| 2015-06-17 10:16:06 | 1ST REVIEW: FBC 2010 MECHANICAL- 6/17/15 |
| | PERMIT # 15050262 |
| | SILVER PALMS PLACE- BLDG. #3 |
| | |
| | 1) THE ENERGY CALCULATIONS FOR BUILDING #3 DO NOT |
| | INCLUDE DATA AND COMPLIANCE INFO FOR AC-1 (TRASH ROOM |
| | ON GROUND FLOOR). |
| | 2) THE REQUIRED AC LOAD CALCULATIONS WERE NOT INCLUDED |
| | WITH THE SUPPORTING DOCUMENTS- SECTIONS 101.5 AND |
| | 503.2.1 FBC-10 ENERGY CONSERVATION. |
| | 3) SHEETS M1.11- M1.14: EXHAUST SYSTEMS AT A RATE OF |
| | 1.00 CFM PER SF ARE REQUIRED FOR THE TRASH ROOMS AND |
| | THE TRASH CHUTES SHOWN ON THE GROUND THRU 4TH FLOORS- |
| | TABLE 6-4 ASHRAE 62.1- 07. PLEASE REVISE THE PLANS |
| | ACCORDINGLY, AND CLARIFY WHY ONLY THE GROUND FLOOR |
| | TRASH ROOM IS BEING CONDITIONED BY AC-1. |
| | 4) M2.00 & M2.01: THE DRYER BOOSTER FANS SHOWN IN UNITS |
| | A, AND A & C ACCESSIBLE UNITS ARE PROHIBITED BY THE |
| | CITY OF WEST PALM BEACH FIRE RESCUE. |
| | 5) M2.00 & M2.01: THE RINNAI DIRECT GAS VENTS SHALL BE |
| | LISTED FOR PLENUM INSTALLATIONS PER SECTION 503.2.3 |
| | FBC-10 FUEL GAS. SUBMIT MANUFACTURER'S SPECIFICATIONS |
| | FOR THE WATER HEATER AND VENTING SYSTEM REVIEWED AND |
| | APPROVED BY THE DESIGN PROFESSIONAL OF RECORD. |
| | 6) M2.00 & M2.01: PLACE A NOTE INDICATING THE REQUIRED |
| | CLEARANCE DISTANCES FOR THE THRU-WALL TERMINATION OF |
| | THE RINNAI DIRECT CONCENTRIC VENT. |
| | 7) M3.00: PLEASE REMOVE OR REVISE ALL HVAC NOTES |
| | REFERENCING CODE SECTIONS FROM THE FBC-10 RESIDENTIAL |
| | CODE. THE PROPOSED PROJECT IS REGULATED BY THE FBC-10 |
| | BUILDING CODES. |
| | 8) M3.00: THE HVAC REFRIGERANT PIPING NOTES SHALL |
| | INDICATE THE PIPING INSULATION IS PLENUM RATED PER |
| | SECTION 602.2.1 FBC-10. |
| | 9) M1.15: PROVIDE A SEQUENCE OF OPERATION FOR THE |
| | MOTORIZED EXHAUST DAMPER AT THE SIDEWALL OF THE |
| | ELEVATOR SHAFT. |
| | 10) PIPE PENETRATION SEALS: SHEETS A.10.06 & A10.07 |
| | SHOW TREMCO FIRE STOPPING DETAILS, AND SHEET A.10.08 |
| | SHOWS HILTI. PLEASE SELECT ONE SYSTEM OR THE OTHER FOR |
| | THE AC REFRIGERANT AND CONDENSATE PIPINGS. |
| | 11) PROVIDE A TYPICAL SECTION CUT FOR THE AHU'S IN THE |
| | PLENUM CLOSET INDICATING CLOSET CONSTRUCTION MATERIALS, |
| | CLEARANCES DISTANCE MEASUREMENTS AROUND THE UNITS, |
| | REFRIGERANT PIPING RUNS, AND PRIMARY AND SECONDARY |
| | CONDENSATE DISPOSAL DETAILS PER SECTION 307 FMC-10 ( |
| | INCLUSIVE OF ALL SUB-SECTIONS). |
| | 12) M3.01: WIND LOAD DESIGN PRESSURE CALCULATIONS AND |
| | TIE-DOWN ENGINEERING ARE REQUIRED FOR ANCHORING THE |
| | CONDENSER STANDS AND CONDENSER UNIS TO THE ROOF |
| | STRUCTURE- SECTION 301.12 FMC-10, AND SECTION 1609 |
| | FBC-10 BUILDING. PLEASE REVISE THE DETAIL ACCORDINGLY |
| | AND CORRECT THE 150 MPH WIND LOAD SPECIFICATION. |
| | 13) PROVIDE A SUBMITTAL PACKAGE WITH ALL DOCUMENTS |
| | REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL OF |
| | RECORD. PLEASE INCLUDE NOA'S, PRODUCT APPROVALS, AND |
| | MANUFACTURER'S SPECIFICATIONS FOR THE CONDENSER STANDS, |
| | THE EXHAUST AND O/A INTAKE FANS, THE O/A MOTORIZED |
| | DAMPERS, THE EXHAUST AND INTAKE WALL LOUVERS, THE |
| | ELEVATOR SHAFT MOTORIZED DAMPER, THE AC SYSTEMS, THE |
| | GAS WATER HEATER AND VENT SYSTEM, AND THE REFRIGERANT |
| | PIPE INSULATION. |
| | |
| | CHRISTOPHER COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |