTIFY SIZE OF FOAM PATTY WITH ASSOCIATED |
| | PRESSURES. |
| | |
| | 1D) 2)PROVISO: EITHER THE DESIGN PROFESSIONAL OR THE |
| | CONTRACTOR CAN ELECT TO DEFER THE SUBMISSION OF THE |
| | PRODUCT APPROVALS TO AFTER PERMIT ISSUANCE IF THE |
| | PRESSURES FOR THE BUILDING ARE CORRECT AND A WRITTEN |
| | DOCUMENT ASKING FOR THE PRODUCT APPROVALS TO BE |
| | DEFERRED SUBMITTALS. |
| | 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| | SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| | PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| | TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| | THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| | DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| | APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| | DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| | THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| | FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| | DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| | REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| | WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| | OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| | SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| | IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| | THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| | UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| | APPROVED BY THE BUILDING OFFICIAL. |
| | |
| | 2 )PROVISO: 2010 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE |
| | PRODUCTS WHICH ARE REGULATED BY THE DCA RULE 9N-03 |
| | SHALL BE REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR |
| | JURISDICTIONAL APPROVAL. |
| | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR |
| | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, |
| | SHOP DRAWINGS ETC.. |
| | |
| | JAMES A. WITMER CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | TEL: 561-805-6715 |
| | FAX: 561-805-6676 |